Tabulation of Bids for Project STP 2B24(025)HES
This report will no longer be updated, please access links on the Contract Letting page.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | DALLAS | Let Date: | 05/03/24 |
Type: | INSTALL WRONG WAY DRIVER SYSTEMS AND DMS | Seq No: | 3227 |
Time: | 160 WORKING DAYS | Project ID: | STP 2B24(025)HES |
Highway: | US 75 | Contract #: | 05243227 |
Length: | 3.363 | CCSJ: | 0047-07-245 |
Limits: | |||
From: | VARIOUS LOCATIONS IN | Check: | $54,000 |
To: | DALLAS AND ELLIS COUNTIES | Misc Cost: |
Estimate | $2,711,726.95 | % Over/Under | Company |
Bidder 1 | $2,513,989.44 | -7.29% | SICE, INC. |
Bidder 2 | $3,599,999.98 | +32.76% | HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC |
Bidder 3 | $3,849,004.49 | +41.94% | FLORIDA TRAFFIC CONTROL DEVICES, INC. |
Bidder 4 | $5,158,256.90 | +90.22% | MICA CORPORATION |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1046009 | REMOVING CONC (RIPRAP) | SY | 2.000 | 50.00 | 1 2 3 4 | 73.246 960.000 630.650 2,935.000 |
4166007 | DRILL SHAFT (54 IN) | LF | 87.000 | 850.00 | 1 2 3 4 | 1,035.581 861.150 932.420 845.000 |
4206002001 | CL A CONC (MISC) | CY | 0.500 | 900.00 | 1 2 3 4 | 475.699 5,050.000 17,658.300 9,950.000 |
4326002 | RIPRAP (CONC)(5 IN) | CY | 0.280 | 700.00 | 1 2 3 4 | 577.452 5,112.500 17,910.560 22,400.000 |
4326045 | RIPRAP (MOW STRIP)(4 IN) | CY | 14.150 | 625.00 | 1 2 3 4 | 521.752 952.500 2,774.880 3,705.000 |
5006001 | MOBILIZATION | LS | 1.000 | 230,000.00 | 1 2 3 4 | 208,760.740 350,596.950 174,045.830 424,600.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 8.000 | 22,000.00 | 1 2 3 4 | 12,271.494 36,140.940 36,116.320 61,675.000 |
5066042002 | BIODEG EROSN CONT LOGS (INSTL) (18") | LF | 140.000 | 6.00 | 1 2 3 4 | 3.257 11.130 22.530 48.000 |
5066043002 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 140.000 | 1.00 | 1 2 3 4 | 1.214 8.000 7.390 14.000 |
5406002001 | MTL W-BEAM GD FEN (STEEL POST) | LF | 350.000 | 32.00 | 1 2 3 4 | 38.090 51.630 35.950 38.650 |
5406016001 | DOWNSTREAM ANCHOR TERMINAL SECTION | EA | 3.000 | 1,520.00 | 1 2 3 4 | 1,535.672 1,580.000 1,513.570 1,277.000 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 4.000 | 3,300.00 | 1 2 3 4 | 3,500.605 3,673.750 3,626.260 3,330.000 |
5446003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 1.000 | 330.00 | 1 2 3 4 | 483.676 392.500 315.330 690.000 |
6186023 | CONDT (PVC) (SCH 40) (2") | LF | 1,040.000 | 15.00 | 1 2 3 4 | 32.246 13.620 16.510 30.800 |
6186029 | CONDT (PVC) (SCH 40) (3") | LF | 1,373.000 | 19.50 | 1 2 3 4 | 33.037 17.000 15.320 44.450 |
6186046 | CONDT (PVC) (SCH 80) (2") | LF | 2,325.000 | 19.00 | 1 2 3 4 | 33.831 14.770 18.280 34.550 |
6186047 | CONDT (PVC) (SCH 80) (2") (BORE) | LF | 980.000 | 25.00 | 1 2 3 4 | 39.621 33.060 33.410 63.950 |
6186053 | CONDT (PVC) (SCH 80) (3") | LF | 920.000 | 23.00 | 1 2 3 4 | 39.803 17.200 23.100 46.050 |
6186054 | CONDT (PVC) (SCH 80) (3") (BORE) | LF | 880.000 | 29.00 | 1 2 3 4 | 43.544 35.510 39.740 61.350 |
6186064 | CONDT (RM) (1") | LF | 165.000 | 34.00 | 1 2 3 4 | 26.542 33.560 39.910 116.250 |
6206007 | ELEC CONDR (NO.8) BARE | LF | 1,380.000 | 1.50 | 1 2 3 4 | 1.044 1.470 1.800 3.050 |
6206008 | ELEC CONDR (NO.8) INSULATED | LF | 6,650.000 | 1.75 | 1 2 3 4 | 1.131 1.700 2.080 3.150 |
6206009 | ELEC CONDR (NO.6) BARE | LF | 4,495.000 | 1.95 | 1 2 3 4 | 1.198 1.920 1.790 3.250 |
6206010 | ELEC CONDR (NO.6) INSULATED | LF | 11,809.000 | 2.20 | 1 2 3 4 | 1.182 2.260 2.280 3.500 |
6206011 | ELEC CONDR (NO.4) BARE | LF | 2,570.000 | 3.00 | 1 2 3 4 | 2.128 2.560 2.320 4.200 |
6206012 | ELEC CONDR (NO.4) INSULATED | LF | 8,102.000 | 3.20 | 1 2 3 4 | 2.372 3.020 3.130 4.500 |
6246010 | GROUND BOX TY D (162922)W/APRON | EA | 39.000 | 1,650.00 | 1 2 3 4 | 2,137.720 1,817.500 1,723.170 3,158.000 |
6286047 | ELC SRV TY A 240/480 060(NS)SS(E)TP(O) | EA | 1.000 | 15,000.00 | 1 2 3 4 | 10,886.662 14,718.750 6,162.300 13,105.000 |
6286151 | ELC SRV TY D 120/240 060(NS)SS(N)PS(U) | EA | 3.000 | 7,115.00 | 1 2 3 4 | 10,146.221 9,000.000 8,849.050 12,435.000 |
6286249 | ELC SRV TY D 120/240 100(NS)SS(N)PS(U) | EA | 1.000 | 10,700.00 | 1 2 3 4 | 10,194.588 9,050.000 8,899.510 12,955.000 |
6446004 | IN SM RD SN SUP&AM TY10BWG(1)SA(T) | EA | 7.000 | 895.00 | 1 2 3 4 | 1,118.501 1,070.340 1,425.590 1,475.000 |
6446012 | IN SM RD SN SUP&AM TY10BWG(1)SB(T) | EA | 4.000 | 850.00 | 1 2 3 4 | 1,288.194 1,178.030 1,563.210 1,480.000 |
6446030 | IN SM RD SN SUP&AM TYS80(1)SA(T) | EA | 4.000 | 1,035.00 | 1 2 3 4 | 1,040.310 788.910 1,406.090 1,360.000 |
6446066 | IN SM RD SN SUP&AM (RAIL MOUNT) | EA | 1.000 | 5,300.00 | 1 2 3 4 | 4,637.650 6,425.000 6,259.890 7,485.000 |
6446067 | IN SM RD SN SUP&AM (INST SIGN ONLY) | EA | 1.000 | 375.00 | 1 2 3 4 | 121.326 320.000 778.680 415.000 |
6446076 | REMOVE SM RD SN SUP&AM | EA | 3.000 | 125.00 | 1 2 3 4 | 254.337 240.000 194.670 1,080.000 |
6446078 | REMOVE SM RD SN SUP&AM (SIGN ONLY) | EA | 2.000 | 90.00 | 1 2 3 4 | 90.690 160.000 194.670 200.000 |
6506028 | INS OH SN SUP(30 FT BAL TEE) | EA | 4.000 | 46,000.00 | 1 2 3 4 | 67,097.495 65,116.250 66,074.710 53,100.000 |
6506029 | INS OH SN SUP(30 FT BAL TEE)(RECT TUBE) | EA | 1.000 | 65,000.00 | 1 2 3 4 | 134,772.066 135,013.750 136,604.480 146,600.000 |
6546006001 | SIGN WALKWAY (48 IN) WITH HNDRL | LF | 184.000 | 860.00 | 1 2 3 4 | 743.245 1,541.940 1,035.630 570.000 |
6586015 | INSTL DEL ASSM (D-SW)SZ (BRF)GF1 | EA | 36.000 | 26.50 | 1 2 3 4 | 29.021 65.000 73.890 55.000 |
6726010 | REFL PAV MRKR TY II-C-R | EA | 294.000 | 5.00 | 1 2 3 4 | 6.349 10.560 6.620 80.300 |
6786033 | PAV SURF PREP FOR MRK (RPM) | EA | 294.000 | 2.00 | 1 2 3 4 | 1.838 3.500 1.920 20.300 |
6876001 | PED POLE ASSEMBLY | EA | 24.000 | 3,500.00 | 1 2 3 4 | 2,162.868 3,787.500 4,238.940 4,890.000 |
6906009 | REMOVAL OF CABLES | LF | 1,391.000 | 2.00 | 1 2 3 4 | 2.427 0.800 1.020 1.500 |
60006098 | INSTALL CIRCUIT BREAKER | EA | 4.000 | 625.00 | 1 2 3 4 | 802.419 800.000 241.400 618.000 |
60016001 | PORTABLE CHANGEABLE MESSAGE SIGN | DAY | 120.000 | 130.00 | 1 2 3 4 | 270.260 241.250 171.200 587.000 |
60046031 | ITS COM CBL (ETHERNET) | LF | 400.000 | 8.00 | 1 2 3 4 | 5.031 8.250 1.710 15.500 |
60076010 | FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER) | LF | 21,466.000 | 5.00 | 1 2 3 4 | 2.564 2.840 5.770 3.950 |
60076095 | FIBER OPTIC PATCH PANEL (6 POSITION) | EA | 9.000 | 1,500.00 | 1 2 3 4 | 1,632.407 1,767.500 1,824.320 1,665.000 |
60076102 | RELOCATE FIBER OPTIC CABLE | LF | 127.000 | 18.50 | 1 2 3 4 | 12.516 20.940 8.980 209.000 |
60276003 | CONDUIT (PREPARE) | LF | 20,065.000 | 4.25 | 1 2 3 4 | 1.042 7.560 1.330 8.730 |
60276008 | GROUND BOX (PREPARE) | EA | 60.000 | 935.00 | 1 2 3 4 | 967.352 667.500 339.910 955.000 |
60286002 | INSTALL DMS (FOUNDATION MTD CABINET) | EA | 13.000 | 15,000.00 | 1 2 3 4 | 8,408.806 17,475.000 13,736.550 80,235.000 |
60936010 | REMOVE EXIST FIB OPT DMS SYS(TY-2) | EA | 7.000 | 4,000.00 | 1 2 3 4 | 6,428.908 7,650.000 4,921.620 13,755.000 |
61236001 | ETHERNET SWITCH (INSTALL ONLY) | EA | 23.000 | 690.00 | 1 2 3 4 | 133.094 480.000 1,137.640 2,332.000 |
61856002002 | TMA (STATIONARY) | DAY | 120.000 | 215.00 | 1 2 3 4 | 500.206 161.250 171.200 782.000 |
64146001 | WIRELESS WWD SYSTEM | EA | 11.000 | 60,000.00 | 1 2 3 4 | 47,935.493 69,011.250 60,338.740 69,135.000 |
64146002 | WWD LED SIGNS | EA | 22.000 | 2,500.00 | 1 2 3 4 | 1,643.507 1,993.750 36,710.320 2,990.000 |
64146004 | WWD CELLULAR MODEM | EA | 7.000 | 1,500.00 | 1 2 3 4 | 2,060.576 7,975.000 6,954.500 6,035.000 |
64146005 | WWD SOLAR POWER SYSTEM | EA | 7.000 | 6,000.00 | 1 2 3 4 | 1,100.252 27,106.250 18,087.590 21,335.000 |