Search Results
2014 | |||
Special Provisions | |||
SP342-003 | RTF | PERMEABLE FRICTION COURSE (PFC) - VOID - DO NOT USE. Minor changes to clarify the intent of the specification. In addition, removed the lime requirement for AR mixtures (this was not in the original specification). Required for all projects using permeable friction course beginning with the September 2018 letting. Replaced by SP342-004 . Statewide Use. | |
Search |
Specification Information |