2014 English Special Provisions to Item 003 - AWARD AND EXECUTION OF CONTRACT (Statewide & Districtwide, Current)
SP003-025 |
PDF |
RTF |
- This Special Provision incorporates 2024 specification language that allows the Engineer to remove project specific insurance when no longer required. Districts have the ability to add this Special Provision by Change Order for 2014 specification projects. This will replace 2014 SP 003-011.
Statewide Use.
|
SP003-013 |
PDF |
RTF |
- This proposed special provision corrects Commercial General Liability Insurance required coverage amount. Required for all projects beginning with the June 2020 letting.
Statewide Use.
|
SP003-011 |
PDF |
RTF |
- Adding back TAC rule language 9.18(a)(2) to Item 3 to allow routine maintenance contracts to obtain insurance prior to beginning of work and not prior to executing the contract as stating in Item 3. Required for all projects beginning with the June 2019 letting.
Statewide Use.
|
SP003-005 |
PDF |
RTF |
- Special Provision is to be used only when a warranty bond is required. (2004 SP003-015; Change Memo de-21-05) Required when used with SS 6019 ''Longitudinal Prefabricated Pavement Markings (PPM) with Warranty,'' SS 6020 ''Multipolymer Pavement Markings (MPM) with Warranty,'' and SS 6021 ''Raised Pavement Markers (RPMs) with Warranty.''
Statewide Use.
|
SP003-002 |
PDF |
RTF |
- Supplements Section 3.4.3. to include additional insurance for maritime contractors. Optional for all projects beginning with the January 2015 letting. Do not use with SP 003-001.
Statewide Use.
|
SP003-001 |
PDF |
RTF |
- Supplements Section 3.4.3. to include insurance for specialty contracts to remove and abate asbestos. Optional for all projects beginning with the January 2015 letting. Do not use with SP 003-002.
Statewide Use.
|
|