2014 English Special Specifications to Items 7000 - 7999 Maintenance (All)


2014 English Special Specifications by Item (All)
Specification Information
Search For a Special Provision or Specification

SS7314  PDF  RTF  Water Line Replacements - For project 2056-01-042 in Collin County. Furnish, install, and remove water pipe, water valves, pipe fittings, steel encasement pipes for water lines, and supporting materials as shown on the plans and details. One-Time Use.
SS7313  PDF  RTF  Water Line and Sanitary Sewer Installation - For project 0159-07-007 in Tom Green County. Furnish labor, materials, and equipment necessary to provide complete water line and sanitary sewer construction and adjustments in conformance with the standards, plans, and Specifications. One-Time Use.
SS7312  PDF  RTF  Automated Barrier Gate - For project 0196-02-128 in Denton County. Remove and relocate existing automated barrier gate assemblies on new concrete traffic barrier as shown on the plans or as directed. One-Time Use.
SS7311  PDF  RTF  Water Line Installation - For project 0257-04-031 in Eastland County. Water mains, including valves, valve boxes, service meters, hydrants, blocking, fittings, and other appurtenances for potable water distribution systems. Steel and iron materials must be in accordance with 23 CFR 635.410 provisions of Buy America. One-Time Use.
SS7310  PDF  RTF  Sanitary Sewer - For project 0257-04-031 in Eastland County. This Item governs materials and work for installation of sanitary sewer mains, fittings, connections, service lines, and other appurtenances for system constructed within existing right of way. One-Time Use.
SS7309  PDF  RTF  Bridge Structure Cleaning - For project 0151-09-150 in Travis County. Remove all extraneous material from bridge bents, girders, and deck soffits, and wash bridge elements. One-Time Use. Special Provisions exist.
SS7308  PDF  RTF  Storm Water Pump Station - For project 0389-06-088 in Galveston County. Construct one new storm water pump station located as shown on the plans as part of the improvements to State Highway 146. The pump station will drain System B. One-Time Use.
SS7307  PDF  RTF  Snow and Ice Control - For project 6404-39-001 in Galveston, Harris Counties. Treat bridges and designated locations with de-icing material. One-Time Use.
SS7306  PDF  RTF  Bridge Substructure Debris Cleaning - For project 0120-01-022 in Hamilton County. Remove all debris from abutment caps and bent caps. One-Time Use.
SS7305  PDF  RTF  Water Line Construction and Adjustments - For project 0675-01-069 in Freestone County. Furnish labor, materials, and equipment necessary to provide complete water line construction and adjustments in conformance with the standards, plans, and Specifications. One-Time Use.
SS7304  PDF  RTF  Landscape Paver Installation - For project 0363-03-056 in Tarrant County. This Item will govern for the installation of owner provided landscape pavers, inclusive of reinforced concrete subbase, and galvanized steel angle edge restraint, in conformance with the details shown on the plans and in this Specification. One-Time Use.
SS7303  PDF  RTF  Installation of Water Lines and Fire Hydrants - For project 0902-90-034 in Tarrant County. Furnish, install, or replace water pipe, water valves, fire hydrant assemblies, pipe fittings, PVC encasement under pavement, connection to existing water lines, boring, directional drilling (HDD), and supporting materials. One-Time Use.
SS7302  PDF  RTF  Butterfly Valve Vault and Blow-Off Valve Modifications - For project 0081-03-047 in Denton County. Remove existing concrete butterfly valve vault top slab and install RCP riser pipe and concrete top slab as shown on plans. One-Time Use.
SS7301  PDF  RTF  Steel Split Casing - For project 0081-03-047 in Denton County. Install 66-in. steel split casing pipe as shown on plans. One-Time Use.
SS7300  PDF  RTF  Water Main Relocation - For project 2679-03-015 in Collin County. Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies, pipe fittings, encasement pipes for water lines, adjust wastewater manhole and supporting materials. One-Time Use.
SS7299  PDF  RTF  Water Line Split Steel Casings - For project 0215-01-044 in Comal County. Provide and install split steel casings in accordance with the plans and Specifications and in compliance with the Department's Utility Accommodation Policy. One-Time Use.
SS7298  PDF  RTF  Performance Based Operations and Maintenance of Managed Lanes - For project 6399-97-001 in Dallas County. This SS is similar to SS7161 for two new managed lanes that will govern the complete daily operation for Southern Gateway (US 67 and IH 35 E) Managed Lanes in the Dallas area. One-Time Use.
SS7297  PDF  RTF  Water Mains and Sanitary Sewers - For project 0015-10-062 in Travis County. This Item will govern for all materials, equipment, and labor necessary for the installation of all exterior water mains, all sanitary sewer lines, drain lines, and all distribution lines connected to the various structures as shown on the plans. One-Time Use.
SS7296  PDF  RTF  Water and Wastewater Utility Relocation - For project 0073-07-068 in Live Oak County. Furnish all materials, equipment, and labor allowances necessary for the relocation of the water and wastewater utilities at the safety rest area. One-Time Use.
SS7295  PDF  RTF  Sanitary Sewer Lift Station - For project 0028-01-067, 0188-04-035 in Brazoria, Harris Counties. Furnish labor, materials, and equipment necessary to provide a submersible sanitary sewer lift station. One-Time Use.
SS7294  PDF  RTF  Water Main Relocation  - For project 0619-03-061 in Collin County. Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies, pipe fittings, encasement pipes for water lines, and supporting materials. One-Time Use.
SS7293  PDF  RTF  Bitter Creek WSC Water Supply Water Utilities - For project 0006-02-114 in Nolan County. This Item will govern the installation of water facilities belonging to the Bitter Creek WSC Water Supply. One-Time Use.
SS7292  PDF  RTF  City of Roscoe - Sanitary Sewer - For project 0006-02-114 in Nolan County. Furnish labor, materials, and equipment necessary to provide a complete sanitary sewer system in accordance and compliance with ANSI, AWWA, ASTM, ASA, SSPC, ACI, and NSF standards. One-Time Use.
SS7291  PDF  RTF  Batch Water Quality Pond System Maintenance - For project 6395-40-001 in Bexar County. Furnish maintenance services on Batch Water Quality Pond Systems and associated appurtenances which function as a storm water treatment system as shown on the plans. One-Time Use.
SS7290  PDF  RTF  Hazardous Material Trap Maintenance - For project 6395-40-001 in Bexar County. Furnish maintenance services on Hazardous Material Traps and associated appurtenances as shown on the plans. One-Time Use.
SS7289  PDF  RTF  Routine Electrical Maintenance - For project 6392-55-001 in Cameron County. Supplements work shown on Sheets 34 through 38 of the plans. In addition to the plans, this specification includes details regarding general requirements, limits of maintenance, submittals, measurement, and payment. One-Time Use.
SS7288  PDF  RTF  Routine Maintenance of Lift Span Machinery - For project 6392-55-001 in Cameron County. Specification supplement to the work shown on Sheets 27 through 33 of the plans and includes details regarding general requirements, limits of maintenance, submittals, measurement, and payment. One-Time Use.
SS7287  PDF  RTF  Temporary Line Stop Type Valve - For project 0905-06-118 in Lubbock County. Furnish and install Temporary Line Stop Valves of the size and type specified. One-Time Use.
SS7286  PDF  RTF  Water Utilities - For project 0905-06-118 in Lubbock County. Furnish and install water pipe, pipe fittings, thrust block, supporting materials, and demolition of existing water line for the lowering of existing municipal water line. One-Time Use.
SS7285  PDF  RTF  Cleaning Lift Span Superstructure and Substructure - For project 6392-55-001 in Cameron County. Clean lift span superstructure and substructure (Bridge Seats); Clean lift span fender system; and clean and paint structural steel as directed by the Engineer. One-Time Use.
SS7284  PDF  RTF  Acceptance Testing for Sanitary Sewers - For project 0739-02-140 in Jefferson County. This Specification will govern for the testing and sterilization of completed sanitary sewers. One-Time Use.
SS7283  PDF  RTF  Overhead and Underground Electric Distribution - For project 0015-10-062, 0015-13-077, 0113-13-168, 0914-04-334, 0914-04-335, 0914-04-336 in Travis, Williamson Counties. Austin Energy requirements pursuant to the specifications and standards for the construction of overhead and underground electric distribution, utilization lines and associated equipment, and construction assembly units. One-Time Use. Special Provisions exist.
SS7282  PDF  RTF  Gate Valves - For project 0739-02-140 in Jefferson County. This Specification will govern the furnishing and installation of gate valves and supporting materials in accordance with these specifications and the details shown on the plans. One-Time Use.
SS7281  PDF  RTF  Manholes (Sanitary Sewer) - For project 0739-02-140 in Jefferson County. This Specification will govern the construction of sanitary sewer manholes complete in place. One-Time Use.
SS7280  PDF  RTF  Water Mains - For project 0739-02-140 in Jefferson County. Install water mains, fittings, distribution lines, service lines, connections, and other appurtenances necessary for a complete and operating system to be constructed within existing right of way or existing easements owned by the City of Beaumont. One-Time Use.
SS7279  PDF  RTF  Sanitary Sewer Main - For project 0739-02-140 in Jefferson County. Install all sanitary sewer mains, fittings, connections, service lines, and other appurtenances necessary for a complete and operating system. One-Time Use.
SS7278  PDF  RTF  Fire Hydrants - For project 0739-02-140 in Jefferson County. This Specification will govern the furnishing and installation of fire hydrants and appurtenances in accordance with these specifications and the details shown on the plans. One-Time Use.
SS7277  PDF  RTF  Testing and Sterilization of Completed Line - For project 0739-02-140 in Jefferson County. This Specification will govern the testing and sterilization of completed water lines. One-Time Use.
SS7276  PDF  RTF  Sanitary Sewer and Water Line - For project 0130-05-085 in Lubbock County. This Item will govern for all materials and work necessary for the installation of all sanitary sewer mains, fittings, connections, service lines, and other appurtenances. One-Time Use.
SS7275  PDF  RTF  Fire Department Connections - For project 0196-07-034 in Dallas County. Furnish and install fire department connections. One-Time Use.
SS7274  PDF  RTF  Installation of Water Lines and Fire Hydrants - For project 0196-07-034 in Dallas County. Furnish, install, or replace water pipe, water valves, water meters and boxes, fire hydrant assemblies, pipe fittings, steel encasement under pavement, pavement repair, and supporting materials. One-Time Use.
SS7273  PDF  RTF  Horizontal Direction Drilling - For project 0049-09-087 in Brazos County. Install a sanitary sewer by the directional drilling method. One-Time Use.
SS7272  PDF  RTF  Sanitary Sewer Pipe Bursting - For project 0049-09-087 in Brazos County. Replace sanitary sewer mains by Pipe Bursting method using hydraulically and pneumatically operated equipment to break and expanding the host pipe while simultaneously inserting liner pipe within the bore of the host pipe. One-Time Use.
SS7271  PDF  RTF  Water & Wastewater Main Replacements and Adjustments - For project 2374-04-085 in Dallas County. Modifications to Water & Wastewater Main Replacements and Adjustments for the City of Dallas One-Time Use.
SS7270  PDF  RTF  Fire Hydrant, Valve, and Meter Adjustment, Relocate and Reconnect - For project 1804-01-068, 1804-01-072 in Hidalgo County. Furnish, install, relocate, and reconnect fire hydrant assemblies and supporting materials in conformance with McAllen Public Utilities requirements and City of McAllen Standard Design Guide for Pubic Infrastructure. One-Time Use.
SS7269  PDF  RTF  Temporary Water Services - For project 0902-90-147 in Tarrant County. Furnish and install temporary water services in conformance to the City of Fort Worth requirements and details shown on the plans. One-Time Use.
SS7268  PDF  RTF  Dry Docking 28 Car Diesel Electric Ferryboats - For project 6385-36-001 in Nueces County. Provide dry docking, cleaning, painting, and repair work on 28-car diesel electric ferryboats. One-Time Use.
SS7267  PDF  RTF  Natural Gas and Pipeline Utilities - For project 0044-04-047 in Delta, Montague Counties. This document will control the scope relating to abandoned gas and pipeline utilities which must be removed to allow for the construction of US 82 in Montague County. One-Time Use.
SS7266  PDF  RTF  Water Mains and Sanitary Sewers - For project 0015-10-062, 0015-13-077, 0113-13-166, 0113-13-168 in Travis County. This is a new Special Specification that is being requested in coordination with the Utilities Department for the City of Austin. One-Time Use.
SS7265  PDF  RTF  Travel Information Center - For project 6377-33-001 in Orange County. Furnish all materials, equipment, labor allowances and incidentals necessary for the repair and upgrade of the Travel Information Center. One-Time Use.
SS7264  PDF  RTF  Water Mains and Sanitary Sewers - For project 0016-03-114, 0366-01-081 in Hays County. Modify the provisions of SS 7207 'Water Mains and Sanitary Sewers' which pertains to the City of Austin for the City of San Marcos. One-Time Use.
SS7263  PDF  RTF  Ferryboat Equipment Upgrade - For project 0912-73-220 in Galveston County. New Special Spec for Ferryboat Equipment Upgrade. One-Time Use.
SS7262  PDF  RTF  Ferry Landing and Facilities Upgrade - For project 0367-06-065 in Galveston County. New Special Spec to upgrade Ferry landing and Facilities Upgrade One-Time Use.
SS7261  PDF  RTF  Water Mains and Service Lines - For project 0712-01-041 in Johnson County. Provide and install a complete water main system in accordance with the plans and specifications and in compliance with the City of Grandview's policies. One-Time Use.
SS7260  PDF  RTF  Modular Bridge Expansion Joint System - For project 6374-43-001 in Harris County. Design, fabricate, test, ship, and inspect installation of a modular bridge expansion joint system in accordance with this specification and as shown on the plans. One-Time Use.
SS7259  PDF  RTF  Repair Modular Bridge Expansion Joint System - For project 6374-43-001 in Harris County. Design, fabricate, test, ship modular bridge expansion joint repair components in accordance with this specification and as shown on the plans. Remove and install repair components in accordance with this specification and as shown on the plans. One-Time Use.
SS7258  PDF  RTF  Remove and Replace Modular Joint - For project 6374-43-001 in Harris County. Remove and replace a modular bridge expansion joint system. One-Time Use.
SS7257  PDF  RTF  Permanent Concrete Traffic Barrier Repair - For project 6372-50-001, 6372-51-001, 6372-52-001, 6395-40-001, 6411-85-001, 6411-87-001 in Bexar, Comal Counties. Repair or replace damaged permanent concrete traffic barrier as shown on the plans and as directed. One-Time Use.
SS7256  PDF  RTF  Mobilization for Dredging - This Item will consist of mobilization, that is, move in and move out expenses incurred by the Contractor in order to perform the dredging. Districtwide Use. Houston District.
SS7255  PDF  RTF  Pump Station Upgrade - For project 6372-04-001 in San Patricio County. Work includes the replacement of the existing pump with a new dual pump system and a new electrical. Finish all materials, labor, tools, equipment, transportation, etc. as required for a complete electrical installation. One-Time Use.
SS7254  PDF  RTF  Water Mains and Service Lines - For project 0658-01-045 in Bexar County. Provide and install a complete water main system in accordance with the plans and specifications and in compliance with the Department's Utility Accommodation Policy (UAP) (Title 43, T.A.C., Sections 21.31-21.55). One-Time Use.
SS7253  PDF  RTF  Upgrade TransVision Video Wall - For project 0008-12-095 in Tarrant County. Furnish all materials, equipment, labor allowances, and incidentals necessary for the construction required to upgrade the TransVision Video Wall. One-Time Use.
SS7252  PDF  RTF  Sanitary Sewer and Waterline - For project 1502-01-029, 1502-01-032 in Lubbock County. This Item will govern for all materials and work necessary for the installation of all sanitary sewer mains, fittings, connections, service lines, and other appurtenances. One-Time Use.
SS7251  PDF  RTF  Subsurface Utility Locate - For project 0015-10-062, 0015-13-077, 0016-01-133, 0016-16-028, 0113-13-166, 0273-04-046, 0273-04-048, 0285-03-062, 0511-03-013, 0573-01-034, 0573-01-041, 0683-04-022, 0700-01-045, 0700-03-145, 0914-00-468, 0914-04-334, 0914-04-335, 0914-04-336, 0987-03-012, 0987-03-014, 1186-01-091, 1197-01-021, 1200-03-060, 1200-03-064, 1539-02-034, 1776-01-036, 1776-02-019, 3210-01-019 in Bastrop, Burnet, Hays, Travis, Williamson Counties. Perform Quality Level A to locate a subsurface utility facility as shown on the plans or as directed. One-Time Use.
SS7250  PDF  RTF  Dredging - Dredge and dispose of dredged material. Districtwide Use. Houston District.
SS7249  PDF  RTF  Replacement of Water and Sewer Lines - For project 0195-01-119 in Cooke County. Furnish, install, or replace water and sewer lines and supporting materials in conformance with the North Central Texas Council of Governments and details shown on the plans, or as directed. One-Time Use.
SS7248  PDF  RTF  Upgrade DalTrans Video Wall - For project 0918-00-353 in Dallas County. Furnish all materials, equipment, labor allowances, and incidentals necessary for the construction required to upgrade the DalTrans Video Wall. One-Time Use.
SS7247  PDF  RTF  Sanitary Sewer Lines, Water Mains and Appurtenances - For project 0540-04-005 in Brazos County. Furnish and install all materials, equipment, and labor listed in the Special Specification ''Sanitary Sewer Lines, Water Mains and Appurtenances.'' One-Time Use.
SS7246  PDF  RTF  Sand Filtration System - For project 0015-08-147, 0914-33-068 in Hays, Williamson Counties. Furnish materials for the construction of sand filtration system as shown on the plans. One-Time Use.
SS7245  PDF  RTF  Sanitary Sewers - For project 0902-90-036 in Tarrant County. Furnish labor, materials, and equipment necessary to provide a complete sanitary sewer system in accordance and compliance with AWWA, ASTM, ANSI, ACI, and NSF standards, the plans, specifications, and in compliance with the City of Colleyville One-Time Use.
SS7244  PDF  RTF  Water Mains - For project 0902-90-036 in Tarrant County. Furnish labor, materials, and equipment necessary to provide a complete water main system in conformance with the plans and specifications, and in compliance with the City of Colleyville. One-Time Use. Special Provisions exist.
SS7243  PDF  RTF  Water Lines - For project 0902-90-141 in Tarrant County. Provide and install a complete water main system in accordance with the plans and specifications and in compliance with City of Haslet, Texas (City) requirements. One-Time Use.
SS7242  PDF  RTF  Sanitary Sewers - For project 0902-90-141 in Tarrant County. Provide and install complete sanitary sewer construction and adjustments in conformity with the details shown on the plans. One-Time Use.
SS7241  PDF  RTF  Water Main Adjustments - For project 0902-90-141 in Tarrant County. Adjust butterfly valve vault and relocate cathodic protection access point for water lines and supporting materials in conformance with the City of Fort Worth requirements and details shown on the plans. (City of Fort Worth) One-Time Use.
SS7240  PDF  RTF  Water and Wastewater Main Replacements and Adjustments - For project 0047-07-228 in Dallas County. Furnish and install all materials, equipment, and labor listed in the ''SPECIAL SPECIFICATIONS FOR WATER & WASTEWATER MAIN REPLACEMENTS AND ADJUSTMENTS'', DWU CONTRACT NO. 20-113/114F, in Dallas, Texas. One-Time Use.
SS7239  PDF  RTF  Lane Closures (Hourly) - Install, maintain, and remove lane closures as shown on the plans, or as directed by the Engineer. This specification is intended for lane closures approximately 24 hr. in duration or less. Districtwide Use. Atlanta District.
SS7238  PDF  RTF  Bridge Debris Removal and Disposal - For project 6359-84-001 in Llano County. Provide removal and disposal of debris from a river channel which is created by a hurricane or other type of natural disaster. One-Time Use.
SS7237  PDF  RTF  Fender and Dolphin Installation - For project 6363-67-001 in Harris County. Furnish and install a new fender and dolphin system to replace the existing dolphins and both East and West Fender Systems at the IH-10 San Jacinto River Bridge in accordance with the plans. One-Time Use.
SS7236  PDF  RTF  Stormwater Treatment System - For project 0028-14-091 in Orange County. Furnish and install pre-engineered stormwater treatment system, complete in place. One-Time Use.
SS7235  PDF  RTF  Water and Sewer Line Construction and Adjustments - For project 2399-01-074 in Brazos County. Furnish labor, materials, and equipment necessary to provide a complete water line and sewer line construction and adjustments in accordance with the standards, plans, and specifications. One-Time Use.
SS7234  PDF  RTF  Water and Sanitary Sewer - For project 0343-04-044 in Erath County. Furnish, install, or replace water and sanitary sewer systems in conformance with the City of Stephenville requirements and details shown on the plans. One-Time Use.
SS7233  PDF  RTF  Remove and Install Ferry Landing Grating Panels - For project 6354-74-001 in Nueces County. This Item will govern for the furnishing of all labor, equipment and materials for the removal and installation of the Ferry Landing Grating Panels as shown on the plans. One-Time Use.
SS7232  PDF  RTF  Sanitary Sewer - For project 0257-05-045 in Comanche County. This Item will govern for all materials and work necessary for the installation of all sanitary sewer mains, fittings, connections, service lines, and other appurtenances necessary for a complete and operating system. One-Time Use.
SS7231  PDF  RTF  Water Line Installation - For project 0257-05-045 in Comanche County. Water mains including valves, valve boxes, service meters, hydrants, blocking, fittings, and other appurtenances for potable water distribution systems. One-Time Use.
SS7230  PDF  RTF  Replacement of Water and Sewer Lines - For project 0430-01-057 in Dallas County. Furnish, install, or replace complete water main and sewer line system in conformance with the North Central Texas Council of Governments (NCTCOG) specifications and as shown on the plans. One-Time Use.
SS7229  PDF  RTF  SH 207 Pump Station Upgrades - For project 0356-02-048 in Carson County. Work includes upgrade of the existing electrical and mechanical system for the existing SH 207 Pump Stations. One-Time Use.
SS7228  PDF  RTF  Maintenance of Underground Water Quality Facilities - For project 6354-67-001 in Williamson County. Perform hydraulic cleaning, vacuum removal and disposal of debris and litter in pond risers, material traps, splitter boxes, rock gabions, gabion mattress, sedimentation basins, sand filtration ponds, and outlet structures. One-Time Use.
SS7227  PDF  RTF  Sanitary Sewer - For project 0404-02-036 in Stephens County. Materials and work necessary for the installation of all sanitary sewer mains, fittings, connections, service lines, and other appurtenances necessary for a complete and operating system to be constructed within the existing right-of-way. One-Time Use.
SS7226  PDF  RTF  Force Main - For project 0362-07-009 in Palo Pinto County. Furnish and install or replace encasement and piping for proposed force main, and supporting materials in conformance to the North Central Texas Council of Governments (NCTCOG) Fifth Edition (2017) requirements. One-Time Use.
SS7225  PDF  RTF  Water Line Construction and Adjustments - For project 2455-01-034 in Grayson County. Furnish labor, materials, and equipment necessary to provide a complete water line construction and adjustments in accordance with the standards, plans, and specifications. One-Time Use.
SS7224  PDF  RTF  Mobilization for Dredging - For project 6349-83-001, 6352-30-001 in Galveston County. This Item shall consist of mobilization, that is, move in and move out expenses incurred by the Contractor in order to perform the dredging. One-Time Use.
SS7223  PDF  RTF  Dredging - For project 6349-83-001, 6352-30-001 in Galveston County. Dredge and dispose of dredged material. One-Time Use.
SS7222  PDF  RTF  Performance Based Maintenance of Highways - For project 6336-08-001 in Travis County. Perform Maintenance Services, as described herein, on mainlane roadways, frontage roads, shoulders, ramps, intersections, cross streets, roadsides, bridges, pump stations, truck parking, drainage structures, traffic operations, etc. One-Time Use.
SS7221  PDF  RTF  Water Mains, Sewer Lines and Appurtenances Replacements - For project 0902-90-089 in Tarrant County. Install or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies, pipe fittings, encasement pipes for water lines, sewer pipe , manholes in conformance to the City of Fort Worth. One-Time Use.
SS7219  PDF  RTF  Sanitary Sewer Lift Station - For project 0255-15-005 in Jim Wells County. Furnish labor, materials, and equipment necessary to provide a triplex, end-suction, self-priming sanitary sewer lift station and all-weather building. One-Time Use.
SS7218  PDF  RTF  Water Mains and Sanitary Sewers - For project 0255-15-005 in Jim Wells County. Furnish labor, materials, and equipment necessary to provide a complete water main system. One-Time Use.
SS7217  PDF  RTF  Natural Gas Pipeline - For project 1258-04-065 in Harris County. Adjust gas facility access covers to match the proposed grade of sidewalk or landing. One-Time Use.
SS7216  PDF  RTF  Insertion Valves - For project 0271-02-049 in Austin County. Furnish labor, materials, and equipment necessary to provide installation of an insert valve. One-Time Use.
SS7215  PDF  RTF  Natural Gas Pipeline - For project 0003-01-055 in El Paso County. Furnish all materials, tools, supplies, labor and equipment necessary for a complete natural gas pipeline. One-Time Use.
SS7214  PDF  RTF  Water Systems - For project 0176-01-081, 0176-04-056 in Nacogdoches, Polk Counties. Furnishing new materials and installing water systems. One-Time Use. Special Provisions exist.

Pages in Groups of 100:  1  2  3  4 

2014 English Special Specifications by Item (All)
Specification Information
Search For a Special Provision or Specification