2024 English Special Provisions Federal Aided Construction Required Check List

Last Update: Monday, August 31, 2026 - 5:17:27 PM

Form FHWA-1273 - Required Contract Provisions. All Federal-Aid Projects (Rev. 5-12)
Wage Rates - All Construction Projects
SP000-001  PDF  RTF  Nondiscrimination - Provides for the inclusion of nondiscrimination clauses into every contract subject to Title VI of the Civil Rights Act of 1964. (2014 SP 000-002) Statewide Use.
SP000-002  PDF  RTF  Certification of Nondiscrimination in Employment - Add certification of having had a previous contract or subcontract subject to the equal opportunity clause required by the Equal Employment Opportunity Regulations of the Secretary of Labor. (2014 SP 000-003) Required on Federal-Aid Construction projects. Statewide Use.
SP000-004  PDF  RTF  On-the-Job Training Program - Revises the process by which training assignments are based. (2014 SP 000-006). Required on all federal-aid construction projects. Statewide Use.
SP000-006  PDF  RTF  Americans with Disabilities Act Curb Ramp Workshop - Before starting work, schedule and attend a mandatory preconstruction Americans with Disabilities Act curb ramp workshop.(2014 SP 000-025) Required for construction projects using ADA curb ramp workshop beginning with the Statewide Use.
SP000-007  PDF  RTF  Cargo Preference Act Requirements in Federal Aid Contracts - Notification of the requirement to comply with the U.S. Department of Transportation's (DOT) Cargo Preference Act Requirements, 46 CFR Part 381, Use of United States-Flag Vessels. (2014 SP 000-241) Required beginning with the Statewide Use.
SP000-017  PDF  RTF  Certificate of Interested Parties (Form 1295) - Revised notification, no longer required to submit a signed notarized Certificate of Interested Parties Disclosure form 1295 at contract execution, with contract amendments (COs), extensions, and renewals. (2014 SP 000-1019) Statewide Use.
SP000-125  PDF  RTF  Notice of Contractor Performance Evaluations - In accordance with Texas Transportation Code Subchapter 223.012, the Engineer will evaluate Contractor performance based on quality, safety, and timeliness of the project. Required for all low-bid projects other than MMC and TMC projects beginning with the December 2025 letting. However, use of this Special Provision prior to the December 2025 letting is at the district's option. Statewide Use.
SP000-224  PDF  RTF  Schedule of Liquidated Damages - Required by federal regulation under 23 CFR 635.127(b), the Schedule of Liquidated Damages must be reviewed and updated every two years. The analysis was performed by CTR with concurrence and approval from the Department's Construction Division. required for all projects beginning with the September 2026 letting. However, use of this Special Provision prior to the September 2026 letting is at the district's option. Replaces SP000-031 . Statewide Use.
SP002-002  PDF  RTF  INSTRUCTIONS TO BIDDERS - Allows for technical pre-qualification for railroad work to be submitted before construction. Previous versions required submission prior to bid. (2014 SP 002-012) Required for projects with railroad work. Statewide Use.
SP002-004  PDF  RTF  INSTRUCTIONS TO BIDDERS - This Specification Provision adds language to accommodate amendment to the TAC Code. This new Special Provision will also replace current statewide Special Provision 002-003. Required for all projects beginning with the September 2026 letting. However, use of this Special Provision prior to the September 2026 letting is at the district's option. Replaces SP002-003 . Statewide Use.
SP003-006  PDF  RTF  AWARD AND EXECUTION OF CONTRACT - Updated language to reflect 43 TAC 9.15 where the Department may determine mathematically unbalanced bids as non-responsive bids. Required for all projects other than MMC and TMC projects beginning with the December 2025 letting. However, use of this Special Provision prior to the December 2025 letting is at the district's option. Statewide Use.
SP006-009  PDF  RTF  CONTROL OF MATERIALS - Build America, Buy America provision requiring Manufactured Products, Iron or Steel products, and Construction Materials manufactured in the United States. Manufactured Products require the final assembly to occur in America. Required on all federal projects beginning with the December 2025 letting. For applicability questions, please contact the Design Division Final PS&E Processing Section. It will also replace the current statewide SP 006-005, effective December 2025. Replaces SP006-005 . Statewide Use.
SP006-017  PDF  RTF  CONTROL OF MATERIALS - Implements Phase 2 of the Buy America requirements for Manufactured Products, including final assembly in the United States and a domestic component cost exceeding 55 percent. It also adopts the terminology Federal Domestic Materials Program (FDMP). Required on all Federally-aid projects federally obligated on or after October 1, 2026, which is equivalent to the December 2026 state letting and forward Statewide Use.
SP007-001  PDF  RTF  LEGAL RELATIONS AND RESPONSIBILITIES - Replaces Article 7.20., ''Security Incidents.'' Defines notification, credential behavior, liability and prohibited technologies in regards to Cybersecurity requirements. Required for all projects other than MMC and TMC projects beginning with the September 2025 letting. However, use of this Special Provision prior to the September 2025 letting is at the district's option. Statewide Use.
SP008-001  PDF  RTF  PROSECUTION AND PROGRESS - Supplemented sections in Article 8.6., Failure to Complete Work On Time. (2014 SP 008-045) Required when lane closure assessment fees are utilized. Statewide Use.
SP009-002  PDF  RTF  MEASUREMENT AND PAYMENT - Modifies the third paragraph of Article 9.7., ''Payment for Extra Work and Force Account Method.'' The estimated extra work limit for force accounts allowing invoice only is increased from $10,000 to $30,000. Required for all projects other than MMC and TMC projects beginning with the September 2025 letting. However, use of this Special Provision prior to the September 2025 letting is at the District's option. Statewide Use.
SP247-001  PDF  RTF  FLEXIBLE BASE - Updated language in Section 2.1.2.4 for ''Type D'' material to consolidate and clarify the requirements for crushed concrete. Updated the language in Section 2.1.2.6 to clarify the requirements for recycled materials. required for all projects using Flexible Base beginning with the July 2026 letting. However, use of this Special Provision prior to the July 2026 letting is at the district's option. Statewide Use.
SP260-001  PDF  RTF  LIME TREATMENT (ROAD-MIXED) - Special Provision updated the language in Section 4.5 to clarify the strength requirements. Changed the test procedure for strength testing from Tex-117-E, Part II to Tex-121-E. Required for all projects using Lime Treatment (Road-Mixed) beginning with the July 2026 letting. However, use of this Special Provision prior to the July 2026 letting is at the district's option. Statewide Use.
SP275-001  PDF  RTF  CEMENT TREATMENT (ROAD-MIXED) - Updated the language in Sections 4.4 and 4.5 to clarify the strength requirements. Changed the test procedure for strength testing from Tex-117-E, Part II to Tex-120-E. Required for all projects using Cement Treatment (Road-Mixed) beginning with the July 2026 letting. However, use of this Special Provision prior to the July 2026 letting is at the district's option. Statewide Use.
SP292-001  PDF  RTF  ASPHALT TREATMENT (PLANT-MIXED) - Section 4.11.2.1., ''Operational Tolerances,'' is voided and replaced. Required for all projects using Asphalt Treatment (Plant-Mixed) beginning with the February 2025 letting. However, use of this Special Provision prior to the February 2025 letting is at the district's option. Statewide Use.
SP300-003  PDF  RTF  ASPHALTS, OILS, AND EMULSIONS - Tables 3 and 18 has been updated with specific values for polymer separation and with reference to Tex-554-C. Specification limits for cement mixing in Table 8 has been updated to reflect the values in SS 3096 (2014). Required for all projects using Asphalts, Oils, and Emulsions, beginning with the February 2025 letting. However, use of this Special Provision prior to the February 2025 letting is at the District's option. Statewide Use.
SP316-001  PDF  RTF  SEAL COAT - This Special Provision applies only to Districtwide seal coat, adds aggregate paid by the ton, and includes required Certifications for Department and Contractor personnel. Required for all projects using Seal Coat, beginning with the February 2025 letting. However, use of this Special Provision prior to the February 2025 letting is at the District's option. Statewide Use.
SP410-001  PDF  RTF  SOIL NAIL ANCHORS - Corrected test method and changed the title of Section 410.2.1., from ''Hydraulic Cement Concrete'' to ''Cementitious Grout.'' Required for all projects using Soil Nail Anchors beginning with the August 2026 letting. However, use of this Special Provision prior to the August 2026 letting is the district's option. Statewide Use.
SP411-001  PDF  RTF  ROCK NAIL ANCHORS - Update to Section 411.2.1., ''Hydraulic Cement Concrete.'' Required for all projects using Rock Nail Anchors beginning with the July 2026 letting. However, use of this Special Provision prior to the July 2026 letting is at the district's option. Statewide Use.
SP440-002  PDF  RTF  REINFORCEMENT FOR CONCRETE - This special provision adds reference to DMS-7335 in Section 440.2.13 to replace existing references to ASTM specifications. Required for all projects using reinforcement for concrete beginning with the August 2026 letting. Use of this Special Specification prior to August 2026 letting is the district's option. Statewide Use.
SP500-001  PDF  RTF  MOBILIZATION - This Special Provision adds incremental mobilization payments for when 2%, 6%, and 8% of the adjusted Contract amount for construction items is earned. Required for all projects $150 million or greater using ''Mobilization'' beginning with the September 2025 letting. However, use of this Special Provision prior to the September 2025 letting is at the district's option. Statewide Use.
SP500-002  PDF  RTF  MOBILIZATION - This Special Provision alters the minimum payment when 1% or more of the adjusted contract amount of construction items is earned. The lesser amounts were removed. For districtwide sealcoat projects only. Statewide Use.
SP540-001  PDF  RTF  METAL BEAM GUARD FENCE - Requires the qualification of metal beam guard fence manufacturers in accordance with the new DMS-7215 for inclusion on the Metal Beam Guard Fence Rail Element Manufacturers MPL. Required for all projects using Metal Beam Guard Fence beginning with the March 2026 letting. However, use of this Special Provision prior to the March 2026 letting is at the district's option. Statewide Use.
SP628-001  PDF  RTF  ELECTRICAL SERVICES - Removes connection and meter charges from Sections 5.1. and 5.2. to resolve contradiction with second paragraph of Article 5., ''Payment.'' Cost for connection charges and meter charges remain in second paragraph of Article 5., ''Payment.'' Required for all projects using electrical services beginning with the August 2026 letting. Use of this Special Provision prior to the August 2026 letting is the district's option. Statewide Use.
SP666-002  PDF  RTF  RETROREFLECTORIZED PAVEMENT MARKINGS - Requirements of Data Logging Systems equipment for Type II and Type III (TRF Paint and Multipolymer) pavement markings and requiring the ribbon gun and increase in minimum applied thicknesses of Type I (thermoplastic) pavement markings. Required for all projects using Retroreflectorized Pavement Markings beginning with the September 2026 letting. Statewide Use.
SP672-001  PDF  RTF  RAISED PAVEMENT MARKERS - Outlines the use and installation of Raised Pavement Markers (RPMs) in recessed grooves in pavement for areas where snowplows or similar equipment are regularly used, and minimizing the loss of RPMs is desired. Required for all projects using ''Raised Pavement Markers'' beginning with the September 2025 letting. However, use of this Special Provision prior to the September 2025 letting is at the district's option. Use in place of SS 6020. Statewide Use.
SP785-001  PDF  RTF  BRIDGE JOINT REPAIR OR REPLACEMENT - Special Provision revises Article 785.5., ''Measurement,'' to require measurement of header-type joint repair and replacement by cubic foot of header material and linear foot of joint sealant, for consistency with Item 454, ''Bridge Expansion Joints.'' Required for all projects using Bridge Joint Repair or Replacement beginning with the August 2026 letting. However, use of this Special Provision prior to the August 2026 letting is at the district's option. Statewide Use.
SP6011-001  PDF  RTF  Intelligent Transportation System (ITS) Pole with Cabinet - Added Table 3 for Fabrication Tolerances Required for all projects using Intelligent Transportation System (ITS) Pole with Cabinet, beginning with the October 2025 letting. However, use of this Special Provision prior to the October 2025 letting is at the district's option. Statewide Use.
SP6151-001  PDF  RTF  Joint Duct Bank - For project 1690-01-131 in Lamar County. Article 1., first paragraph, and Sections 1.2., 1.3., 2.1., 2.3., 2.5.1., 2.5.2., 2.9.1., 2.10.2., 2.11.1., 2.13., 3.4.1., 3.5., 3.6., 3.7.2., 3.8.1., 3.9., 5.1., and 5.5. are replaced. Articles 3. and 5. are supplemented. Required Special Provision One-Time Use.