| SP000-001 |
PDF |
RTF |
Nondiscrimination - Provides for the inclusion of nondiscrimination clauses into every contract subject to Title VI of the Civil Rights Act of 1964. (2014 SP 000-002)
Statewide Use.
|
| SP000-017 |
PDF |
RTF |
Certificate of Interested Parties (Form 1295) - Revised notification, no longer required to submit a signed notarized Certificate of Interested Parties Disclosure form 1295 at contract execution, with contract amendments (COs), extensions, and renewals. (2014 SP 000-1019)
Statewide Use.
|
| SP000-125 |
PDF |
RTF |
Notice of Contractor Performance Evaluations - In accordance with Texas Transportation Code Subchapter 223.012, the Engineer will evaluate Contractor performance based on quality, safety, and timeliness of the project. Required for all low-bid projects other than MMC and TMC projects beginning with the December 2025 letting. However, use of this Special Provision prior to the December 2025 letting is at the district's option.
Statewide Use.
|
| SP000-224 |
PDF |
RTF |
Schedule of Liquidated Damages - Required by federal regulation under 23 CFR
635.127(b), the Schedule of Liquidated Damages must be reviewed and updated every two years. The analysis was performed by CTR with concurrence and approval from the Department's Construction Division. required for all projects beginning with the September 2026 letting. However, use of this Special Provision prior to the September 2026 letting is at the district's option.
Replaces SP000-031 . Statewide Use.
|
| SP002-004 |
PDF |
RTF |
INSTRUCTIONS TO BIDDERS - This Specification Provision adds language to accommodate amendment to the TAC Code. This new Special Provision will also replace current statewide Special Provision 002-003. Required for all projects beginning with the September 2026 letting. However, use of this Special Provision prior to the September 2026 letting is at the district's option.
Replaces SP002-003 . Statewide Use.
|
| SP003-006 |
PDF |
RTF |
AWARD AND EXECUTION OF CONTRACT - Updated language to reflect 43 TAC 9.15 where the Department may determine mathematically unbalanced bids as non-responsive bids. Required for all projects other than MMC and TMC projects beginning with the December 2025 letting. However, use of this Special Provision prior to the December 2025 letting is at the district's option.
Statewide Use.
|
| SP007-001 |
PDF |
RTF |
LEGAL RELATIONS AND RESPONSIBILITIES - Replaces Article 7.20., ''Security Incidents.'' Defines notification, credential behavior, liability and prohibited technologies in regards to Cybersecurity requirements. Required for all projects other than MMC and TMC projects beginning with the September 2025 letting. However, use of this Special Provision prior to the September 2025 letting is at the district's option.
Statewide Use.
|
| SP008-001 |
PDF |
RTF |
PROSECUTION AND PROGRESS - Supplemented sections in Article 8.6., Failure to Complete Work On Time. (2014 SP 008-045) Required when lane closure assessment fees are utilized.
Statewide Use.
|
| SP009-002 |
PDF |
RTF |
MEASUREMENT AND PAYMENT - Modifies the third paragraph of Article 9.7., ''Payment for Extra Work and Force Account Method.'' The estimated extra work limit for force accounts allowing invoice only is increased from $10,000 to $30,000. Required for all projects other than MMC and TMC projects beginning with the September 2025 letting. However, use of this Special Provision prior to the September 2025 letting is at the District's option.
Statewide Use.
|
| SP010-001 |
PDF |
RTF |
MAINTENANCE AND TRAFFIC MATERIALS CONTRACTS - Updates section 2.7, ''Nonresponsive Bid'' and Section 3.1.2 ''Rejection'' per change in 43 TAC 9.15e . Mathematically and materially unbalanced bids are deemed nonresponsive and are not considered rejected. This Special Provision has been approved for statewide use and is required for all MMC and TMC projects beginning with the December 2025 letting. However, use of this Special Provision prior to the December 2025 letting is at the District's option.
Statewide Use.
|
| SP247-001 |
PDF |
RTF |
FLEXIBLE BASE - Updated language in Section 2.1.2.4 for ''Type D'' material to consolidate and clarify the requirements for crushed concrete. Updated the language in Section 2.1.2.6 to clarify the requirements for recycled materials. required for all projects using Flexible Base beginning with the July 2026 letting. However, use of this Special Provision prior to the July 2026 letting is at the district's option.
Statewide Use.
|
| SP260-001 |
PDF |
RTF |
LIME TREATMENT (ROAD-MIXED) - Special Provision updated the language in Section 4.5 to clarify the strength requirements. Changed the test procedure for strength testing from Tex-117-E, Part II to Tex-121-E. Required for all projects using Lime Treatment (Road-Mixed) beginning with the July 2026 letting. However, use of this Special Provision prior to the July 2026 letting is at the district's option.
Statewide Use.
|
| SP275-001 |
PDF |
RTF |
CEMENT TREATMENT (ROAD-MIXED) - Updated the language in Sections 4.4 and 4.5 to clarify the strength requirements. Changed the test procedure for strength testing from Tex-117-E, Part II to Tex-120-E. Required for all projects using Cement Treatment (Road-Mixed) beginning with the July 2026 letting. However, use of this Special Provision prior to the July 2026 letting is at the district's option.
Statewide Use.
|
| SP292-001 |
PDF |
RTF |
ASPHALT TREATMENT (PLANT-MIXED) - Section 4.11.2.1., ''Operational Tolerances,'' is voided and replaced. Required for all projects using Asphalt Treatment (Plant-Mixed) beginning with the
February 2025 letting. However, use of this Special Provision prior to the February
2025 letting is at the district's option.
Statewide Use.
|
| SP300-003 |
PDF |
RTF |
ASPHALTS, OILS, AND EMULSIONS - Tables 3 and 18 has been updated with specific values for polymer separation and with reference to Tex-554-C. Specification limits for cement mixing in Table 8 has been updated to reflect the values in SS 3096 (2014). Required for all projects using Asphalts, Oils, and Emulsions, beginning with the February 2025 letting. However, use of this Special Provision prior to the February 2025 letting is at the District's option.
Statewide Use.
|
| SP316-001 |
PDF |
RTF |
SEAL COAT - This Special Provision applies only to Districtwide seal coat, adds aggregate paid by the ton, and includes required Certifications for Department and Contractor personnel. Required for all projects using Seal Coat, beginning with the February 2025 letting. However, use of this Special Provision prior to the February 2025 letting is at the District's option.
Statewide Use.
|
| SP410-001 |
PDF |
RTF |
SOIL NAIL ANCHORS - Corrected test method and changed the title of Section 410.2.1., from ''Hydraulic Cement Concrete'' to ''Cementitious Grout.'' Required for all projects using Soil Nail Anchors beginning with the August 2026 letting. However, use of this Special Provision prior to the August 2026 letting is the district's option.
Statewide Use.
|
| SP411-001 |
PDF |
RTF |
ROCK NAIL ANCHORS - Update to Section 411.2.1., ''Hydraulic Cement Concrete.'' Required for all projects using Rock Nail Anchors beginning with the July 2026 letting. However, use of this Special Provision prior to the July 2026 letting is at the district's option.
Statewide Use.
|
| SP440-002 |
PDF |
RTF |
REINFORCEMENT FOR CONCRETE - This special provision adds reference to DMS-7335 in Section 440.2.13 to replace existing references to ASTM specifications. Required for all projects using reinforcement for concrete beginning with the August 2026 letting. Use of this Special Specification prior to August 2026 letting is the district's option.
Statewide Use.
|
| SP500-001 |
PDF |
RTF |
MOBILIZATION - This Special Provision adds incremental mobilization payments for when 2%, 6%, and 8% of the adjusted Contract amount for construction items is earned. Required for all projects $150 million or greater using ''Mobilization'' beginning with the September 2025 letting. However, use of this Special Provision prior to the September 2025 letting is at the district's option.
Statewide Use.
|
| SP500-002 |
PDF |
RTF |
MOBILIZATION - This Special Provision alters the minimum payment when 1% or more of the adjusted contract amount of construction items is earned. The lesser amounts were removed. For districtwide sealcoat projects only.
Statewide Use.
|
| SP540-001 |
PDF |
RTF |
METAL BEAM GUARD FENCE - Requires the qualification of metal beam guard fence manufacturers in accordance with the new DMS-7215 for inclusion on the Metal Beam Guard Fence Rail Element Manufacturers MPL. Required for all projects using Metal Beam Guard Fence beginning with the March 2026 letting. However, use of this Special Provision prior to the March 2026 letting is at the district's option.
Statewide Use.
|
| SP628-001 |
PDF |
RTF |
ELECTRICAL SERVICES - Removes connection and meter charges from Sections 5.1. and 5.2. to resolve contradiction with second paragraph of Article 5., ''Payment.'' Cost for connection charges and meter charges remain in second paragraph of Article 5., ''Payment.'' Required for all projects using electrical services beginning with the August 2026 letting. Use of this Special Provision prior to the August 2026 letting is the district's option.
Statewide Use.
|
| SP666-002 |
PDF |
RTF |
RETROREFLECTORIZED PAVEMENT MARKINGS - Requirements of Data Logging Systems equipment for Type II and Type III (TRF Paint and Multipolymer) pavement markings and requiring the ribbon gun and increase in minimum applied thicknesses of Type I (thermoplastic) pavement markings. Required for all projects using Retroreflectorized Pavement Markings beginning with the September 2026 letting.
Statewide Use.
|
| SP672-001 |
PDF |
RTF |
RAISED PAVEMENT MARKERS - Outlines the use and installation of Raised Pavement Markers (RPMs) in recessed grooves in pavement for areas where snowplows or similar equipment are regularly used, and minimizing the loss of RPMs is desired. Required for all projects using ''Raised Pavement Markers'' beginning with the September 2025 letting. However, use of this Special Provision prior to the September 2025 letting is at the district's option.
Use in place of SS 6020.
Statewide Use.
|
| SP785-001 |
PDF |
RTF |
BRIDGE JOINT REPAIR OR REPLACEMENT - Special Provision revises Article 785.5., ''Measurement,'' to require measurement of header-type joint repair and replacement by cubic foot of header material and linear foot of joint sealant, for consistency with Item 454, ''Bridge Expansion Joints.'' Required for all projects using Bridge Joint Repair or Replacement beginning with the August 2026 letting. However, use of this Special Provision prior to the August 2026 letting is at the district's option.
Statewide Use.
|
| SP6011-001 |
PDF |
RTF |
Intelligent Transportation System (ITS) Pole with Cabinet - Added Table 3 for Fabrication Tolerances Required for all projects using Intelligent Transportation System (ITS) Pole with Cabinet, beginning with the October 2025 letting. However, use of this Special Provision prior to the October 2025 letting is at the district's option.
Statewide Use.
|