Tabulation of Bids for Project BR 2022(836)
This report will no longer be updated, please access links on the Contract Letting page.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | HARDIN | Let Date: | 05/03/24 |
Type: | BRIDGE REPLACEMENT | Seq No: | 3232 |
Time: | 234 WORKING DAYS | Project ID: | BR 2022(836) |
Highway: | CR | Contract #: | 05243232 |
Length: | 0.000 | CCSJ: | 0920-03-082 |
Limits: | |||
From: | W.PINESHADOWS @ CLEMMONS GULLY | Check: | $56,000 |
To: | STR# 201010AA1065001 | Misc Cost: |
Estimate | $2,807,681.19 | % Over/Under | Company |
Bidder 1 | $3,831,475.49 | +36.46% | TEXAS MATERIALS GROUP, INC. |
Bidder 2 | $4,152,670.71 | +47.90% | C. E. BARKER, LTD. |
Bidder 3 | $4,665,503.97 | +66.17% | PROJECT ALLIED RESOURCES, LLC |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006002 | PREPARING ROW | STA | 21.900 | 2,000.00 | 1 2 3 | 2,900.000 9,000.000 2,430.000 |
1046030 | REMOVING CONC (PILE ENCASEMENT) | CY | 5.000 | 800.00 | 1 2 3 | 1,575.000 6,842.500 348.000 |
1056046 | REMOVING STAB BASE & ASPH PAV (0"-10") | SY | 1,361.000 | 4.00 | 1 2 3 | 16.000 9.130 31.600 |
1106001 | EXCAVATION (ROADWAY) | CY | 788.000 | 15.00 | 1 2 3 | 18.000 45.750 63.000 |
1106002 | EXCAVATION (CHANNEL) | CY | 483.000 | 20.00 | 1 2 3 | 45.000 55.130 76.000 |
1126001 | SUBGRADE WIDENING (ORD COMP) | STA | 10.500 | 380.00 | 1 2 3 | 1,902.000 513.190 2,680.000 |
1326005 | EMBANKMENT (FINAL)(ORD COMP)(TY C) | CY | 1,416.000 | 20.00 | 1 2 3 | 55.000 55.130 70.000 |
1646001 | BROADCAST SEED (PERM) (RURAL) (SANDY) | SY | 1,213.000 | 1.00 | 1 2 3 | 1.050 1.410 3.560 |
1646009 | BROADCAST SEED (TEMP) (WARM) | SY | 3,211.000 | 0.25 | 1 2 3 | 1.050 0.590 0.500 |
1646011 | BROADCAST SEED (TEMP) (COOL) | SY | 3,211.000 | 0.25 | 1 2 3 | 1.050 0.570 0.510 |
1646021 | CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) | SY | 5,209.000 | 2.00 | 1 2 3 | 1.050 0.940 3.130 |
1686001 | VEGETATIVE WATERING | MG | 54.000 | 30.00 | 1 2 3 | 150.000 87.980 104.000 |
1696004 | SOIL RETENTION BLANKETS (CL 1) (TY D) | SY | 3,198.000 | 3.35 | 1 2 3 | 2.000 3.280 5.300 |
2166001 | PROOF ROLLING | HR | 50.000 | 110.00 | 1 2 3 | 447.000 117.300 238.000 |
2476041005 | FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) | CY | 603.000 | 175.00 | 1 2 3 | 162.000 375.360 197.000 |
3106005 | PRIME COAT (AE-P) | GAL | 332.000 | 7.50 | 1 2 3 | 16.250 12.900 40.100 |
4006005 | CEM STABIL BKFL | CY | 234.000 | 140.00 | 1 2 3 | 265.000 175.950 643.000 |
4166001 | DRILL SHAFT (18 IN) | LF | 220.000 | 150.00 | 1 2 3 | 335.000 233.790 244.000 |
4166002 | DRILL SHAFT (24 IN) | LF | 1,095.000 | 220.00 | 1 2 3 | 369.000 263.120 330.000 |
4166004 | DRILL SHAFT (36 IN) | LF | 330.000 | 350.00 | 1 2 3 | 960.000 321.770 554.000 |
4206013001 | CL C CONC (ABUT) | CY | 78.000 | 1,300.00 | 1 2 3 | 2,359.000 1,486.570 2,890.000 |
4206029001 | CL C CONC (CAP) | CY | 13.800 | 1,900.00 | 1 2 3 | 2,228.000 2,548.130 3,760.000 |
4206037001 | CL C CONC (COLUMN) | CY | 8.300 | 1,800.00 | 1 2 3 | 3,730.000 2,311.580 3,760.000 |
4206066001 | CL C CONC (RAIL FOUNDATION) | CY | 24.000 | 600.00 | 1 2 3 | 2,575.000 835.550 1,310.000 |
4206158001 | CL C CONC(PILE ENCASEMENT) | LF | 20.000 | 1,200.00 | 1 2 3 | 1,785.000 2,346.000 1,110.000 |
4206222001 | CL C CONC(PILE ENCASEMENT)(UNDERWATER) | LF | 40.000 | 1,200.00 | 1 2 3 | 1,575.000 6,451.000 1,110.000 |
4226001 | REINF CONC SLAB | SF | 1,560.000 | 35.00 | 1 2 3 | 49.000 30.050 47.800 |
4226007 | REINF CONC SLAB (SLAB BEAM) | SF | 3,900.000 | 20.00 | 1 2 3 | 36.240 34.460 47.800 |
4226015 | APPROACH SLAB | CY | 135.000 | 750.00 | 1 2 3 | 580.000 794.120 1,340.000 |
4256010001 | PRESTR CONC SLAB BEAM (5SB12) | LF | 492.420 | 180.00 | 1 2 3 | 244.000 341.140 406.000 |
4256012001 | PRESTR CONC SLAB BEAM (5SB15) | LF | 247.500 | 290.00 | 1 2 3 | 340.000 341.140 405.000 |
4256035001 | PRESTR CONC GIRDER (TX28) | LF | 237.690 | 200.00 | 1 2 3 | 279.000 345.920 503.000 |
4326031 | RIPRAP (STONE PROTECTION)(12 IN) | CY | 492.000 | 210.00 | 1 2 3 | 255.000 260.020 360.000 |
4326033 | RIPRAP (STONE PROTECTION)(18 IN) | CY | 263.000 | 225.00 | 1 2 3 | 290.000 233.040 414.000 |
4326046 | RIPRAP (MOW STRIP)(5 IN) | CY | 101.000 | 780.00 | 1 2 3 | 630.000 643.590 1,000.000 |
4506006001 | RAIL (TY T223) | LF | 651.000 | 160.00 | 1 2 3 | 195.000 215.760 252.000 |
4546004 | ARMOR JOINT (SEALED) | LF | 162.000 | 180.00 | 1 2 3 | 180.000 117.300 260.000 |
4606001 | CMP (GAL STL 12 IN) | LF | 4.000 | 65.00 | 1 2 3 | 1,330.000 58.650 405.000 |
4646005001 | RC PIPE (CL III)(24 IN) | LF | 172.000 | 150.00 | 1 2 3 | 93.000 108.940 213.000 |
4676316 | SET (TY II) (12 IN) (CMP) (4: 1) (C) | EA | 2.000 | 1,500.00 | 1 2 3 | 5,000.000 1,524.900 2,670.000 |
4676395 | SET (TY II) (24 IN) (RCP) (6: 1) (P) | EA | 8.000 | 2,500.00 | 1 2 3 | 3,950.000 2,475.030 3,340.000 |
4676463 | SET (TY II) (42 IN) (RCP) (4: 1) (C) | EA | 8.000 | 5,750.00 | 1 2 3 | 7,100.000 9,900.120 12,700.000 |
4966009 | REMOV STR (BRIDGE 0 - 99 FT LENGTH) | EA | 3.000 | 35,000.00 | 1 2 3 | 36,000.000 35,190.000 61,000.000 |
4966016 | REMOV STR (PIPE) | EA | 9.000 | 1,000.00 | 1 2 3 | 480.000 1,368.500 1,010.000 |
5006001 | MOBILIZATION | LS | 1.000 | 252,369.89 | 1 2 3 | 379,000.000 390,000.000 335,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 16.000 | 5,600.00 | 1 2 3 | 7,000.000 9,806.280 6,930.000 |
5066001005 | ROCK FILTER DAMS (INSTALL) (TY 1) | LF | 150.000 | 42.05 | 1 2 3 | 49.000 27.370 95.000 |
5066002005 | ROCK FILTER DAMS (INSTALL) (TY 2) | LF | 287.000 | 55.00 | 1 2 3 | 51.000 82.110 97.000 |
5066011005 | ROCK FILTER DAMS (REMOVE) | LF | 437.000 | 15.00 | 1 2 3 | 20.000 20.530 24.600 |
5066033005 | BULLDOZER WORK (EROSION & SEDMT CONT) | HR | 40.000 | 200.00 | 1 2 3 | 230.000 234.600 100.000 |
5066038005 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 3,578.000 | 4.50 | 1 2 3 | 3.150 4.690 9.000 |
5066039005 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 3,578.000 | 2.00 | 1 2 3 | 1.050 1.760 2.140 |
5306005 | DRIVEWAYS (ACP) | SY | 469.000 | 55.00 | 1 2 3 | 40.500 75.070 175.000 |
5406001001 | MTL W-BEAM GD FEN (TIM POST) | LF | 1,300.000 | 28.00 | 1 2 3 | 27.500 29.330 36.900 |
5406006001 | MTL BEAM GD FEN TRANS (THRIE-BEAM) | EA | 9.000 | 2,300.00 | 1 2 3 | 1,900.000 2,111.400 2,600.000 |
5406007001 | MTL BEAM GD FEN TRANS (TL2) | EA | 9.000 | 1,420.00 | 1 2 3 | 1,365.000 1,243.380 1,880.000 |
5406016001 | DOWNSTREAM ANCHOR TERMINAL SECTION | EA | 1.000 | 2,140.00 | 1 2 3 | 1,470.000 1,700.850 2,160.000 |
5446001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 16.000 | 3,280.00 | 1 2 3 | 3,045.000 3,753.600 4,020.000 |
5456006 | CRASH CUSH ATTEN (INSTL)(L)(N)(TL2) | EA | 3.000 | 44,000.00 | 1 2 3 | 26,775.000 30,110.910 37,600.000 |
5526005 | GATE (TY 1) | EA | 1.000 | 750.00 | 1 2 3 | 3,465.000 1,407.600 5,880.000 |
5606011 | MAILBOX INSTALL-S (TWW-POST) TY 4 | EA | 6.000 | 315.00 | 1 2 3 | 309.750 504.390 640.000 |
6446001 | IN SM RD SN SUP&AM TY10BWG(1)SA(P) | EA | 5.000 | 650.00 | 1 2 3 | 735.000 839.870 1,770.000 |
6446076 | REMOVE SM RD SN SUP&AM | EA | 12.000 | 110.00 | 1 2 3 | 210.000 99.710 275.000 |
6586014 | INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) | EA | 25.000 | 30.00 | 1 2 3 | 26.250 21.110 84.000 |
6586062 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | EA | 80.000 | 40.00 | 1 2 3 | 52.500 32.840 63.000 |
6666302007 | RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) | LF | 1,666.000 | 1.00 | 1 2 3 | 2.100 4.690 5.800 |
6666314007 | RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) | LF | 1,514.000 | 3.60 | 1 2 3 | 2.100 4.690 27.800 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 28.000 | 6.00 | 1 2 3 | 15.750 10.560 27.800 |
30766066 | TACK COAT | GAL | 98.000 | 7.50 | 1 2 3 | 44.350 20.810 33.200 |
30766071 | D-GR HMA TY-D PG 64-22 (EXEMPT) | TON | 181.000 | 200.00 | 1 2 3 | 275.750 479.190 529.000 |
42166005 | THERMOPLASTIC PIPE (PP) (42") | LF | 144.000 | 210.00 | 1 2 3 | 144.000 504.390 278.000 |
61856002002 | TMA (STATIONARY) | DAY | 360.000 | 320.00 | 1 2 3 | 303.000 504.390 214.000 |