Tabulation of Bids for Project BPM - 646094001

Last Update: Tuesday, August 13, 2024

Bid Tabulations Dashboard

This report will no longer be updated, please access links on the Contract Letting page.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:SMITHLet Date:05/02/24
Type:BRIDGE PREVENTATIVE MAINTENANCESeq No:4016
Time:105 WProject ID:BPM - 646094001
Highway:US0069Contract #:05244016
Length:0.010CCSJ:6460-94-001
Limits: 
From:VARIOUS BRIDGES INCheck:$12,000
To:THE TYLER DISTRICTMisc Cost:
Estimate$578,594.50% Over/UnderCompany
Bidder 1$514,291.68-11.11%RISE UP CONSTRUCTION LLC
Bidder 2$556,567.84-3.81%ICOS MANAGEMENT, LLC
Bidder 3$567,999.99-1.83%RED BARON BUILDING COMPANY, LLC
Bidder 4$670,635.84+15.91%DCC CONSTRUCTION AND SERVICES, L.L.C.
Bidder 5$745,532.00+28.85%GARRET SHIELDS INFRASTRUCTURE
Bidder 6$784,143.00+35.53%BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
Bidder 7$1,821,937.00+214.89%FNH CONSTRUCTION, LLC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006018PREPARING ROW(OPT1)STA2.5003,000.001
2
3
4
5
6
7
3,599.000
5,500.000
500.000
1,000.000
5,000.000
5,000.000
30,000.000
1046028REMOVING CONC (MISC)SY0.50055.001
2
3
4
5
6
7
25.000
1,100.000
1,000.000
250.000
1,000.000
1,000.000
1,000.000
1106002EXCAVATION (CHANNEL)CY67.00050.001
2
3
4
5
6
7
45.000
22.000
20.000
15.000
60.000
100.000
100.000
1326021EMBANKMENT (VEHICLE)(ORD COMP)(TY C)CY440.00035.001
2
3
4
5
6
7
45.000
66.000
25.000
50.000
40.000
100.000
100.000
1646054BOND FBR MTRX SEED (PERM)(RURAL)(SAND)SY1,440.0002.001
2
3
4
5
6
7
2.000
1.000
1.750
5.000
0.500
2.000
2.000
1646056BONDED FBR MTRX SEED (TEMP)(COOL)SY1,440.0002.001
2
3
4
5
6
7
2.000
1.000
1.750
1.000
0.500
2.000
2.000
1686001VEGETATIVE WATERINGMG15.84050.001
2
3
4
5
6
7
2.000
1.000
10.000
1.000
300.000
200.000
50.000
4016001FLOWABLE BACKFILLCY6.000250.001
2
3
4
5
6
7
456.000
880.000
250.000
500.000
1,000.000
650.000
350.000
4036001TEMPORARY SPL SHORINGSF2,241.00050.001
2
3
4
5
6
7
22.000
1.000
25.000
50.000
80.000
50.000
85.000
4326035RIPRAP (STONE PROTECTION)(24 IN)CY258.000250.001
2
3
4
5
6
7
325.000
220.000
275.000
175.000
250.000
400.000
250.000
4666142WINGWALL (FW - 0) (HW=10 FT)EA1.00018,000.001
2
3
4
5
6
7
10,000.000
17,600.000
17,000.000
20,000.000
20,000.000
15,000.000
55,000.000
4666143WINGWALL (FW - 0) (HW=11 FT)EA5.00020,000.001
2
3
4
5
6
7
10,000.000
18,700.000
17,000.000
20,000.000
20,000.000
15,000.000
65,000.000
4666144WINGWALL (FW - 0) (HW=12 FT)EA2.00022,000.001
2
3
4
5
6
7
10,000.000
22,000.000
18,000.000
20,000.000
20,000.000
15,000.000
75,000.000
4666153WINGWALL (FW - 0) (HW=6 FT)EA1.0009,000.001
2
3
4
5
6
7
10,000.000
15,400.000
13,500.000
17,000.000
12,000.000
15,000.000
35,000.000
4666154WINGWALL (FW - 0) (HW=7 FT)EA2.0009,000.001
2
3
4
5
6
7
10,000.000
16,500.000
14,000.000
19,000.000
15,000.000
20,000.000
45,000.000
4666156WINGWALL (FW - 0) (HW=9 FT)EA2.00010,000.001
2
3
4
5
6
7
10,000.000
17,600.000
17,000.000
21,000.000
15,000.000
30,000.000
55,000.000
4666168WINGWALL (FW - S) (HW=7 FT)EA2.0009,000.001
2
3
4
5
6
7
10,000.000
17,600.000
14,500.000
19,000.000
15,000.000
25,000.000
60,000.000
4666210WINGWALL (SW - 0) (HW=7 FT)EA3.0009,000.001
2
3
4
5
6
7
10,000.000
18,700.000
13,800.000
19,000.000
16,000.000
15,000.000
70,000.000
4806001CLEAN EXIST CULVERTSEA2.0001,980.001
2
3
4
5
6
7
1,600.000
11,000.000
2,000.000
5,000.000
5,000.000
15,000.000
5,000.000
4966005REMOV STR (WINGWALL)EA18.0001,200.001
2
3
4
5
6
7
1,269.000
2,750.000
1,200.000
1,200.000
1,500.000
1,000.000
5,000.000
5006001MOBILIZATIONLS1.00054,000.001
2
3
4
5
6
7
50,000.000
17,000.000
93,186.590
50,000.000
40,000.000
78,000.000
160,000.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO7.0003,000.001
2
3
4
5
6
7
5,900.000
1.000
1,500.000
3,000.000
5,000.000
1,500.000
8,500.000
6586064INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2EA21.0005.001
2
3
4
5
6
7
123.000
220.000
50.000
50.000
40.000
65.000
100.000
61856002002TMA (STATIONARY)DAY30.000250.001
2
3
4
5
6
7
1,250.000
275.000
100.000
300.000
1,000.000
250.000
250.000
71456013CEMENT STABILIZED BASE BACKFILLCY1.00050.001
2
3
4
5
6
7
788.000
1,100.000
250.000
500.000
1,000.000
500.000
2,500.000
73296001MAINTENANCE SPEED LIMIT SIGNINGEA11.000500.001
2
3
4
5
6
7
234.000
1,100.000
250.000
1,000.000
100.000
1,500.000