2014 English Special Provisions to Item 005 - CONTROL OF THE WORK (Statewide & Districtwide, Current)

SP005-005  PDF  RTF   - Expands Atl. 5.1 Authority of the Engineer, may be either written or oral and payment for Contract work supports it is in accordance w/Contract requirements at that time. Atl. 5.10 Inspection, Engineer may authorize inspectors to adjust trf. control. Statewide Use.
SP005-003  PDF  RTF   - Modifications to Article 5.4 in order to implement requirements of Chapter 473 (HB 2899) of the Transportation Code. Chapter 473 (HB 2899) was effective immediately upon signature (June 2, 2019). Required for all projects using control of the work beginning with the December 2018 letting. Statewide Use.
SP005-002  PDF  RTF   - Notifies the contractor of the range of contract remedies applicable for substandard performance. Required for all projects beginning with the September 2018 letting. Statewide Use.


2014 English Special Provisions by Item (Statewide & Districtwide, Current)
Specification Information
Search For a Special Provision or Specification