| 1995 Standard Specifications Book Last Update (05/03/2002) Click here to return to Index Page DIVISION II - SUBBASE AND BASE COURSES Table Of Contents ITEM NO.	TITLE AND REQUIREMENTS 204 -	SPRINKLING SPECIFICATION REQUIREMENTS1) The rate of application can be shown on the plans or as directed by the Engineer.
 2) Specify on plans if it is a pay Item.
 OPTIONAL REQUIREMENTSNone
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Sprinkling (Base)" | KL |  
    | 2) | "Sprinkling (Earthwork)" | KL |  
    | 3) | "Sprinkling (Dust Control)" | KL |  REFERENCE ITEMSNone
 Go to Top 210 -	ROLLING (FLAT WHEEL) SPECIFICATION REQUIREMENTS1) Specify on the plans if it is a pay Item.
 OPTIONAL REQUIREMENTSNone
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Rolling (Flat Wheel)" | H |  REFERENCE ITEMSNone
 Go to Top 211 -	ROLLING (TAMPING) SPECIFICATION REQUIREMENTS1) Specify on the plans if it is a pay Item.
 OPTIONAL REQUIREMENTSNone
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Rolling (Tamping)" | H |  REFERENCE ITEMS(212)
 Go to Top 212 -	ROLLING (HEAVY TAMPING) SPECIFICATION REQUIREMENTS1) Specify on the plans if it is a pay Item.
 OPTIONAL REQUIREMENTSNone
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Rolling (Heavy Tamping)" | H |  REFERENCE ITEMSNone
 Go to Top 213 -	ROLLING (PNEUMATIC TIRE) SPECIFICATION REQUIREMENTS1) Specify type of pneumatic tire roller to be used on the plans.
 2) Specify on the plans if it is a pay Item.
 OPTIONAL REQUIREMENTSNone
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Rolling (Light Pneumatic Tire)" | H |  
    | 2) | "Rolling (Medium Pneumatic Tire) (Type A)" | H |  
    | 3) | "Rolling (Medium Pneumatic Tire) (Type B)" | H |  REFERENCE ITEMSNone
 Go to Top 214 -	ROLLING (HEAVY PNEUMATIC TIRE) SPECIFICATION REQUIREMENTS1) Specify on the plans if it is a pay Item.
 OPTIONAL REQUIREMENTSNone
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Rolling (Heavy Pneumatic Tire)" | H |  REFERENCE ITEMSNone
 Go to Top 215 -	ROLLING (GRID) SPECIFICATION REQUIREMENTS1) Specify on the plans if it is a pay Item.
 OPTIONAL REQUIREMENTSNone
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Rolling (Grid)" | H |  REFERENCE ITEMSNone
 Go to Top 216 -	ROLLING (PROOF) SPECIFICATION REQUIREMENTSNone
 OPTIONAL REQUIREMENTSNone
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Rolling (Proof)" | H |  REFERENCE ITEMSNone
 Go to Top 217 -	ROLLING (VIBRATORY) SPECIFICATION REQUIREMENTS1) Specify type of roller to be used on the plans.
 2) For Type C roller, the static mass, vibratory drum width and drum surface configuration must
 be shown on the plans.
 3) Specify on the plans if it is a pay Item.
 OPTIONAL REQUIREMENTSNone
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Rolling (Vibratory) (Type Specified)" | H |  REFERENCE ITEMSNone
 Go to Top 247 -	FLEXIBLE BASE SPECIFICATION REQUIREMENTS1) Limits must be shown on the plans.
 2) Width, depth and number of courses must be shown on the typical section(s).
 3) Must specify type and grade of flexible base on the plans.
 4) Type D material requirements must be shown on the plans.
 5) Grade 6 requirements must be shown on the plans.
 6) Show the measurement Class on the plans.
 7) Measurement Class 4 and 5 are plans quantity measurement Items.
 8) Must specify the depth for measurement Class 5.
 OPTIONAL REQUIREMENTS1) When measurement Class 2 is required, it will be paid for in accordance with Item 520.
 2) When proof rolling is required, it will be paid for in accordance with Item 216.
 3) When lightweight aggregates are used, the wet ball mill requirements will not apply and the lightweight
 aggregate shall meet the Los Angeles Abrasion, Pressure Slaking and Freeze Thaw requirements of Item
 303, "Aggregate for Surface Treatment (Lightweight)".
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Flexible Base (Complete in Place) (Type Specified) | M3 (Class 1, 3 or 4), |  
    |  | (Grade Specified) (Measurement Class Specified) | MGR (Class 2), |  
    |  | (Depth Specified for Measurement Class 5)" | M2 (Class 5) |  
    |  |  |  |  
    | 2) | "Flexible Base (Roadway Delivery) (Type Specified) | M3 (Class 1), |  
    |  | (Grade Specified) (Measurement Class Specified)" | MGR (Class 2) |  
    |  |  |  |  
    | 3) | "Flexible Base (Stockpile Delivery) (Type Specified) | M3 (Class 1, 3), |  
    |  | (Grade Specified) (Measurement Class Specified)" | MGR (Class 2) |  REFERENCE ITEMS(204)
 Go to Top 251 -	REWORKING BASE MATERIAL SPECIFICATION REQUIREMENTS1) Limits must be shown on the plans.
 2) Width and depth must be shown on the typical section(s).
 3) Specify type of work for reworking base material on the plans.
 4) The type and grade of the new flexible base must be shown on the plans.  Furnishing and delivery of new
 base will be paid for as "Flexible Base (Roadway Delivery)" in accordance with subarticle 247.5.
 5) Show type of compaction on the plans.
 6) Measurement Class 2 and 5 are plans quantity measurement Items.
 OPTIONAL REQUIREMENTS1) When measurement Class 6 is required, it will be paid for in accordance with Item 520.
 2) When proof rolling is required, it will be paid for in accordance with Item 216.
 3) When new base is required, it shall be in accordance with Item 247.
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Reworking Base Material (Type A) (Class 1 or 2) | KM (Class 1), |  
    |  | (Scarified Depth) (Compaction Method)" | M2 (Class 2) |  
    |  |  |  |  
    | 2) | "Reworking Base Material (Type B) (Class 1, 2 or 5) | KM (Class 1), |  
    |  | (Scarified Depth) (Compaction Method)" | M2 (Class 2), |  
    |  |  | M3 (Class 5) |  
    |  |  |  |  
    | 3) | "Reworking Base Material (Type C) (Class Specified) | KM (Class 1), |  
    |  | (Scarified Depth) (Compaction Method)" | M2 (Class 2), |  
    |  |  | M3 (Class 3, 4, 5) |  
    |  |  | MGR (Class 6) |  
    |  |  |  |  
    | 4) | "Reworking Base Material (Type D) (Class 1, 2 or 5) | KM (Class 1), |  
    |  | (Scarified Depth) (Compaction Method)" | M2 (Class 2), |  
    |  |  | M3 (Class 5) |  REFERENCE ITEMS(204)
 Go to Top
 260 -	LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED) SPECIFICATION REQUIREMENTS1) Limits must be shown on the plans.
 2) Width, depth and number of courses must be shown on the typical section(s).
 3) Specify the type or types of lime to be used on the plans.
 4) The percentage by mass or kilograms per square meter of lime to be added must be shown on the plans.
 5) Type of compaction must be specified on the plans.
 6) The completed section will be moist cured or prevented from drying by the addition of an
 asphalt material.  This material will be of the type shown on the plans.
 OPTIONAL REQUIREMENTS1) When proof rolling is required, it will be paid for in accordance with Item
216.
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Lime (Type Specified)" | MGR |  
    | 2) | "Lime Treated Subgrade (Ordinary Compaction) (Depth
    Specified)" | M2 |  
    | 3) | "Lime Treated Subgrade (Density Control) (Depth Specified)" | M3 |  REFERENCE ITEMS(132, 204, 264, 300, 520)
 Go to Top 262 -	LIME TREATMENT FOR BASE COURSES (ROAD MIXED) SPECIFICATION REQUIREMENTS1) Limits must be shown on the plans.
 2) Width, depth and number of courses must be shown on the plans.
 3) Specify the type or types of lime to be used on the plans.
 4) The percentage by mass or kilograms per square meter of lime to be added must
 be shown on the plans.
 5) Type of compaction must be specified on the plans.
 6) The type and grade of the new flexible base must be shown on the plans.  Furnishing and delivery
 of new base will be paid for as "Flexible Base (Roadway Delivery)" in accordance with
 subarticle 247.5.
 7) The completed section will be moist cured or prevented from drying by the addition of an
 asphalt material.  This material will be of the type shown on the plans.
 OPTIONAL REQUIREMENTS1) When proof rolling is required, it will be paid for in accordance with Item
216.
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Lime (Type Specified)" | MGR |  
    | 2) | "Lime Treatment for Base Courses (Existing Base) |  |  
    |  | (Compaction Method) (Depth Specified)" | M2 |  
    | 3) | "Lime Treatment for Base Courses (New Base) (Compaction Method) |  |  
    |  | (Depth Specified)" | M2 |  
    | 4) | "Lime Treatment for Base Courses (New and Existing Base) |  |  
    |  | (Compaction Method) (Depth Specified)" | M2 |  REFERENCE ITEMS(204, 247, 260, 264, 300, 520)
 Go to Top 263 -	LIME TREATED BASE (PLANT MIXED) SPECIFICATION REQUIREMENTS1) Limits must be shown on the plans.
 2) Width, depth and number of courses must be shown on the typical section(s).
 3) The percentage by mass of lime to be added must be shown on the plans.
 4) The type and grade of the new flexible base must be shown on the plans.
 5) The completed section will be moist cured or prevented from drying by the addition of an
 asphalt material.  This material will be of the type shown on the plans.
 6) This is a plans quantity measurement Item when the lime treated base is measured by the square
 meter of completed work or by the cubic meter in its completed and accepted final position.
 OPTIONAL REQUIREMENTSNone
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Lime Treated Base (Plant Mix) (Density Control) |  |  
    |  | (Depth Specified)" | MGR, M2, M3 |  REFERENCE ITEMS(204, 247, 264, 300, 340, 520)
 Go to Top 264 -	LIME AND LIME SLURRY SPECIFICATION REQUIREMENTSNone
 OPTIONAL REQUIREMENTSNone
 PAYMENT AND MEASUREMENTLime will be measured and paid for in accordance with the governing specifications for the
 items of construction in which lime is used.
 REFERENCE ITEMSNone
 Go to Top 265 -	LIME-FLY ASH (LFA) TREATMENT FOR MATERIALS USED AS SUBGRADE SPECIFICATION REQUIREMENTS1) Limits must be shown on the plans.
 2) Width, depth and number of courses must be shown on the typical section(s).
 3) Specify the type or types of lime to be used on the plans.
 4) The percentages by mass or kilograms per square meter of lime and fly ash to be added must be
 shown on the plans.
 5) Type of compaction must be specified on the plans.
 6) The completed section will be moist cured or prevented from drying by the addition of an asphalt
 material.  This material will be of the type shown on the plans.
 OPTIONAL REQUIREMENTS1) When proof rolling is required, it will be paid for in accordance with Item 216.
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Lime (Type Specified)" | MGR |  
    | 2) | "Fly Ash" | MGR |  
    | 3) | "LFA Treated Subgrade (Compaction Method) (Depth Specified)" | M2 |  REFERENCE ITEMS(132, 204, 264, 300, 520)
 Go to Top 266 -	LIME-FLY ASH (LFA) TREATMENT FOR BASE COURSES (ROAD MIXED) SPECIFICATION REQUIREMENTS1) Limits must be shown on the plans.
 2) Width, depth and number of courses must be shown on the typical section(s).
 3) Specify the type or types of lime to be used on the plans.
 4) The percentages by mass or kilograms per square meter of lime and fly ash to be added must be
 shown on the plans.
 5) Type of compaction must be specified on the plans.
 6) The type and grade of the new flexible base must be shown on the plans.  Furnishing and delivery of
 new base will be paid for as "Flexible Base (Roadway Delivery)" in accordance with subarticle 247.5.
 7) The completed section will be moist cured or prevented from drying by the addition of an asphalt
 material.  This material will be of the type shown on the plans.
 OPTIONAL REQUIREMENTS1) When proof rolling is required, it will be paid for in accordance with Item 216.
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Lime (Type Specified)" | MGR |  
    | 2) | "Fly Ash" | MGR |  
    | 3) | "LFA Treatment for Base Courses (Existing Base) |  |  
    |  | (Compaction Method) (Depth Specified)" | M2 |  
    | 4) | "LFA Treatment for Base Courses (New Base) (Compaction Method) |  |  
    |  | (Depth Specified)" | M2 |  
    | 5) | "LFA Treatment for Base Courses (New and Existing Base) |  |  
    |  | (Compaction Method) (Depth Specified)" | M2 |  REFERENCE ITEMS(204, 247, 264, 265, 300)
 Go to Top 275 -	PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) SPECIFICATION REQUIREMENTS1) Limits must be shown on the plans.
 2) Width and depth of courses must be shown on the typical section(s).
 3) The strength must be shown on the plans.
 4) When Strength N is specified, must show the minimum design compressive strength on the plans.
 5) When Strength O is specified, must show the allowable cement content percentage on the plans.
 6) Type of compaction must be specified on the plans.
 7) The type and grade of the new flexible base must be shown on the plans.  Furnishing and delivery of
 new base will be paid for as "Flexible Base (Roadway Delivery)" in accordance with subarticle 247.5.
 8) The completed section will be moist cured or prevented from drying by the addition of an asphalt
 material.  This material will be of the type shown on the plans.
 OPTIONAL REQUIREMENTS1) When proof rolling is required, it will be paid for in accordance with Item 216.
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Cement Treatment (Existing Material) (Strength Specified) |  |  
    |  | (Depth Specified) (Compaction Method)" | M2 |  
    | 2) | "Cement Treatment (New Base) (Strength Specified) (Depth Specified) |  |  
    |  | (Compaction Method)" | M2 |  
    | 3) | "Cement Treatment (Mixing Existing Material and New Base) |  |  
    |  | (Strength Specified) (Depth Specified) (Compaction Method)" | M2 |  
    | 4) | "Cement" | MGR |  REFERENCE ITEMS(247, 300, 421, 520, 524)
 Go to Top 276 -	PORTLAND CEMENT TREATED BASE (PLANT MIXED) SPECIFICATION REQUIREMENTS1) Limits must be shown on the plans.
 2) Width and depth of courses must be shown on the typical section(s).
 3) The strength must be shown on the plans.
 4) When Strength N is specified, must show the minimum design compressive strength on the plans.
 5) When Strength O is specified, must show the allowable cement content percentage on the plans.
 6) The type and grade of the new flexible base must be shown on the plans.  Furnishing and delivery of
 new base will be paid for as "Flexible Base (Roadway Delivery)" in accordance with subarticle 247.5.
 7) The completed section will be moist cured or prevented from drying by the addition of an asphalt
 material.  This material will be of the type shown on the plans.
 8) Measurement Class 4 and 5 are plans quantity measurement Items.
 OPTIONAL REQUIREMENTS1) When proof rolling is required, it will be paid for in accordance with Item 216.
 
  
    |  | PAYMENT DESCRIPTION | UNITS |  
    | 1) | "Cement Treated Base (Strength Specified) |  |  
    |  | (Flexible Base Type and Grade Specified)" | M3 (Class 1) |  
    | 2) | "Cement Treated Base (Strength Specified) |  |  
    |  | (Flexible Base Type and Grade Specified)" | MGR (Class 2) |  
    |  |  |  |  
    | 3a) | "Flexible Base (Strength Specified) | MGR (Class 3) |  
    |  | (Flexible Base Type and Grade Specified)" |  |  
    | b) | "Cement" | MGR (Class 3) |  
    | 4a) | "Flexible Base (Strength Specified) (Flexible Base Type and |  |  
    |  | Grade Specified) (Depth Specified)" | M2 (Class 4) |  
    | b) | "Cement" | MGR (Class 4) |  
    | 5) | "Cement Treated Base (Strength Specified) |  |  
    |  | (Flexible Base Type and Grade Specified) (Depth Specified)" | M2 (Class 5) |  REFERENCE ITEMS(247, 300, 340, 421, 520, 524)