2014 English Special Provisions to Item 350 - MICROSURFACING (Statewide & Districtwide, Current)
| SP350-001 | RTF | - Adds the requirement of an electronic monitoring system; added water content operational tolerance of +/- 2% in Table 5, Operational Tolerances; added the requirement of a test strip to be constructed prior to beginning production. Required for all projects using microsurfacing beginning with the June 2019 letting. Statewide Use. |
| 2014 English Special Provisions by Item (Statewide & Districtwide, Current) | |||
| Specification Information | |||
| Search For a Special Provision or Specification | |||