SS7096  PDF  RTF  Stormwater Pump Station Upgrades - For project 0017-10-294 in Bexar County. Construct upgrades to an existing stormwater pump station (PS) as shown on the plans for five pump stations located along Interstate Highway (IH) 35 and State Spur (SS) 371. One-Time Use.
SS7095  PDF  RTF  SANITARY SEWER - For project 0266-13-016 in Wharton County. Comply with the latest provisions of Buy America pertaining to steel and iron in accordance with 23 CFR 635.410. One-Time Use.
SS7094  PDF  RTF  CHASE UTILITY CONNECTIONS - For project 0196-07-034 in Dallas County. Furnish and install utility connections in enclosed chases One-Time Use.
SS7093  PDF  RTF  Sanitary Sewer - For project 0902-90-129 in Tarrant County. This Specification governs for all materials and work necessary for the installation of all sanitary sewer mains, fittings, connections, service lines, and other appurtenances necessary for a complete and operating system. One-Time Use.
SS7091  PDF  RTF  DRY DOCKING 20-CAR FERRYBOAT - For project 6481-62-001 in Nueces County. Dry-docking, cleaning, painting, and repair work on ferryboats. One-Time Use.
SS7090  PDF  RTF  MOBILE FUEL CELL FUEL TRANSFER SYSTEM - For project 2263-02-107 in Nueces County. Furnish and install a new fuel transfer system on the existing trailer mounted mobile diesel fuel cell at the Port Aransas Ferry. One-Time Use.
SS7089  PDF  RTF  Ferry Electrical System Rehabilitation - For project 2263-02-107 in Nueces County. Complete a rehabilitation of the electrical/instrumentation/control (EIC) system at the Port Aransas Harbor Island Ferry Facility. This project requires the installation of a new electrical service to the overall facility. One-Time Use.
SS7088  PDF  RTF  HYDRAULIC POWER SYSTEMS (HPU) - For project 2263-02-107 in Nueces County. Construct one new Hydraulic Power Unit System located as shown on the plans as part of the improvements to Port Aransas Ferry. One-Time Use.
SS7087  PDF  RTF  WATER MAINS AND SERVICE LINES - For project 0366-02-089 in Guadalupe County. Provide and install a complete water main system in accordance with the plans and specifications and in compliance with the Department's Utility Accommodation Policy (UAP) (Title 43, T.A.C., Sections 21.31- 21.55). One-Time Use.
SS7086  PDF  RTF  DRY DOCKING 28-CAR FERRYBOAT - For project 6481-61-001 in Nueces County. Provide dry docking, cleaning, painting, and repair work on 28-car ferryboats One-Time Use.
SS7085  PDF  RTF  HIGH PRESSURE WATER BLASTING SYSTEM 6 - For project 0017-10-292 in Bexar County. Furnish a high-pressure waterblasting system for removing paint, thermoplastic, epoxy. One-Time Use.
SS7084  PDF  RTF  Sanitary Sewers - For project 0366-02-089 in Guadalupe County. Comply with the latest provisions of Buy America pertaining to steel and iron. One-Time Use.
SS7083  PDF  RTF  Water Mains and Sanitary Sewers - For project 1201-02-026 in Williamson County. This Special Specification governs for all materials, equipment, and labor necessary for the installation of all water mains, sanitary sewer lines, and service lines. One-Time Use.
SS7082  PDF  RTF  Installation of Utility Lines and Fire Hydrants - For project 0196-07-034 in Dallas County. Furnish, install, or replace water pipe, water valves, water meters and boxes, fire hydrant assemblies, pipe fittings, steel encasement under pavement, bypass pumping for sewer tie-in, pavement repair, and supporting materials. One-Time Use. Special Provisions exist.
SS7081  PDF  RTF  Slip Lining Pipe or Box Culverts - Rehabilitate existing pipe or box culverts by slip-lining with new pipe. Grout any voids between the host and insert pipe. Pipe diameters and shapes will be shown on the plans. Required for all projects using Slip Lining Pipe or Box Culverts beginning with the May 2026 letting. However, use of this Special Specification prior to the May 2026 letting is at the district's option. Statewide Use.
SS7080  PDF  RTF  NATURAL GAS PIPELINE - For project 1122-04-017 in Wilson County. This document will control the scope relating to abandoned gas pipeline which must be removed to allow for the construction of FM 1344 in Wilson County One-Time Use.
SS7079  PDF  RTF  Bypass Pumping - For project 0015-13-437 in Travis County. Consists of bypass pumping operations when temporarily rerouting sanitary sewer flows and to prevent sanitary sewage overflows (SSO) and maintain continuous adequate and reliable sewer flow during construction... One-Time Use.
SS7078  PDF  RTF  Water Mains and Service Lines - For project 1209-01-030 in San Patricio County. Provide and install a complete water main system in conformance with the plans and specifications and in compliance with the Department's Utility Accommodation Policy (UAP) (Title 43, T.A.C., Sections 21.31-21.55). One-Time Use.
SS7077  PDF  RTF  Sanitary Sewer - For project 1209-01-030 in San Patricio County. This Specification will govern for all materials and work necessary for the installation of all sanitary sewer mains, fittings, connections, service lines, and other appurtenances necessary for a complete and operating system. One-Time Use.
SS7076  PDF  RTF  Installation of Water Lines - For project 0495-07-074 in Gregg County. Furnish, install, or replace water pipe, water valves, pipe fittings, steel encasement under pavement, pavement repair, and supporting materials in conformance with NCTCOG and details shown on the plans. One-Time Use.
SS7075  PDF  RTF  BUTTERFLY VALVE VAULT AND BLOW OFF VALVE MODIFICATIONS - For project 0081-03-047 in Denton County. Remove Butterfly Valve Vault. Remove existing concrete butterfly valve vault top slab and install reinforced concrete pipe (RCP) riser pipe and concrete top slab as shown on plans. Remove Blow-Off Valve Pad. One-Time Use.
SS7074  PDF  RTF  Slip Lining Pipe or Box Culverts - For project 6486-31-001 in Collin County. Rehabilitate existing pipe or box culverts by slip lining with new pipe. Grout any voids between the host and insert pipe. Pipe diameters and shapes will be shown on the plans. One-Time Use.
SS7073  PDF  RTF  Stormwater Treatment Unit - Membrane Filter - For project 2230-01-020 in Bexar County. Furnish and install the stormwater treatment system, complete and operable as shown and as specified herein, in conformance with the requirements of the plans and Contract documents. One-Time Use.
SS7072  PDF  RTF  STEEL SPLIT CASING - For project 0081-03-047 in Denton County. Install 66-in. steel split casing pipe as shown on plans. One-Time Use.
SS7071  PDF  RTF  Safety Rest Area Maintenance, Repair, and Operation - For project 6486-46-001 in Andrews, Callahan, Collingsworth, Crosby, Donley, Eastland, Gray, Hale, Hardeman, Haskell, Howard, Knox, Mitchell, Nolan, Pecos, Ward, Wichita, Wise Counties. Maintain, repair, and operate (MRO) the safety rest area (SRA) within boundaries as shown on the plans, including all existing appurtenances, any electrical, water, and wastewater line serving the rest area... One-Time Use.
SS7070  PDF  RTF  Public Boat Ramp - For project 2523-02-074 in Brazoria County. Furnish materials, equipment, and labor necessary to remove the existing public boat ramp, infill the existing boat ramp basin, and construct a dual-launch public boat ramp and dual-berthing slip at Farm to Market Road 2004 at Chocolate Bayou. One-Time Use.
SS7069  PDF  RTF  Sanitary Sewers - For project 0904-02-051 in Potter County. Furnish labor, materials, and equipment to provide a complete sanitary sewer system in accordance and compliance with ANSI, AWWA, ASTM, ASA, SSPC, ACI, and NSF standards; the plans and Specifications; and the Department's Utility Accommodation Policy. One-Time Use.
SS7068  PDF  RTF  Temporary Water Mains - 12, 16, 24, and 30 in.  - For project 2230-01-020 in Bexar County. This Item consists of the installation of 12, 16, 24, and 30 in. temporary water mains, including fittings, tie-ins, service connections, and all appurtenances to provide a temporary water main in accordance with these Specifications. One-Time Use.
SS7067  PDF  RTF  Fire Department Connections - For project 0196-07-034 in Dallas County. Furnish and install fire department connections. One-Time Use.
SS7066  PDF  RTF  Installation of Water Lines and Fire Hydrants - For project 0196-07-034 in Dallas County. Furnish, install, or replace water pipe, water valves, water meters and boxes, fire hydrant assemblies, pipe fittings, steel encasement under pavement, pavement repair, and supporting materials. One-Time Use.
SS7065  PDF  RTF  Natural Gas Pipeline - For project 2230-01-020 in Bexar County. Obtain all natural gas pipeline materials from a designated Grey Forest Utilities Center, transporting and unloading utilities furnished materials at the project site. One-Time Use.
SS7064  PDF  RTF  Welded Steel Casing Pipe (Open Cut) - Furnish and install welded steel casing pipe. The pipe must be the sizes, types, and dimensions shown on the plans and must include all appurtenances as required to complete the work. Districtwide Use. Pharr District.
SS7063  PDF  RTF  Water Mains and Sanitary Sewers - For project 0323-01-028 in Bastrop County. This Item will govern for all materials, equipment, and labor necessary for the installation of all water mains, sanitary sewer lines, sanitary sewer force mains, services, and all distribution lines connected to the various structures. One-Time Use.
SS7062  PDF  RTF  FM 157 Water and Sanitary Sewer Relocations - For project 0747-05-042 in Johnson County. Furnish materials, labor, and equipment necessary to install the water system and sanitary sewer system in conformance with the City of Venus (City) requirements and details shown on the plans. One-Time Use.
SS7061  PDF  RTF  Overhead and Underground Electric Distribution - For project 0323-01-028 in Bastrop County. The Specifications and drawings pertinent to this document were taken from Austin Energy requirements pursuant to the specifications and standards for the construction. One-Time Use.
SS7060  PDF  RTF  Janitorial Maintenance - Provide janitorial services by type and at frequency shown on the plans. Also approved for the following CSJs 6481-75-001, 6481-86-001, and 6485-55-001. Districtwide Use. Yoakum District.
SS7059  PDF  RTF  Water and Sanitary Sewer Systems - For project 0924-06-655 in El Paso County. This Item will govern for furnishing new materials and installing water and sanitary sewer systems shown on the plans. One-Time Use.
SS7058  PDF  RTF  Ferryboat Coating System - For project 6481-60-001, 6481-61-001, 6481-62-001 in Nueces County. Renew ferryboat coating system while ferryboats are in dry-dock. One-Time Use.
SS7057  PDF  RTF  Live Stakes - For project 0094-08-008 in Tarrant County. Furnish and install live stakes at locations designated on the plans. One-Time Use.
SS7056  PDF  RTF  Canopy Structure - For project 0367-06-065, 6476-75-001 in Galveston County. Furnish labor, materials, and equipment to install steel canopy structures in accordance with these Specifications and details and locations shown on plans. Canopy structure must consist of metal roof supported by steel tube beam-column frames. One-Time Use.
SS7055  PDF  RTF  DRY DOCKING 28 CAR DIESEL ELECTRIC FERRYBOATS - For project 6481-60-001 in Nueces County. Provide dry docking, cleaning, painting, and repair work on 28-car diesel electric ferryboats. One-Time Use.
SS7054  PDF  RTF  Safety Rest Area - For project 6481-05-001 in Culberson County. Furnish all materials, equipment, and labor allowances necessary for repair and upgrade of safety rest area buildings, picnic arbors, benches, walkways, site furnishings and water, wastewater, and power systems. One-Time Use.
SS7053  PDF  RTF  Mobilization of Marine Operations and System Repair - For project 6476-75-001 in Galveston County. Establish and remove offices, plants, and facilities. Move personnel, equipment, and supplies to and from the project or the vicinity of the project site to begin work or complete work on Contract items. One-Time Use.
SS7052  PDF  RTF  Ferry Landing and Facilities Upgrade - For project 0367-06-065, 6476-75-001 in Galveston County. Furnish materials, equipment, labor allowances, and other necessary items for the upgrade of ferry landing and facilities as shown in the attached plan set and specifications. One-Time Use.
SS7051  PDF  RTF  Relocation of Marine Repair Equipment - For project 6476-75-001 in Galveston County. Relocate marine repair equipment to conduct maintenance or repairs, as directed. Each independent landing, cluster, ferry operations landing, or work dock will be considered a separate work area. One-Time Use.
SS7050  PDF  RTF  Ferry Landing Maintenance - For project 6476-75-001 in Galveston County. Furnish all materials, equipment, labor allowances, and other necessary items for the maintenance of ferry landing as shown in the plan set and attached specifications. One-Time Use.
SS7049  PDF  RTF  REPLACEMENT OF WATER AND SEWER LINES - For project 6463-86-001 in Kaufman County. Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies, pipe fittings, encasement pipes for water lines, adjust wastewater manhole, and supporting materials One-Time Use.
SS7048  PDF  RTF  Natural Gas Pipeline - For project 0017-10-292, 0017-10-294, 0024-07-059, 2230-01-020, 2452-03-128 in Baylor, Bexar Counties. Obtain all natural gas pipeline materials from a designated CPS Energy Center, transporting and unloading the CPS Energy furnished materials at the project site; and for furnishing all other materials, tools, supplies, labor, and equipment necessary. One-Time Use.
SS7047  PDF  RTF  SANITARY SEWER CLEANOUT ADJUSTMENT - For project 0902-90-294 in Tarrant County. Furnish materials, labor, and equipment necessary to relocate fire hydrants in accordance with the City of Fort Worth (City) requirements and 33 31 50 D214-Sanitary Sewer Service detail, as shown on the plans. One-Time Use.
SS7046  PDF  RTF  Flanged-End Flat Bottom Check Valve - For project 0017-10-292 in Bexar County. Design, fabricate, test, and install a flanged-end flat bottom check valve. One-Time Use.
SS7045  PDF  RTF  Water Mains - For project 0913-09-132 in Wharton County. Furnish labor, materials, and equipment necessary to provide a complete water main system in accordance with the plans and Specifications, and in accordance with the Department's Utility Accommodations Policy (43 TAC Section 21.31-21.55). One-Time Use.
SS7044  PDF  RTF  Water Mains and Service Lines - For project 0142-04-052 in Kerr County. Provide and install complete water main system in accordance with Department's Utility Accommodation Policy, including all pipe, joints and connections to new and existing pipes, valves, fittings, fire hydrants, pipe joint restraint systems, and blocking. One-Time Use.
SS7043  PDF  RTF  Marine Mobilization - For project 6478-93-001 in Brazoria, Fort Bend, Galveston, Harris, Montgomery, Waller Counties. Move personnel, equipment, and supplies to and from the project or the vicinity of the project site to begin work or complete work on Contract Items. One-Time Use.
SS7042  PDF  RTF  Building and Infrastructure at Presidio Rail Crossing - For project 7124-01-008 in Presidio County. Construct the ''Building and Infrastructure at Presidio Rail Crossing,'' in Presidio, Texas, as shown on the plans, specifications, and construction documents project manual. One-Time Use.
SS7041  PDF  RTF  Sanitary Sewer - For project 0024-07-059, 0024-07-068, 0073-02-092, 0521-04-293, 2230-01-020 in Bexar County. Provide and install complete sanitary sewer construction and adjustments in compliance with the Department's Utility Accommodation Policy (UAP) (Title 43, T.A.C., Sections 21.31-21.55) or as directed. One-Time Use.
SS7040  PDF  RTF  Water Mains and Service Lines - For project 0017-10-292, 0017-10-294, 0024-07-059, 0024-07-068, 0073-02-092, 0521-04-293, 2230-01-020, 2452-03-128 in Bexar County. Provide and install a complete system of water mains that include all pipe, all joints and connections to new and existing pipes, all valves, fittings, fire hydrants, pipe joint restraint systems, blocking, and other items. One-Time Use. Special Provisions exist.
SS7039  PDF  RTF  Temporary Emergency Generator - For project 6475-52-001, 6475-53-001, 6475-54-001, 6476-73-001, 6478-30-001, 6485-04-001 in Brazoria, Fort Bend, Galveston, Harris, Montgomery, Waller Counties. The work in this Specification consists of transporting the Department furnished temporary emergency generator from the designated location to the jobsite specified on the plans. One-Time Use. Special Provisions exist.
SS7038  PDF  RTF  Automated Barricade Gate System - For project 0196-02-126 in Denton County. Furnish, install, relocate, and remove automated barricade gates (ABG), access control system (ACS) node cabinets, communication hardware, and standard control interfaces in designated field locations. One-Time Use.
SS7037  PDF  RTF  ACCESS CONTROL SYSTEM SOFTWARE AND FIRMWARE - For project 0196-02-126 in Denton County. This Item governs for the furnishing and installation of Access Control System (ACS) Software and Firmware. One-Time Use.
SS7036  PDF  RTF  Maintenance Computer-Controlled Cartridge Filter System - For project 6477-32-001 in Comal County. Furnish maintenance services on computer-controlled cartridge filter systems and associated appurtenances that function as a stormwater treatment system as shown on the plans. One-Time Use.
SS7035  PDF  RTF  Snow and Ice Control - For project 6477-31-001, 6477-32-001, 6483-02-001, 6496-09-001 in Bexar, Comal, Guadalupe, Harris Counties. Treat bridges and roadways at designated locations with anti-icing and de-icing materials as directed. One-Time Use.
SS7034  PDF  RTF  MISCELLANEOUS STATE USE WORK - For project 6477-37-001 in Trinity County. This number is for State Use projects only as administered by Maintenance to obtain bid codes. One-Time Use.
SS7033  PDF  RTF  Water Mains and Service Lines - For project 0342-04-036 in Cameron County. Provide and install a complete water main system as shown on the plans and Specifications and in accordance with the Department's Utility Accommodation Policy. One-Time Use.
SS7032  PDF  RTF  Prepackaged Concrete (Materials Only) - For project 0909-00-074, 6475-63-001 in Garza, McLennan Counties. Furnish bagged concrete materials typically used for foundations for mailboxes and sign posts. One-Time Use.
SS7031  PDF  RTF  Batch Detention System - For project 0151-05-123 in Williamson County. Convert an existing sedimentation basin into a batch detention pond including all electrical equipment, liner system, and miscellaneous concrete structures as shown on the plans and in accordance with this Item. One-Time Use.
SS7030  PDF  RTF  Water and Wastewater Main Relocations - For project 0017-10-292, 0196-03-263 in Bexar, Dallas Counties. Furnish and install all materials, equipment, and labor listed in the ''Specifications for Water and Wastewater Main Replacements and Water and Wastewater Main Adjustments In I-35 East from Manana Drive to Royal lane.'' One-Time Use.
SS7029  PDF  RTF  Sanitary Sewers - For project 0042-06-077 in Donley County. Install sanitary sewer pipe by pipe bursting or crushing replacement process. One-Time Use.
SS7028  PDF  RTF  Travel Information Center - For project 6473-05-001 in Val Verde County. Furnish all materials, equipment, & labor allowances necessary for the repair & upgrade of the Travel Information Center main bldgs, picnic arbors, benches, walkways, trash containers, Bar-B-Q grills, and water, sewer, & power utility conn One-Time Use.
SS7027  PDF  RTF  Dredging and Mobilization - For project 6472-68-001, 6477-85-001 in Galveston County. Dredge and dispose of dredged materials. This Specification also consists of mobilization (i.e., move-in and move-out) expenses incurred by the Contractor in order to perform the dredging. One-Time Use.
SS7026  PDF  RTF  Water Main Replacements - For project 0019-01-146, 0463-02-080, 0718-02-076 in Johnson, Midland, Tarrant Counties. Furnish materials, labor, and equipment necessary to install the water system in conformance with the City of Fort Worth (City) requirements and details shown on the plans. One-Time Use. Special Provisions exist.
SS7025  PDF  RTF  Water Mains - For project 0255-07-140, 0463-02-080, 0928-01-013 in Hidalgo, Midland, Polk Counties. Furnish labor, materials, and equipment necessary to provide a complete water main system in accordance with the plans and Specifications, and in accordance with the Department's Utility Accommodations Policy. One-Time Use.
SS7024  PDF  RTF  Automatic Storm Water Pump Station - For project 0027-13-200, 0050-06-092 in Harris County. Construct an automatic storm water pump station located as shown in the plans as part of the North Houston Highway Improvements Segment 3B Project. One-Time Use.
SS7023  PDF  RTF  Water Mains - For project 0027-13-200, 0327-09-002, 0918-47-403 in Dallas, Harris, Kleberg Counties. Furnish labor, materials, and equipment necessary to provide a complete water main system in conformance with the plans and Specifications. One-Time Use.
SS7022  PDF  RTF  Pavement Marking Water Treatment - For project 6471-84-001 in Pecos County. Use medium water pressure (MWP) equipment to agitate and remove dirt, oxidized paint, thermoplastic and hydrocarbon settlement from pavement markings to improve the retroreflectivity. One-Time Use.
SS7021  PDF  RTF  Repair of Ultra-Thin and Thin White Topping - For project 6448-21-001 in Ector County. Repair damaged ultra-thin and thin white topping concrete panels in conformance with the details shown on the plans or as directed. One-Time Use.
SS7020  PDF  RTF  Debris Removal and Disposal - For project 0911-00-115, 6472-95-001, 6490-51-001 in Angelina, Harris, Montgomery Counties. Provide emergency removal and disposal of debris from the highway right of way which is created by a hurricane or other type of natural disaster. One-Time Use.
SS7019  PDF  RTF  Subsurface Utility Locate - VOID - DO NOT USE. For project 0024-07-059, 0152-03-065, 0168-07-043, 0265-03-043, 0289-04-034, 0323-01-028, 0337-01-053, 0700-01-049, 0805-04-038, 0909-00-074, 0909-38-095, 0914-00-480, 0914-00-481, 0914-00-514, 0914-05-239, 1378-01-050, 1480-02-035, 6468-22-001 in Bastrop, Bexar, Burnet, Caldwell, Deaf Smith, Falls, Hays, McLennan, Randall, San Saba, Travis, Williamson Counties. Perform Quality Level A to locate subsurface utility facility. Locate means to obtain precise horizontal and vertical position, material type, condition, size, and other data. Replaced by SS5061 . One-Time Use.
SS7018  PDF  RTF  Diesel Electric Ferry - For project 0912-73-222 in Galveston County. Furnish materials, equipment, labor, and allowance necessary for the construction of a 70 car Diesel Electric Ferry, as shown in the plans and in the technical Specifications. One-Time Use.
SS7017  PDF  RTF  Vacuum Cleaning - For project 6463-15-001, 6477-31-001, 6484-67-001 in Bexar, Jefferson, Liberty Counties. Vacuum-clean bridge joints and drain inlets and raceways. One-Time Use.
SS7016  PDF  RTF  Fender System Repair - For project 0901-27-054 in Red River County. Repair fender systems to include timber piling, treated timbers, and batter plates. One-Time Use.
SS7015  PDF  RTF  Sanitary Sewer and Water Line - For project 1502-01-032 in Lubbock County. Governs for all materials and work necessary for installation of all sanitary sewer mains, fittings, connections, service lines, and other appurtenances necessary for complete and operating system to be constructed within existing right of way. One-Time Use.
SS7014  PDF  RTF  Curb Inlet Sediment Control Device - For project 0015-13-432, 0017-01-025, 0521-01-057, 1502-01-031 in Bexar, Lubbock, Travis Counties. Install, maintain, and remove sediment control devices placed at the openings of curb inlets. One-Time Use.
SS7013  PDF  RTF  Water Mains and Sanitary Sewers City of Arlington - For project 0902-90-228 in Tarrant County. Construct water mains and sanitary sewers of the sizes, materials, and dimensions shown on the plans, including pipe, joints, and connections to new and existing pipes; casing; valves; fittings; fire hydrants; meters; and blocking. One-Time Use.
SS7012  PDF  RTF  Grounds Maintenance - For project 0914-00-480, 6470-51-001 in Lubbock, Travis Counties. No Specification attached - This number is for State Use projects only as administered by Maintenance to obtain bid codes One-Time Use.
SS7011  PDF  RTF  Janitorial Maintenance - For project 6470-52-001 in Lamb County. No Specification attached - This number is for State Use projects only as administered by Maintenance to obtain bid codes One-Time Use.
SS7010  PDF  RTF  Maintenance Speed Limit Signing - Furnish, install, maintain, and remove all maintenance speed limit signing and materials. Cover existing speed limit signs as shown on plans and as directed. Required for all projects using Maintenance Speed Limit Signing beginning with the January 2025 letting. However, use of this Special Specification prior to the January 2025 letting is at the district's option. Statewide Use.
SS7009  PDF  RTF  Overhead and Underground Electric Distribution - For project 0015-13-423, 0015-13-432, 0015-13-437, 0015-13-442, 0113-13-168 in Travis County. Incorporates Austin Energy requirements for construction of 12.47/7.2-kV, 480/277-V, 208/120-V, and 120/240-V overhead and underground electric distribution, utilization lines and associated equipment, and construction assembly units. One-Time Use. Special Provisions exist.
SS7008  PDF  RTF  Water Mains and Sanitary Sewers - For project 0015-13-432, 0015-13-437, 0015-13-442, 0015-13-452, 0113-13-168 in Travis County. This Special Specification governs for all materials, equipment, and labor necessary for the installation of all water mains and sanitary sewer lines, as shown on the plans and in compliance with the Department's Utility Accommodation Rules (UAR). One-Time Use.
SS7007  PDF  RTF  Traffic Control Flagging - For project 6465-86-001, 6465-87-001 in Gregg, Smith Counties. Provide flaggers for highway traffic control, including flagging paddles. Replaces SS5006 . One-Time Use.
SS7006  PDF  RTF  Sanitary Sewers - For project 0027-13-200, 0271-05-025, 0367-06-065, 0912-00-519, 0912-72-541 in Fort Bend, Galveston, Harris Counties. Furnish labor, materials, and equipment for sanitary sewer system in accordance with ANSI, AWWA, ASTM, ASA, SSPC, ACI, NSF, and Department's Utility Accommodation Policy. One-Time Use. Special Provisions exist.
SS7004  PDF  RTF  Water Mains - For project 0271-05-025, 0338-07-019, 0367-06-065, 0463-02-080, 0909-36-198, 0912-00-519, 0912-00-663, 0912-72-541, 0928-01-013 in Coryell, Fort Bend, Galveston, Harris, Midland, Montgomery, Polk Counties. Construct water mains, including pipe, joints, and connections to new and existing pipes; casing; valves; fittings; fire hydrants; meters; and blocking. One-Time Use. Special Provisions exist.
SS7003  PDF  RTF  Welded Steel Casing Pipe (Open Cut) - For project 0864-01-069, 1057-03-051 in Cameron, Hidalgo Counties. Install welded steel pipe based on the following. The diameter of the pipe must be as shown on the construction drawings (minimum size requirements). Joints must be continuous circumferential weld in accordance with AWS D 1 1 One-Time Use.
SS7002  PDF  RTF  Wick Drains - For project 0028-03-111 in Liberty County. Furnish labor, materials, and equipment necessary to furnish and place prefabricated wick drains at the locations shown on the plans and at locations designated, in accordance with the requirements of these Specifications. One-Time Use.
SS7001  PDF  RTF  Cleaning Bridge Components - Clean various bridge components, including washing bridge decks and removing all debris from abutment caps and bent caps. Statewide Use. Special Provisions exist.
SS7000  PDF  RTF  Storm Sewer (Television Inspection) - Televise and provide color digital video recordings of existing storm sewer lines using a color closed-circuit television (CCTV) inspection unit to determine the condition of the lines. Statewide Use.