***** OFFICIAL NOTICE ***** *** STATE LET CONSTRUCTION CONTRACT *** COUNTY: WHARTON HIGHWAY: FM 1162 LENGTH: 9.350 MI CONTROL NUMBER: 1304-01-018 DBE GOAL: 3.0 % PROJECT NUMBER: STP 2013(245)HES TYPE: WIDEN ROADWAY TIME FOR COMPLETION: 105 WORKING DAYS GUARANTY: 35,000.00 BIDS RECEIVED UNTIL: 1:00 PM December 4, 2012 * EST.COST: 1,768,569.70 BIDS WILL BE OPENED: 1:00 PM December 4, 2012 MAIL OR DELIVER BIDS TO: FOR QUESTIONS CALL: TEXAS DEPARTMENT OF TRANSPORTATION WOOLDRIDGE, MARK AUSTIN HQ - RIVERSIDE ANNEX 1512 FM 102 200 E RIVERSIDE ROOM 1B.1 WHARTON TX 77488 AUSTIN TX 78704-1204 (979)532-3141 (512)416-2498 LIMITS FROM: 0.1 MI. EAST OF US 59 LIMITS TO: 0.07 MI. SOUTH OF CR 422 ------------------------------------------------------------------------------ ITEM DES S.P APPROXIMATE ALT NO. CD. NO. ITEM DESCRIPTION UNIT QUANTITIES ------------------------------------------------------------------------------ 112 2001 SUBGRADE WIDENING (ORD COMP) STA 492.210 132 2021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 2,097.000 150 2002 BLADING HR 10.000 164 2015 002 STRAW/HAY MLCH SEED(PERM)(RURAL)(CLAY) SY 109,380.000 164 2047 002 STRAW/HAY MLCH SEED(TEMP)(WARM) SY 27,345.000 164 2049 002 STRAW/HAY MLCH SEED(TEMP)(COOL) SY 27,345.000 168 2001 VEGETATIVE WATERING MG 920.700 247 2042 033 FL BS (CMP IN PLC)(TY A GR 2)(FNAL POS) CY 9,714.000 316 2015 016 ASPH (RC-250) GAL 4,304.000 316 2223 016 AGGR(TY-PB GR-4 SAC-B) CY 248.000 316 2566 016 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 10,978.000 316 2675 016 AGGR (TY-E GR-5) CY 155.000 351 2006 FLEXIBLE PAVEMENT STRUCTURE REPAIR(10") SY 2,663.000 400 2005 CEM STABIL BKFL CY 4.000 402 2001 TRENCH EXCAVATION PROTECTION LF 23.000 432 2033 RIPRAP (STONE COMMON)(DRY)(12 IN) CY 7.000 462 2001 015 CONC BOX CULV (3 FT X 2 FT) LF 2.000 462 2003 015 CONC BOX CULV (4 FT X 2 FT) LF 6.000 462 2006 015 CONC BOX CULV (5 FT X 2 FT) LF 4.000 462 2011 015 CONC BOX CULV (6 FT X 4 FT) LF 23.000 462 2061 015 CONC BOX CULV (9 FT X 3 FT) LF 13.000 464 2005 006 RC PIPE (CL III)(24 IN) LF 9.000 467 2049 SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1)(C) EA 3.000 467 2101 SET (TY I)(S= 3 FT)(HW= 3 FT)(4:1)(C) EA 2.000 467 2107 SET (TY I)(S= 4 FT)(HW= 3 FT)(4:1)(C) EA 2.000 467 2113 SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1)(C) EA 1.000 467 2121 SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1)(C) EA 7.000 467 2224 SET (TY II)(24 IN)(RCP)(4:1)(C) EA 1.000 467 2894 SET (TY I)(S= 9FT)(HW= 4FT)(6:1)(P) EA 2.000 500 2001 011 MOBILIZATION LS 1.000 502 2001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 530 2018 006 TURNOUTS (SURF TREAT) SY 540.000 530 2050 006 DRIVEWAYS (SURF TREAT) (TYPE 1) SY 1,397.000 530 2051 006 DRIVEWAYS (SURF TREAT) (TYPE 2) SY 1,632.000 560 2004 001 MAILBOX INSTALL-S (WC-POST) TY 3 FND EA 14.000 560 2005 001 MAILBOX INSTALL-D (WC-POST) TY 3 FND EA 4.000 644 2001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 62.000 644 2004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 1.000 644 2060 REMOVE SM RD SN SUP & AM EA 63.000 658 2337 INSTL OM ASSM (OM-2Z)(FLX)GND(BI) EA 13.000 662 2004 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 98,744.000 1122 2003 001 ROCK FILTER DAMS (INSTALL) (TY 3) LF 205.000 1122 2009 001 ROCK FILTER DAMS (REMOVE) LF 205.000 1122 2037 001 TEMPORARY SEDIMENT CONTROL FENCE INSTLL LF 2,050.000 1122 2057 001 TEMPORARY SEDIMENT CONTROL FENCE REMOVE LF 2,050.000 8251 2006 005 RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) LF 98,744.000 8251 2015 005 RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) LF 11,186.000 8251 2018 005 RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) LF 23,535.000 * INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS: CONTRACTOR FORCE ACCOUNT WORK (PART) $ 2,600.00