FARM TO MARKET ROAD NO. 1586
Minute Order 028110, dated 01/27/1950
From SH 29, approximately 10.0 miles northwest of Gonzales, west through Ottine to the San Marcos River Bridge, a distance of approximately 2.1 miles. (Gonzales County) New Designation
From US 183, approximately 10 miles northwest of Gonzales, westward through Ottine to the San Marcos River Bridge with a loop of approximately 0.3 mile at the Gonzales Warm Springs Foundation, a total distance of approximately 3.1 miles. (Gonzales County) Loop at Gonzales Warm Springs Foundation added.
From US 183 approximately 10 miles northwest of Gonzales, westward via Ottine approximately 2.8 miles to the San Marcos River Bridge. (Gonzales County) Loop connection of approximately 0.3 miles canceled.