In accordance with Texas Transportation Code, Section 201.810,
below please find a consolidated listing of reports produced by TxDOT in
compliance with various provisions of the Transportation Code. The list includes
statutory references, report titles and purposes, and the date of the latest
version. A wide variety of other TxDOT reports, plans, and publications is
available for review.
Transportation
Code Provision |
Title and Purpose |
Report
Date |
Format |
|
§51.007 |
Gulf Intracoastal Waterway Report
Evaluates impact of Gulf Intracoastal Waterway on state; may
include legislative recommendations.
|
2010 |
 |
|
§55.008 |
Port Capital Program
Describes goals and objectives of department’s Port Authority Advisory
Committee concerning development of port facilities and state’s
intermodal transportation system.
|
2010 |
 |
|
§201.107 |
Annual Financial Report
A complete and detailed written report accounting for all funds
received and disbursed by the department during the preceding fiscal
year.
|
2011 |
 |
|
§201.108 |
Department Audits
Annual and periodic audits conducted by the department's Audit
Division or contract auditors.
|
2011 |
 |
|
§201.114 |
Border Trade Advisory Committee Report
International trade and transportation planning; post-2010
reports to include maritime ports.
|
2010 |

|
|
§201.207 |
Cross Border Transportation and Infrastructure Report
Summary of information obtained in meetings between department staff and
their counterparts in the United Mexican States about issues relating to
truck inspections and transportation and associated infrastructure.
|
2006 |
 |
|
§201.402 |
Equal Employment Opportunity (EEO) Policy Statement
Ensures TxDOT adheres to EEO policies and procedures.
|
2011 |
 |
|
§201.601 |
Statewide Transportation Plan
The "Statewide Long-Range
Transportation Plan 2035" serves as the state's 24-year "blueprint" for
the planning process. Updated at least every four years, it guides
collaborative efforts between TxDOT, local and regional decision-makers,
and other transportation stakeholders.
|
2011 |
 |
|
§201.601(e) |
Annual SLRTP Progress Report
Annual analysis of department's progress in attaining long-term
goals in Statewide Long-Range Transportation Plan.
|
Pending |
|
|
§201.6011 |
International Trade Corridor Plan
Report on implementation of department’s international trade
corridor plan.
|
2010 |
|
|
§201.6013 |
State Rail Plan
Long-term plan
for statewide passenger rail system. Includes description of existing
and proposed passenger rail systems, status of systems under
construction, analysis of potential interconnectivity difficulties,
ridership projections for proposed projects, and statistics for existing
systems.
|
2010 |

|
|
§201.608 |
International Trade Traffic Projects
Report on ability of state highway system to handle projected
international trade traffic over next five years.
|
2010 |
 |
|
§201.616 |
Transportation Program Expenditures
Provides expenditure information on Unified Transportation Program
(UTP), turnpikes, bonds, Regional Mobility Authorities (RMAs), and
certain rail facilities.
|
2010 |
 |
|
§201.762 |
Environmental Review Process Reports
Documents implementation of streamlined environmental review
process, including status report for preceding 12-month period.
|
12/2011 |
 |
|
§201.805(a) |
DISCOS (Statistical Comparison of Districts)
Provides a broad range of transportation-related statistics calculated
on a per-capita basis for each of the state's 254 counties and 25 TxDOT
districts.
|
2010 |
 |
|
§201.805(c) |
Status of Texas Mobility Fund
Provides amount of money in
Texas
Mobility Fund by source and amount of money received by department
itemized by source of funds vs. appropriated funds.
|
2011 |
 |
|
§201.805(d) |
Outside Consultant List
List of TxDOT’s contracts with Public Relations firms.
|
2010 |
 |
|
§201.806(a)(2) |
Texas Motor Vehicle Crash Statistics
Statistical information about the number, cause and location of
crashes, including information about number of accidents involving
injury to, death of, or property damage to bicyclists or pedestrians. Provides electronic access to data.
|
2009 |

|
|
§201.806(a)(3) |
Crash Data Abstract
Abstract includes statistical information and relevant conclusions as
well as recommendations and findings to decrease crashes and improve
safety. (See also: “Texas Motor Vehicle Crash Statistics”)
|
2009-2010 |
 |
|
§201.807(b) |
Project Information Reporting System
Contains information about each department project, including: project
status; each source of funding; benchmarks for evaluating progress;
timelines for completion; list of department employees responsible for
project with contact information; and results of annual review.
|
2011 |
 |
|
§201.808 |
Expenditure Priorities Reporting System
Includes reports that evaluate effectiveness of TxDOT's expenditures
on transportation projects to achieve certain transportation goals.
|
Pending |
|
|
§201.809 |
Statewide Transportation Report
Includes information about progress toward each long-term
transportation goal identified in statewide transportation plan; status
of individual projects identified as major priorities; summary of number
of statewide project implementation benchmarks completed; and
information about accuracy of previous department financial forecasts.
|
2011 |
 |
|
§201.811 |
Public Involvement Policy
Policy targets different groups and individuals; encourages continuous
contact between TxDOT and outside persons throughout the transportation
decision-making process.
|
2011 |

|
|
§201.991 and 201.992 |
Unified Transportation Program and Annual Update
Unified Transportation Program covering a period of 10 years to
guide development of transportation projects and authorize their
construction. Identifies target funding levels and lists all projects
that the department intends to develop or begin construction of during
program period.
|
2012 |
 |
|
§201.993 |
Annual Funding and Cash Flow Forecast
Forecast of all funds TxDOT expects to receive, including funds from
this state and the federal government used to guide planning for the
Unified Transportation Program.
|
2011 |

|
|
§201.998 |
Department Work Program
Consistently-formatted work program for each of TxDOT's 25 districts
based on Unified Transportation Program. Covers four-year period and
contains all projects that the district proposes to implement during
that period. Includes progress report on major transportation projects
and other district projects.
|
Pending |
|
|
§222.053(e) |
Economically Disadvantaged County Program
Report on program that enables the Texas Transportation
Commission to adjust the minimum local matching funds requirement for
certain transportation projects after evaluating the local government's
effort and ability to meet the requirement.
|
2011 |
 |
|
§223.042(f) |
Highway Maintenance Contracting
Details of TxDOT’s highway maintenance privatization contracts
awarded during previous fiscal year.
|
08/2011 |
 |
|
§455.001 (4) |
Comprehensive Master Plan for Public Transportation
(The department currently helps local public transportation agencies
develop public transportation plans on a regional basis. Currently,
copies of the various regional plans are not posted on the TxDOT website
but are available at the accompanying link to the Regional Service
Planning website.)
|
2006 |
 |
|
§456.008 |
Texas Transit Statistics
Report on performance of public transportation
providers receiving any state or federal funding.
|
2009 |
|
|
§707.004 |
Red Light Cameras - Annual Data Reports
Annual compilation of reports from local authorities that
operate camera systems. Includes number and type of traffic accidents at
camera-monitored intersections.
|
2010 |
 |