2014 English Special Provisions to Item 007 - LEGAL RELATIONS AND RESPONSIBILITIES (Statewide & Districtwide, Current)
SP007-011 |
PDF |
RTF |
- This special provision replaces SP007-001 and has modifications to Section 2.6. Required for all projects beginning with the February 2021 letting.
Replaces SP007-001 . Statewide Use.
|
SP007-008 |
PDF |
RTF |
- Revises and replaces Sections 7.18 & 7.19 of the standard specifications requiring the electronic submittals of payrolls using the Department's system. Required on all construction projects (federally-funded and wholly state-funded). NOTE: The Department's system is LCP Tracker.
Statewide Use.
|
SP007-004 |
PDF |
RTF |
- Identifies contractor co-permittee requirements for storm water management. Required for all projects beginning with the January 2016 letting.
Statewide Use.
|
|
|
DALLAS - DISTRICT 18 |
SP007-009 |
PDF |
RTF |
- When notified by the city of Grapevine that a major traffic generating event is scheduled within at least 180 days, ensure all lanes and ramps are available during peak traffic periods before, during, and after significant traffic generator events. Required on all projects impacting the city of Grapevine. Includes language from SP 007-010.
Districtwide Use.
|
|
|
FORT WORTH - DISTRICT 2 |
SP007-009 |
PDF |
RTF |
- When notified by the city of Grapevine that a major traffic generating event is scheduled within at least 180 days, ensure all lanes and ramps are available during peak traffic periods before, during, and after significant traffic generator events. Required on all projects impacting the city of Grapevine. Includes language from SP 007-010.
Districtwide Use.
|