Tabulation of Bids for Project BPM - 632682001
| Text version of this page | |||
| County: | CHAMBERS | Let Date: | 03/06/18 |
| Type: | RAIL UPGRADE/JOINT/CONCRETE REP/CLEAN&SE | Seq No: | 4012 |
| Time: | 30 W | Project ID: | BPM - 632682001 |
| Highway: | IH0010 | Contract #: | 03184012 |
| Length: | 1.000 | CCSJ: | 6326-82-001 |
| Limits: | |||
| From: | VARIOUS LOCATIONS IN CHAMBERS | Check: | $6,000 |
| To: | AND LIBERTY COUNTIES | Misc Cost: | $10,000.00 |
| Estimate | $307,119.17 | % Over/Under | Company |
| Bidder 1 | $335,275.50 | +9.17% | OLDCASTLE MATERIALS TEXAS, INC. |
| Bidder 2 | $352,375.00 | +14.74% | ISI CONTRACTING, INC. |
| Bidder 3 | $408,858.30 | +33.13% | WIDGEON CONSTRUCTION, INC. |
| Bidder 4 | $423,001.50 | +37.73% | FNH CONSTRUCTION, LLC |
| Bidder 5 | $485,110.00 | +57.95% | CHAMPION INFRASTRUCTURE, LLC |
| Bidder 6 | $566,679.15 | +84.51% | SCR CIVIL CONSTRUCTION, LLC |
| Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
| 1046028 | REMOVING CONC (MISC) | SY | 25.000 | 20.00 | 1 2 3 4 5 6 | 245.000 33.000 210.000 25.000 200.000 50.000 |
| 1586003 | SPEC EXCAV WORK (HYD EXCAVATOR) | HR | 8.000 | 75.00 | 1 2 3 4 5 6 | 510.000 310.000 165.000 150.000 250.000 1,200.000 |
| 4016001 | FLOWABLE BACKFILL | CY | 13.000 | 250.00 | 1 2 3 4 5 6 | 470.000 235.000 177.000 350.000 230.000 670.000 |
| 4326033 | RIPRAP (STONE PROTECTION)(18 IN) | CY | 157.000 | 150.00 | 1 2 3 4 5 6 | 210.000 160.000 165.000 165.000 390.000 473.000 |
| 4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 80.000 | 450.00 | 1 2 3 4 5 6 | 440.000 560.000 645.000 550.000 640.000 1,150.000 |
| 4386001 | CLEANING AND SEALING EXISTING JOINTS | LF | 1,152.000 | 22.00 | 1 2 3 4 5 6 | 20.000 20.000 33.600 55.000 42.000 33.000 |
| 4506023 | RAIL (TY SSTR) | LF | 283.000 | 50.00 | 1 2 3 4 5 6 | 63.000 130.000 153.500 185.000 240.000 268.000 |
| 4516004 | RETROFIT RAIL (TY T131RC) | LF | 310.000 | 175.00 | 1 2 3 4 5 6 | 145.000 170.000 174.000 165.000 210.000 246.000 |
| 5006001 | MOBILIZATION | LS | 1.000 | 27,000.00 | 1 2 3 4 5 6 | 35,000.000 35,000.000 9,845.000 40,000.000 40,000.000 33,500.000 |
| 5026001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 2.000 | 3,500.00 | 1 2 3 4 5 6 | 2,500.000 4,700.000 21,445.000 15,000.000 4,000.000 7,000.000 |
| 5406001 | MTL W-BEAM GD FEN (TIM POST) | LF | 1,147.000 | 22.00 | 1 2 3 4 5 6 | 19.000 22.000 25.000 18.500 28.000 22.400 |
| 5406002 | MTL W-BEAM GD FEN (STEEL POST) | LF | 300.000 | 25.00 | 1 2 3 4 5 6 | 43.000 48.000 48.000 35.000 35.000 74.000 |
| 5406006 | MTL BEAM GD FEN TRANS (THRIE-BEAM) | EA | 8.000 | 1,786.74 | 1 2 3 4 5 6 | 2,300.000 2,500.000 2,500.000 1,850.000 2,100.000 1,675.000 |
| 5406016 | DOWNSTREAM ANCHOR TERMINAL SECTION | EA | 2.000 | 1,250.00 | 1 2 3 4 5 6 | 1,900.000 1,100.000 1,020.000 1,850.000 1,300.000 1,230.000 |
| 5426001 | REMOVE METAL BEAM GUARD FENCE | LF | 2,539.000 | 2.75 | 1 2 3 4 5 6 | 7.500 2.000 4.800 3.000 5.000 5.650 |
| 5426002 | REMOVE TERMINAL ANCHOR SECTION | EA | 12.000 | 150.00 | 1 2 3 4 5 6 | 215.000 75.000 190.000 500.000 300.000 85.000 |
| 5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 12.000 | 2,500.00 | 1 2 3 4 5 6 | 2,350.000 2,750.000 1,950.000 2,500.000 2,800.000 2,400.000 |
| 5446002 | GUARDRAIL END TREATMENT (MOVE & RESET) | EA | 1.000 | 2,330.00 | 1 2 3 4 5 6 | 1,100.000 425.000 1,680.000 1,500.000 750.000 1,565.000 |
| 6586061 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 | EA | 29.000 | 25.00 | 1 2 3 4 5 6 | 24.000 12.000 25.000 100.000 200.000 25.000 |
| 7206003 | SPALLING REPAIR (POLYMERIC) (SEMIRIGID) | GAL | 81.000 | 100.00 | 1 2 3 4 5 6 | 150.000 100.000 178.400 20.000 75.000 240.000 |
| 7806001 | CNC CRACK REPAIR (DISCRETE)(GRAVITY) | LF | 3.000 | 70.00 | 1 2 3 4 5 6 | 170.000 360.000 274.000 1,000.000 250.000 130.000 |
| 60016002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 2.000 | 7,900.00 | 1 2 3 4 5 6 | 1,900.000 4,200.000 6,500.000 3,500.000 4,000.000 6,600.000 |