TABULATION OF BIDS HWY JOB CTY DIV TEXAS DEPARTMENT OF TRANSPORTATION, AUSTIN UA 90 3033 143 48 COUNTY LAVACA CONTROL 0446-01-053 PROJECT STP 2022(864)HES LENGTH 5.543 TYPE HAZARD ELIMINATION & SAFETY DATE 08/03/22 CONTRACT NUMBER 08223033 TIME 180 WORKING DAYS CHECK $27,000 LIMITS FROM:FM 3238 TO:COLORADO C/L MISCELLANEOUS COST $1,349,956.15 *****ESTIMATE***** BIDDER 1 $2,404,305.49 HILL COUNTRY BRIDGE, INC. BIDDER 2 $2,960,877.06 HUNTER INDUSTRIES, LTD. A L ITEM CODE UNIT T ITM DES SP ITEM DESCRIPTION UNIT QUANTITY ENG EST BIDDER 1 BIDDER 2 1006002 PREPARING ROW STA 5.000 2,500.00 3,050.000 55,000.000 1046009 REMOVING CONC (RIPRAP) SY 899.000 25.00 11.900 28.620 1326021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 3,446.000 8.00 27.900 43.020 1506002 BLADING HR 40.000 100.00 201.500 152.100 1646001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 17,599.000 0.15 1.040 0.380 1646009 BROADCAST SEED (TEMP) (WARM) SY 4,400.000 0.10 0.600 0.500 1646011 BROADCAST SEED (TEMP) (COOL) SY 4,400.000 0.10 0.600 0.500 1686001 VEGETATIVE WATERING MG 148.090 20.00 53.700 45.990 2476466003 FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS CY 198.000 65.00 448.000 281.690 3106012 PRIME COAT (RC-250) GAL 237.000 4.50 41.600 19.890 4006005 CEM STABIL BKFL CY 353.000 100.00 177.500 173.430 4006006 CUT & RESTORING PAV SY 26.000 30.00 575.000 567.890 4036001 TEMPORARY SPL SHORING SF 816.000 10.00 19.800 92.910 4326002 RIPRAP (CONC)(5 IN) CY 68.000 400.00 781.000 805.200 4326031 RIPRAP (STONE PROTECTION)(12 IN) CY 234.000 120.00 338.750 199.790 4516004 RETROFIT RAIL (TY T131RC) LF 680.000 150.00 221.500 372.870 4606002 CMP (GAL STL 18 IN) LF 52.000 60.00 244.250 61.940 4606003 CMP (GAL STL 24 IN) LF 28.000 70.00 303.250 121.400 4606009 CMP AR (GAL STL DES 2) LF 4.000 70.00 336.000 185.810 4606010 CMP AR (GAL STL DES 3) LF 4.000 80.00 347.000 309.690 4626050002 CONC BOX CULV (5 FT X 2 FT)(EXTEND) LF 32.000 550.00 708.000 743.260 4626053002 CONC BOX CULV (5 FT X 5 FT)(EXTEND) LF 32.000 750.00 895.000 1,052.950 4626056002 CONC BOX CULV (6 FT X 5 FT)(EXTEND) LF 64.000 765.00 844.000 1,114.890 4626057002 CONC BOX CULV (6 FT X 6 FT)(EXTEND) LF 220.000 800.00 991.000 1,176.820 4626059002 CONC BOX CULV (7 FT X 4 FT)(EXTEND) LF 40.000 825.00 1,054.000 1,176.820 4626062002 CONC BOX CULV (7 FT X 7 FT)(EXTEND) LF 32.000 870.00 1,209.000 1,238.760 4646003001 RC PIPE (CL III)(18 IN) LF 156.000 65.00 143.100 74.330 4646005001 RC PIPE (CL III)(24 IN) LF 84.000 75.00 208.250 158.560 4646007001 RC PIPE (CL III)(30 IN) LF 184.000 85.00 228.750 180.860 4646008001 RC PIPE (CL III)(36 IN) LF 156.000 110.00 251.250 247.750 4646009001 RC PIPE (CL III)(42 IN) LF 48.000 175.00 332.750 303.500 4646010001 RC PIPE (CL III)(48 IN) LF 64.000 200.00 345.000 371.630 4666056 HEADWALL (CH - FW - 45) (DIA= 48 IN) EA 2.000 9,500.00 9,740.000 14,865.150 4666168 WINGWALL (FW - S) (HW=7 FT) EA 2.000 10,000.00 14,740.000 14,865.150 4676172 SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C) EA 2.000 7,000.00 9,070.000 9,910.100 4676185 SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C) EA 2.000 9,000.00 19,440.000 14,865.150 4676223 SET (TY I)(S= 6 FT)(HW= 6 FT)(3:1) (C) EA 4.000 10,500.00 10,940.000 13,007.000 4676227 SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C) EA 10.000 11,000.00 16,450.000 16,103.910 4676249 SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C) EA 2.000 11,500.00 21,120.000 17,342.670 4676260 SET (TY I)(S= 7 FT)(HW= 8 FT)(3:1) (C) EA 2.000 12,000.00 34,090.000 29,730.300 4676348 SET (TY II) (18 IN) (CMP) (6: 1) (P) EA 12.000 900.00 1,843.000 1,238.760 4676363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 18.000 1,000.00 2,068.000 1,238.760 4676380 SET (TY II) (24 IN) (CMP) (6: 1) (P) EA 8.000 1,100.00 2,283.000 2,477.520 4676390 SET (TY II) (24 IN) (RCP) (4: 1) (C) EA 4.000 1,150.00 2,640.000 1,858.140 4676395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 2.000 1,200.00 2,628.000 2,477.520 4676419 SET (TY II) (30 IN) (RCP) (4: 1) (C) EA 10.000 1,500.00 2,692.000 3,716.290 4676448 SET (TY II) (36 IN) (RCP) (3: 1) (C) EA 1.000 2,250.00 5,130.000 4,335.670 4676450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 7.000 2,800.00 4,232.000 4,955.050 4676463 SET (TY II) (42 IN) (RCP) (4: 1) (C) EA 3.000 3,500.00 5,650.000 5,574.430 4676477 SET (TY II) (48 IN) (RCP) (4: 1) (C) EA 1.000 4,000.00 10,610.000 6,813.190 4676525 SET (TY II) (DES 2) (CMP) (6: 1) (P) EA 12.000 1,100.00 2,346.000 2,477.520 4676536 SET (TY II) (DES 3) (CMP) (6: 1) (C) EA 2.000 1,200.00 2,304.000 3,716.290 4806001 CLEAN EXIST CULVERTS EA 4.000 500.00 1,827.000 3,096.910 4966042 REMOV STR (SMALL) EA 1.000 400.00 1,794.000 1,858.140 5006001 MOBILIZATION LS 1.000 95,000.00 240,600.000 289,676.440 5026001008 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.000 2,500.00 4,144.000 10,000.000 5066038005 TEMP SEDMT CONT FENCE (INSTALL) LF 300.000 3.00 9.750 4.500 5066039005 TEMP SEDMT CONT FENCE (REMOVE) LF 300.000 1.00 2.370 0.500 5406001001 MTL W-BEAM GD FEN (TIM POST) LF 1,237.500 22.00 28.000 34.810 5406006001 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 1,500.00 1,910.000 2,860.000 5406014001 SHORT RADIUS LF 37.500 40.00 32.000 55.930 5406016001 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 1,100.00 1,400.000 1,589.500 5406020001 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 10.000 95.00 85.000 94.100 5426001 REMOVE METAL BEAM GUARD FENCE LF 1,400.000 2.00 2.000 5.500 5426002 REMOVE TERMINAL ANCHOR SECTION EA 8.000 190.00 250.000 165.000 5446001 GUARDRAIL END TREATMENT (INSTALL) EA 9.000 2,200.00 3,050.000 3,745.500 5606007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 1.000 240.00 801.000 400.000 6586062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 30.000 22.00 23.000 28.000 6586073 INSTL OM ASSM (OM-2Y)(WC)GND(BI) EA 44.000 60.00 139.400 125.000 7526001 TREE TRIMMING MI 0.030 20,000.00 123,300.000 108,000.000 51166001 AMPHIBIAN/REPTILE EXCLUSION FENCE INST LF 24,340.000 2.50 4.170 4.250 51166002 AMPHIBIAN/REPTILE EXCLUSION FENCE REM LF 24,340.000 0.50 1.240 0.500 61856002002 TMA (STATIONARY) DAY 15.000 250.00 551.000 1,034.810