State Let Construction Contracts For July 2015

Link to Unofficial Bid Item Index - Projects 42 to 21 days away from Let Date
Link to Official Bid Item Index - Projects up to 21 days or more away from Let Date
 
* = Mandatory Pre-Bid Conference, see either Official or Unofficial Bid Item Index pages for further information.
 
Help Page For Opening CSJ or UCSJ File Links Under Control CSJ Column
 
Updated Monday, July 06, 2015 @ 6:31:31 PM (CST)

State Let Construction Contracts For July 2015 (Total Projects: 88)
District County Highway Type of Work Let Date Project No. Control CSJ Est. Cost Waived/
Federal
AtlantaBowieIH 369DECK CRACK SEAL07/07/15BR 1502(418)0218-02-045 $822,928.00 F
AtlantaCassVAPAVEMENT MARKINGS07/07/15STP 1502(420)0919-00-071 $1,573,500.00 F
AustinBastropSH 21INSTALL CONTINUOUS TURN LANE07/07/15STP 1502(386)HES0471-05-039 $723,266.10 F
AustinHaysRM 12ADD CENTER TURN LANE AND SHOULDERS07/07/15STP 1502(387)HES0683-05-012 $1,022,817.00 F
AustinTravisIH 35LANDSCAPING AND IRRIGATION07/07/15NH 1502(381)0016-01-114 $620,044.50 F
AustinTravisUS 290LANDSCAPING AND IRRIGATION07/07/15NH 1502(382)0114-02-100 $788,881.60 F
BeaumontJeffersonIH 10RECONSTRUCT INTERCHANGE07/07/15C 739-2-1550739-02-155 $24,837,749.75
BrownwoodStephensUS 180BASE OVERLAY,2CST,ADD PASSING LANES07/07/15STP 1302(081)0011-07-047 $3,955,130.70 F
BryanMadisonIH 45CONVERT FRT RD TO ONE-WAY OPERATION07/07/15NH 1502(428)0675-05-082 $3,545,094.63 F
Corpus ChristiBeeSH 202SPOT BASE REPAIR AND OVERLAY07/07/15STP 1502(436)0447-03-039 $7,832,951.88 F
Corpus ChristiJim WellsFM 70PROVIDE ADDITIONAL PAVED SURFACE WIDTH07/07/15STP 2014(627)HES1088-01-022 $4,203,174.58 F
Corpus ChristiNuecesSH 44CONSTRUCT OVERPASS AT FM 3386-MCKINZIE RD.07/07/15NH 2013(751)0102-01-106 $16,634,319.91 F
Corpus ChristiNuecesFM 70INSTALL ADVANCED WARNING SIGNALS07/07/15STP 1502(439)HES1558-02-034 $1,483,788.71 F
DallasDallasCSTRAFFIC SIGNALS07/07/15STP 1502(494)HES0918-47-101 $585,293.92 F
DallasDentonFM 407LANDSCAPE DEVELOPMENT07/07/15STP 1502(498)1785-01-035 $610,709.05 F
DallasEllisFM 66WIDEN, SAFETY TREAT FIXED OBJ & CENTERLINE TEXTURE07/07/15STP 1502(491)HES0596-02-043 $3,844,517.76 F
DallasNavarroIH 45WIDEN FREEWAY FROM 4 TO 6 LANES AND INSTALL ITS07/07/15NH 1502(486)0093-01-098 $90,111,417.57 F
El PasoEl PasoFM 258REPLACE STRUCTURE07/07/15BR 1502(392)0002-14-042 $421,032.32W F
El PasoHudspethIH 10BRIDGE MAINTENANCE07/07/15BR 1502(391)0002-07-046 $808,784.53 F
El PasoHudspethRM 1111REPLACE STRUCTURE07/07/15BR 1502(393)1282-02-018 $1,963,406.36 F
Fort WorthTarrantBU 287PINTERSEC. IMPRVMNT INCLD TRAF. SIGNAL07/07/15STP 2015(851)0013-10-070 $667,188.02 F
HoustonHarrisVACOMMUNICATIONS/RELIABILITY UPGRADE07/07/15CM 2015(611)0912-00-488 $1,348,462.88 F
HoustonHarrisFM 2920BS REP, MILL, SC INTERLAYER,OL, ETC.07/07/15STP 1502(020)2941-02-050 $3,818,433.79 F
HoustonHarrisSL 8LANDSCAPE DEVELOPMENT07/07/15HP 1502(450)3256-01-106 $758,189.05 F
LaredoDimmitFM 1019WIDEN,BASE,GRADE,SURF TREAT,STRT,MBGF,PAV MKS07/07/15STP 1502(455)HES1270-01-026 $2,593,668.78 F
LaredoLa SalleSH 97CONCRETE INTERSECTION07/07/15STP 1302(033)0483-01-046 $1,938,120.74 F
LaredoLa SalleFM 468GRADING, BASE, SURFACING & PAV MRKS07/07/15STP 1502(456)1545-02-021 $9,683,026.79 F
LaredoWebbIH 35IMPROVE TRAFFIC SIGNAL ON FR07/07/15STP 1502(517)HES0018-06-168 $200,209.50W F
LaredoWebbUS 83TEXTURING SHOULDERS AND CENTERLINE07/07/15STP 2015(211)HESG0037-09-030 $395,505.99W F
LaredoZavalaFM 2691BASE,GRADE,ACP,STRT,MBGF,PAV MKS07/07/15STP 1502(458)HES1937-02-026 $2,579,677.75 F
LufkinPolkCRREPLACE BRIDGE AND APPROACHES07/07/15BR 1402(188)0911-04-059 $1,016,318.78 F
OdessaEctorSL 338REHABILITATION OF EXISTING ROAD07/07/15NH 1502(409)2224-01-093 $3,958,513.18 F
OdessaMidlandCSWIDEN NON-FREEWAY07/07/15STP 1502(406)0906-32-049 $4,859,261.98 F
ParisLamarCRREPLACE BRIDGE AND APPROACHES07/07/15BR 2014(599)0901-29-065 $561,490.09 F
PharrCameronFM 106BRIDGE REHABILITATION07/07/15BR 1502(468)0630-02-041 $9,422,888.00 F
PharrHidalgoUS 83GR., STRS. AND SURF07/07/15NH 1502(464)0039-02-040 $86,241,875.58 F
PharrHidalgoBU 83-SCONCRETE OVERLAY AND RAIL WORK07/07/15BR 1502(465)0039-04-123 $2,930,594.40 F
San AngeloIrionUS 67PASSING LANES07/07/15STP 1502(413)0077-02-031 $32,072,084.28 F
San AntonioGuadalupeFM 3009CONSTRUCT SIDEWALKS07/07/15STP 1502(472)MM3107-02-034 $3,313,808.40 F
TylerGreggVALANDSCAPE PLANTING & IRRIGATION07/07/15STP 1502(475)0910-07-066 $437,585.00 F
WacoHillCRREPLACE BRIDGE AND APPROACHES07/07/15BR 2014(198)0909-37-060 $455,542.20 F
YoakumDe WittSH 119SAFETY TREAT FIXED OBJECTS AND WIDEN SHOULDERS07/07/15STP 1502(477)HES0359-03-026 $5,483,282.45 F
AmarilloPotterIH 40RELOCATE ENTRANCE AND EXIT RAMPS, REPLACE BRIDGES07/08/15NH 1502(372)0275-01-166 $22,189,868.61 F
AtlantaCassUS 59BRIDGE RAIL & MBGF07/08/15BR 1502(419)0218-04-114 $843,524.50 F
AtlantaHarrisonUS 59PLANING,ACP,CPCD & PAV MRKS07/08/15NH 2013(617)0062-07-086 $5,699,213.55 F
AustinBurnetSS 191REPLACE BRIDGE AND APPROACHES07/08/15BR 1502(389)0700-05-007 $802,177.85 F
AustinBurnetRM 2341SAFETY TREATMENTS, ADD PAVE WIDTH07/08/15STP 1502(390)HES2206-01-015 $3,060,058.25 F
AustinLeeUS 290INSTALL CONTINUOUS TURN LANE AND PAVED SHOULDERS07/08/15STP 1502(383)HES0114-07-075 $4,141,434.35 F
AustinTravisSH 130LANDSCAPING AND IRRIGATION07/08/15NH 1502(385)0440-06-014 $598,298.50 F
BeaumontChambersIH 10RELOCATE EASTBOUND EXIT RAMP07/08/15IM 0108(182)0508-02-112 $1,374,565.60 F
BryanMilamUS 190INSTALL CONTINUOUS TURN LANE07/08/15STP 1502(512)HES0185-03-029 $97,788.45W F
ChildressWheelerUS 83WIDENING OF A NON FREEWAY FACILITY07/08/15STP 1502(377)0030-09-047 $8,924,417.32 F
ChildressWheelerFM 48WIDENING OF A NON-FREEWAY FACILITY07/08/15STP 1502(378)0489-01-020 $4,424,234.86 F
Corpus ChristiBeeFM 2441WIDEN ROADWAY07/08/15STP 1502(500)HES0738-05-013 $3,729,099.40 F
Corpus ChristiNuecesFM 70REPLACE BRIDGE AND APPROACHES07/08/15BR 1502(075)1558-03-028 $562,187.60 F
Corpus ChristiNuecesFM 70ADD PASSING LANES07/08/15STP 1502(442)HES1558-03-035 $2,728,784.50 F
Corpus ChristiRefugioUS 77WIDEN ROADWAY07/08/15STP 1502(434)HES0371-02-071 $1,939,611.09 F
Corpus ChristiSan PatricioSH 359ADD PASSING LANES07/08/15STP 1502(429)HES0087-03-030 $4,718,321.35 F
DallasDentonUS 377LANDSCAPE DEVELOPMENT07/08/15STP 1502(484)0081-04-040 $308,331.00W F
DallasEllisFM 66ADD LEFT TURN LANES07/08/15STP 2015(846)HES0596-02-042 $1,876,843.80 F
DallasNavarroIH 45WIDEN FROM 4 TO 6 LANES AND INSTALL ITS07/08/15NH 1502(485)0092-06-101 $69,563,289.42 F
El PasoEl PasoVAFY 2015 STRIPING PROJECT07/08/15C 924-00-810924-00-081 $2,011,805.03
El PasoEl PasoCSNEW LOCATION NON FREEWAY07/08/15CBI 2012(231)0924-06-311 $18,934,929.38 F
El PasoHudspethUS 62ADD PASSING LANES07/08/15STP 1502(370)HES0374-05-025 $3,914,688.58 F
Fort WorthParkerCSGR,DR,STR, PAVEMENT & STRIPING07/08/15STP 2015(679)0902-38-075 $6,051,991.93 F
Fort WorthTarrantSH 114LANDSCAPING07/08/15NH 2012(065)0353-03-095 $507,120.00 F
HoustonGalvestonSH 6BASE REPAIR, SEAL COAT AND 1.5 IN PFC ACP O/L07/08/15NH 1502(444)0192-04-104 $2,954,483.87 F
HoustonGalvestonCSMILLING 2" EXIST ASPHALT PAV & PLACING 2" SURFACE07/08/15STP 2014(594)MM0912-73-182 $2,207,224.75 F
HoustonGalvestonVA07/08/15C 912-73-2030912-73-203 $1,398,347.00
HoustonHarrisUS 90LANDSCAPE DEVELOPMENT07/08/15NH 1502(443)0028-02-091 $1,511,640.23 F
HoustonHarrisIH 610LANDSCAPE DEVELOPMENT07/08/15HP 1502(446)0271-14-232 $597,231.64 F
LaredoDuvalUS 59GRADE, MBGF,ACP_OVERLAY, PAV_MKS07/08/15NH 1502(452)0542-04-031 $7,268,554.33 F
LaredoLa SalleVAUPGRADE BRIDGE RAIL, MBGF & GUARDRAIL END TREAT.07/08/15BR 1502(453)0922-20-017 $2,329,071.83 F
LubbockLubbockVAPAVEMENT REPAIR07/08/15STP 1502(380)0905-00-086 $584,800.00 F
LufkinAngelinaVACONSTRUCT CURB RAMPS IN SAN AUGUSTINE AND SHELBY07/08/15STP 1502(258)0911-00-074 $950,536.40 F
LufkinHoustonSH 21RECONSTRUCT PAVEMENT AND ADD PASSING LANES07/08/15NH 1502(460)0117-07-040 $10,364,142.85 F
LufkinSabineFM 1PROVIDE ADDITIONAL PAVED SURFACE WIDTH07/08/15STP 1502(459)HES0064-11-014 $3,062,676.95 F
OdessaEctorVATRAFFIC SIGNAL07/08/15C 906-00-1690906-00-169 $2,999,999.41
OdessaMidlandFM 715C&G, SEALCOAT, PAVEMENT MARKING, ADD TURN LANE07/08/15STP 1502(407)HES1081-01-017 $137,834.10W F
OdessaPecosUS 67BRIDGE MAINTENANCE07/08/15BR 1502(404)0076-01-025 $387,744.10 F
OdessaUptonSH 349SUPER-2 HIGHWAY07/08/15STP 1502(405)0380-11-023 $11,113,367.26 F
ParisGraysonUS 82CONST MAIN LNS OF A 4-LN SECTION WITH DEPR MEDIAN07/08/15C 45-19-500045-19-050 $13,260,183.64
PharrCameronSH 100MILLING AND OVERLAYS07/08/15STP 1502(467)0331-01-041 $1,231,168.40 F
PharrHidalgoFM 1925WIDEN TO FOUR LANE DIVIDED, URBAN07/08/15C 1803-2-281803-02-028 $3,779,455.96
PharrStarrUS 83WIDEN BRIDGE CLASS CULVERT07/08/15STP 1502(463)HES0038-07-067 $918,107.89 F
San AntonioBexarIH 10GRADING, BASE, STRUCTURES, & PAVEMENT MARKINGS07/08/15C 72-7-660072-07-066 $28,402,259.16
WacoHillSH 22WIDEN FROM TWO LANE TO FOUR LANE W/ LEFT TURN LANE07/08/15STP 1502(482)0121-03-054 $5,237,089.11 F
YoakumMatagordaCRREPLACE BRIDGE AND APPROACHES07/08/15BR 2013(504)0913-21-045 $322,516.40W F