Highway Designation File
Transportation Planning and Programming Division
Current Description-Effective Date-Authority
30.908 | 2010 |
FARM TO MARKET ROAD NO. 1696
Minute Order 030231, dated 05/23/1951
From SH 90 at Bedias to FM 39 at Cross, a distance of approximately 9.4 miles. (Grimes County) New Designation.
From FM 39 at Cross, eastward via Bedias, a distance of approximately 9.3 miles, with a spur connection of approximately 0.1 mile to SH 90 at Bedias, a total distance of approximately 9.4 miles. (Grimes County) Route extended approximately 0.3 mile northward and eastward at Bedias with approximately 0.1 mile of original designation used as spur connection to SH 90.
From FM at Cross, eastward via Bedias to US 75 at Crabbs Prairie, with a spur connection of approximately 0.1 mile to SH 90 at Bedias, a total distance of approximately 30.0 miles. (Grimes and Walker Counties) Extended approximately 6.3 miles eastward from Bedias to the Grimes/Walker County Line; FM 1902 canceled and combined, adding approximately 14.3 miles.
From FM 39 at Cross, eastward to SH 90 at Bedias; and from another point on SH 90 at Bedias, eastward to US 75 at Crabbs Prairie, a distance of approximately 29.4 miles. (Grimes and Walker Counties) Spur connection in Bedias transferred to main route and part of main route in Bedias removed from the designated system, a decrease of approximately 0.2 mile.
From FM 39 at Cross, eastward to SH 90 at Bedias; and from another point on SH 90 at Bedias, eastward via Crabbs Prairie to IH 45, a total distance of approximately 30.8 miles. (Grimes and Walker Counties) Extended northeastward approximately 1.3 miles.