2014 English Special Provisions for Pharr - District 21 (Statewide & Districtwide, Current)
|
SP400-001 |
PDF |
RTF |
EXCAVATION AND BACKFILL FOR STRUCTURES - Unless otherwise shown on the plans, the sand backfill shall have 70-100% passing a No. 10 sieve. The plastic Index (PI) as determined by Test Method Tex-106-E shall not exceed 6.
Districtwide Use.
|
SP302-008 |
PDF |
RTF |
AGGREGATES FOR SURFACE TREATMENTS - Combined SP 302-001 and SP 302-003, to create DW special provision for PHR District.
Districtwide Use.
|
SP302-001 |
PDF |
RTF |
Aggregates for Surface Treatments - Modifies Article 302.2 Materials, Section A. Aggregate, Table 2. (2004 SP302-013)
Districtwide Use.
|
SP3096-002 |
PDF |
RTF |
Asphalts, Oils, and Emulsions - Table 7 of Section 2.4., ''Emulsified Asphalt,'' and Table 17B of Section 2.10., ''Performance-Graded Binders'' are supplemented.
Districtwide Use.
|