Tabulation of Bids for Project STP 2017(136)HES
| Text version of this page | |||
| County: | LUBBOCK | Let Date: | 01/04/17 |
| Type: | IMPROVE TRAFFIC SIGNALS | Seq No: | 3044 |
| Time: | 75 WORKING DAYS | Project ID: | STP 2017(136)HES |
| Highway: | US 84 | Contract #: | 01173044 |
| Length: | 0.001 | CCSJ: | 0053-18-042 |
| Limits: | |||
| From: | INTERSECTION | Check: | $9,000.000 |
| To: | AT MLK | Misc Cost: | $213,809.250 |
| Estimate | $475,477.23 | % Over/Under | Company |
| Bidder 1 | $532,293.75 | +11.95% | WILLIS ELECTRIC CO., LP |
| Bidder 2 | $596,171.75 | +25.38% | AMERICAN LIGHTING AND SIGNALIZATION, INC. |
| Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
| 4166032 | DRILL SHAFT (TRF SIG POLE) (36 IN) | LF | 129.000 | 275.000 | 1 2 | 300.000 459.670 |
| 4166033 | DRILL SHAFT (TRF SIG POLE) (42 IN) | LF | 17.000 | 325.000 | 1 2 | 350.000 474.850 |
| 5006001 | MOBILIZATION | LS | 1.000 | 36,250.970 | 1 2 | 53,000.000 89,027.150 |
| 5026001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 5.000 | 5,000.000 | 1 2 | 5,000.000 2,692.230 |
| 5366004 | CONC DIRECTIONAL ISLAND | SY | 110.480 | 97.000 | 1 2 | 200.000 246.950 |
| 6186046 | CONDT (PVC) (SCH 80) (2") | LF | 585.000 | 9.000 | 1 2 | 4.400 11.150 |
| 6186047 | CONDT (PVC) (SCH 80) (2") (BORE) | LF | 235.000 | 15.500 | 1 2 | 15.000 25.300 |
| 6186058 | CONDT (PVC) (SCH 80) (4") | LF | 1,365.000 | 12.000 | 1 2 | 6.600 14.920 |
| 6186059 | CONDT (PVC) (SCH 80) (4") (BORE) | LF | 2,003.000 | 19.400 | 1 2 | 27.500 28.280 |
| 6206009 | ELEC CONDR (NO.6) BARE | LF | 2,903.000 | 1.500 | 1 2 | 1.500 1.540 |
| 6206012 | ELEC CONDR (NO.4) INSULATED | LF | 2,820.000 | 2.250 | 1 2 | 2.000 2.100 |
| 6246002 | GROUND BOX TY A (122311)W/APRON | EA | 3.000 | 660.000 | 1 2 | 550.000 1,210.430 |
| 6246010 | GROUND BOX TY D (162922)W/APRON | EA | 18.000 | 1,100.000 | 1 2 | 632.500 1,271.020 |
| 6286002 | REMOVE ELECTRICAL SERVICES | EA | 1.000 | 400.000 | 1 2 | 330.000 1,168.340 |
| 6286203 | ELC SRV TY D 120/240 070(SS)AL(N)SP(O) | EA | 1.000 | 4,500.000 | 1 2 | 4,500.000 5,360.460 |
| 6366001 | ALUMINUM SIGNS (TY A) | SF | 42.000 | 28.500 | 1 2 | 25.000 24.380 |
| 6446027 | IN SM RD SN SUP&AM TYS80(1)SA(P) | EA | 30.000 | 615.000 | 1 2 | 700.000 647.480 |
| 6446030 | IN SM RD SN SUP&AM TYS80(1)SA(T) | EA | 16.000 | 830.000 | 1 2 | 875.000 779.000 |
| 6446033 | IN SM RD SN SUP&AM TYS80(1)SA(U) | EA | 6.000 | 823.750 | 1 2 | 1,100.000 926.410 |
| 6446065 | IN BRIDGE MNT CLEARANCE SGN ASSM(TY S) | EA | 2.000 | 175.000 | 1 2 | 2,230.000 2,159.850 |
| 6446076 | REMOVE SM RD SN SUP&AM | EA | 57.000 | 185.000 | 1 2 | 175.000 161.620 |
| 6446077 | REMOVE BRDG MNT CLEARANCE SIGN ASSM | EA | 2.000 | 175.000 | 1 2 | 650.000 770.760 |
| 6666030 | REFL PAV MRK TY I (W)8"(DOT)(100MIL) | LF | 410.000 | 1.900 | 1 2 | 4.150 5.750 |
| 6666036 | REFL PAV MRK TY I (W)8"(SLD)(100MIL) | LF | 1,875.000 | 2.500 | 1 2 | 4.150 5.750 |
| 6666156 | REFL PAV MRK TY I(Y)(MED NOSE)(100MIL) | EA | 6.000 | 500.000 | 1 2 | 42.000 43.700 |
| 6666233 | PAVEMENT SEALER (MED NOSE) | EA | 4.000 | 105.000 | 1 2 | 20.500 21.280 |
| 6666300 | RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) | LF | 70.000 | 0.650 | 1 2 | 2.750 2.880 |
| 6686076 | PREFAB PAV MRK TY C (W) (24") (SLD) | LF | 442.000 | 25.000 | 1 2 | 15.750 21.850 |
| 6686077 | PREFAB PAV MRK TY C (W) (ARROW) | EA | 32.000 | 300.000 | 1 2 | 275.000 345.000 |
| 6686078 | PREFAB PAV MRK TY C (W) (DBL ARROW) | EA | 6.000 | 500.000 | 1 2 | 467.500 747.500 |
| 6686092 | PREFAB PAV MRK TY C (W) (36")(YLD TRI) | EA | 27.000 | 65.000 | 1 2 | 31.000 51.750 |
| 6686101 | PREFAB PAV MRK TY C (Y) (4") (SLD) | LF | 88.000 | 15.000 | 1 2 | 4.700 4.890 |
| 6686106 | PREFAB PAV MRK TY C (Y) (12") (SLD) | LF | 101.000 | 19.000 | 1 2 | 14.000 14.660 |
| 6776003 | ELIM EXT PAV MRK & MRKS (8") | LF | 40.000 | 0.700 | 1 2 | 2.000 2.070 |
| 6776007 | ELIM EXT PAV MRK & MRKS (24") | LF | 320.000 | 0.650 | 1 2 | 4.000 4.140 |
| 6776008 | ELIM EXT PAV MRK & MRKS (ARROW) | EA | 24.000 | 60.000 | 1 2 | 27.500 28.750 |
| 6776009 | ELIM EXT PAV MRK & MRKS (DBL ARROW) | EA | 7.000 | 55.000 | 1 2 | 50.000 51.750 |
| 6786024 | PAV SURF PREP FOR MRK (MED NOSE) | EA | 2.000 | 95.000 | 1 2 | 71.500 74.750 |
| 6806002 | INSTALL HWY TRF SIG (ISOLATED) | EA | 1.000 | 30,000.000 | 1 2 | 20,000.000 15,102.220 |
| 6806004 | REMOVING TRAFFIC SIGNALS | EA | 1.000 | 6,000.000 | 1 2 | 7,500.000 4,554.340 |
| 6826001 | VEH SIG SEC (12")LED(GRN) | EA | 29.000 | 205.000 | 1 2 | 250.000 225.230 |
| 6826002 | VEH SIG SEC (12")LED(GRN ARW) | EA | 9.000 | 200.000 | 1 2 | 250.000 205.070 |
| 6826003 | VEH SIG SEC (12")LED(YEL) | EA | 33.000 | 205.000 | 1 2 | 250.000 207.930 |
| 6826004 | VEH SIG SEC (12")LED(YEL ARW) | EA | 5.000 | 200.000 | 1 2 | 250.000 215.140 |
| 6826005 | VEH SIG SEC (12")LED(RED) | EA | 29.000 | 205.000 | 1 2 | 250.000 210.060 |
| 6826006 | VEH SIG SEC (12")LED(RED ARW) | EA | 5.000 | 200.000 | 1 2 | 250.000 215.140 |
| 6826023 | BACK PLATE (12")(3 SEC) | EA | 30.000 | 65.000 | 1 2 | 100.000 99.700 |
| 6826024 | BACK PLATE (12")(4 SEC) | EA | 4.000 | 85.000 | 1 2 | 120.000 101.630 |
| 6846009 | TRF SIG CBL (TY A)(12 AWG)(4 CONDR) | LF | 2,160.000 | 1.500 | 1 2 | 1.800 1.720 |
| 6846010 | TRF SIG CBL (TY A)(12 AWG)(5 CONDR) | LF | 1,184.000 | 2.000 | 1 2 | 1.850 1.950 |
| 6846012 | TRF SIG CBL (TY A)(12 AWG)(7 CONDR) | LF | 284.000 | 2.000 | 1 2 | 2.000 2.950 |
| 6846021 | TRF SIG CBL (TY A)(12 AWG)(16 CONDR) | LF | 6,174.000 | 3.000 | 1 2 | 4.500 3.650 |
| 6856001 | INSTALL RDSD FLASH BEACON ASSEMBLY | EA | 2.000 | 1,200.000 | 1 2 | 2,750.000 5,924.500 |
| 6866021 | INS TRF SIG PL AM (S)1 ARM(20') | EA | 1.000 | 6,000.000 | 1 2 | 5,500.000 4,977.730 |
| 6866029 | INS TRF SIG PL AM (S)1 ARM(28') | EA | 1.000 | 6,500.000 | 1 2 | 6,500.000 5,122.910 |
| 6866037 | INS TRF SIG PL AM(S)1 ARM(36') | EA | 1.000 | 7,000.000 | 1 2 | 7,550.000 5,897.600 |
| 6866041 | INS TRF SIG PL AM(S)1 ARM(40') | EA | 2.000 | 8,000.000 | 1 2 | 9,000.000 6,489.040 |
| 6866045 | INS TRF SIG PL AM(S)1 ARM(44') | EA | 3.000 | 8,200.000 | 1 2 | 9,800.000 6,685.790 |
| 6866101 | INS TRF SIG PL AM(S)2 ARM(32-28') | EA | 1.000 | 7,100.000 | 1 2 | 9,500.000 8,874.980 |
| 6866165 | INS TRF SIG PL AM(S)2 ARM(44-36') | EA | 1.000 | 9,800.000 | 1 2 | 15,500.000 11,285.910 |
| 6876001 | PED POLE ASSEMBLY | EA | 4.000 | 1,800.000 | 1 2 | 1,750.000 2,702.890 |