***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: LIVE OAK HIGHWAY: SH 72 LENGTH: 2.727 MI CONTROL NUMBER: 0270-09-026 DBE GOAL: 3.0 % PROJECT NUMBER: STP 2013(254) TYPE: WIDEN AND OVERLAY ROADWAY TIME FOR COMPLETION: 86 WORKING DAYS GUARANTY: 63,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 4, 2012 * EST.COST: 3,141,772.39 BIDS WILL BE OPENED: 1:00 PM December 4, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION TOMAS CASTRO TREVINO AUSTIN HQ - RIVERSIDE ANNEX 1071 NORTH US 281 200 E RIVERSIDE ROOM 1B.1 ALICE TX 78332 AUSTIN TX 78704-1204 (361)661-7050 (512)416-2498 LIMITS FROM: US 281 LIMITS TO: IH 37 ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 100 2009 002 PREPARING ROW (TREE) (6" TO 24" DIA) EA 3.000 104 2017 REMOVING CONC (DRIVEWAYS) SY 116.000 112 2002 SUBGRADE WIDENING (DENS CONT) STA 110.000 134 2001 BACKFILL (TY A) STA 144.000 164 2023 002 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 28,000.000 166 2002 001 FERTILIZER TON 1.080 168 2001 VEGETATIVE WATERING MG 462.670 247 2366 033 FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS) CY 6,036.000 275 2001 003 CEMENT TON 237.000 275 2010 003 CEMENT TREAT (SUBGRADE) (8") SY 23,939.000 310 2019 PRIME COAT (MC-30 OR SS-1) GAL 3,830.000 316 2402 016 ASPH (AC-5, AC-10, CRS-2, OR HFRS-2) GAL 116.000 316 2403 016 ASPH (AC-15P, HFRS-2P, OR CRS-2P) GAL 26,525.000 316 2590 016 AGGR(TY PB GR 4 OR TY PB GR 4S)SAC-B CY 924.000 351 2002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 2,889.000 354 2002 PLAN & TEXT ASPH CONC PAV(0" TO 2") SY 17,803.000 420 2037 002 CL C CONC (VALLEY GUTTER) SY 53.000 462 2001 015 CONC BOX CULV (3 FT X 2 FT) LF 48.000 462 2003 015 CONC BOX CULV (4 FT X 2 FT) LF 52.000 462 2018 015 CONC BOX CULV (7 FT X 7 FT) LF 52.000 464 2003 006 RC PIPE (CL III)(18 IN) LF 676.000 464 2005 006 RC PIPE (CL III)(24 IN) LF 60.000 466 2048 WINGWALL (PW)(HW=4 FT) EA 3.000 466 2053 WINGWALL (PW)(HW=9 FT) EA 2.000 467 2101 SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C) EA 5.000 467 2286 SET (TY II)(18 IN)(RCP)(6:1)(P) EA 42.000 467 2288 SET (TY II)(24 IN)(RCP)(6:1)(P) EA 4.000 496 2004 REMOV STR (SET) EA 6.000 496 2006 REMOV STR (HEADWALL) EA 10.000 496 2007 REMOV STR (PIPE) LF 356.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 530 2017 006 TURNOUTS (ACP) SY 13,501.000 530 2030 006 DRIVEWAYS (ACP)(TYPE 1) SY 2,188.000 530 2031 006 DRIVEWAYS (ACP)(TYPE 2) SY 3,192.000 530 2032 006 DRIVEWAYS (ACP)(TYPE 3) SY 940.000 560 2006 001 MAILBOX INSTALL-S (RR-POST) TY 4 FND-TB EA 9.000 560 2007 001 MAILBOX INSTALL-D (TWW-POST)TY 4 FND-TB EA 3.000 560 2008 001 MAILBOX INSTALL-M (TWW-POST)TY 4 FND-TB EA 3.000 644 2022 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 32.000 644 2025 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 45.000 644 2027 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 1.000 644 2028 IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT) EA 3.000 644 2030 IN SM RD SN SUP&AM TYS80(1)SA(U-BM) EA 3.000 644 2032 IN SM RD SN SUP&AM TYS80(1)SB(P) EA 8.000 644 2033 IN SM RD SN SUP&AM TYS80(1)SB(P-BM) EA 4.000 644 2035 IN SM RD SN SUP&AM TYS80(1)SB(T) EA 8.000 644 2058 RELOCATE SM RD SN SUP & AM TY S80 EA 102.000 644 2060 REMOVE SM RD SN SUP & AM EA 102.000 658 2337 INSTL OM ASSM (OM-2Z)(FLX)GND(BI) EA 5.000 662 2113 WK ZN PAV MRK SHT TERM (TAB) TY W EA 196.000 662 2115 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 3,716.000 666 2035 REFL PAV MRK TY I (W) 8" (SLD)(090MIL) LF 3,985.000 668 2105 PREFAB PAV MRK TY C (W) (24") (SLD) LF 252.000 668 2106 PREFAB PAV MRK TY C (W) (ARROW) EA 56.000 668 2116 PREFAB PAV MRK TY C (W) (WORD) EA 4.000 668 2117 PREFAB PAV MRK TY C (W) (18")(YLD TRI) EA 20.000 668 2128 PREFAB PAV MRK TY C (Y) (24") (SLD) LF 177.000 672 2012 034 REFL PAV MRKR TY I-C EA 119.000 672 2015 034 REFL PAV MRKR TY II-A-A EA 657.000 672 2017 034 REFL PAV MRKR TY II-C-R EA 55.000 752 2022 TREE REMOVAL (4"-12" DIA) EA 1.000 752 2023 TREE REMOVAL (12"-18" DIA) EA 7.000 752 2024 TREE REMOVAL (18"-24" DIA) EA 5.000 760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF 21,545.000 1122 2016 001 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 78.000 1122 2019 001 CONSTRUCTION EXITS (REMOVE) SY 78.000 1122 2048 001 BIOGRD EROSN CONT LOGS (12" DIA)INSTALL LF 210.000 1122 2049 001 BIOGRD EROSN CONT LOGS (18" DIA)INSTALL LF 320.000 1122 2056 001 BIODEGRADBLE EROSION CONTROL LOGS REMOV LF 530.000 3224 2048 D-GR HMA(QCQA) TY-D SAC-B PG76-22 TON 9,065.000 3224 2075 D-GR HMA (QC/QA) TY B SAC-B PG (76-22) TON 4,026.000 6055 2001 IN-LANE OR TRANSVERSE RUMBLE STRIP LF 160.000 6834 2001 001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 30.000 8251 2002 005 RE PM W/RET REQ TY I(W)4"(BRK)(090MIL) LF 1,296.000 8251 2005 005 RE PM W/RET REQ TY I(W)4"(SLD)(090MIL) LF 29,590.000 8251 2014 005 RE PM W/RET REQ TY I(Y)4"(BRK)(090MIL) LF 4,630.000 8251 2017 005 RE PM W/RET REQ TY I(Y)4"(SLD)(090MIL) LF 30,214.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $ 4,140.00