Tabulation of Bids for Project RMC - 642962001
This report will no longer be updated, please access links on the Contract Letting page.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | TYLER | Let Date: | 05/05/23 |
Type: | ACP OVERLAY | Seq No: | 4204 |
Time: | 47 W | Project ID: | RMC - 642962001 |
Highway: | FM1014 | Contract #: | 05234204 |
Length: | 0.010 | CCSJ: | 6429-62-001 |
Limits: | |||
From: | FROM US69 | Check: | $16,000 |
To: | END OF MAINTENANCE | Misc Cost: |
Estimate | $784,968.00 | % Over/Under | Company |
Bidder 1 | $883,996.42 | +12.62% | TEXAS MATERIALS GROUP, INC. |
Bidder 2 | $909,474.88 | +15.86% | CORNERSTONE PAVING AND CONSTRUCTION, L.L.C. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006002 | PREPARING ROW | STA | 61.540 | 4,000.00 | 1 2 | 1,787.460 3,075.000 |
1106002 | EXCAVATION (CHANNEL) | CY | 53.000 | 30.00 | 1 2 | 88.000 100.000 |
1346004 | BACKFILL (TY A OR B) | STA | 61.540 | 400.00 | 1 2 | 601.930 345.000 |
3516003 | FLEXIBLE PAVEMENT STRUCTURE REPAIR(7") | SY | 100.000 | 100.00 | 1 2 | 299.250 135.000 |
3546021 | PLANE ASPH CONC PAV(0" TO 2") | SY | 141.000 | 13.00 | 1 2 | 49.500 30.000 |
4006005 | CEM STABIL BKFL | CY | 16.000 | 200.00 | 1 2 | 385.000 200.000 |
4006008 | CUT & RESTORE ASPH PAVING | SY | 11.000 | 150.00 | 1 2 | 220.000 250.000 |
4326002 | RIPRAP (CONC)(5 IN) | CY | 22.000 | 500.00 | 1 2 | 1,045.000 1,200.000 |
4676001 | SET (PIPE RUNNER ASSEMBLY) | EA | 2.000 | 4,500.00 | 1 2 | 13,200.000 1.000 |
4676217 | SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C) | EA | 6.000 | 10,000.00 | 1 2 | 19,800.000 15,000.000 |
4676388 | SET (TY II) (24 IN) (RCP) (3: 1) (C) | EA | 14.000 | 1,500.00 | 1 2 | 1,870.000 2,000.000 |
4676395 | SET (TY II) (24 IN) (RCP) (6: 1) (P) | EA | 6.000 | 2,000.00 | 1 2 | 1,870.000 2,500.000 |
5006001 | MOBILIZATION | LS | 1.000 | 71,361.00 | 1 2 | 91,629.500 90,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 4.000 | 5,000.00 | 1 2 | 2,750.000 5,000.000 |
5066041002 | BIODEG EROSN CONT LOGS (INSTL) (12") | LF | 950.000 | 8.00 | 1 2 | 6.050 10.000 |
5066043002 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 950.000 | 3.00 | 1 2 | 2.200 5.000 |
6626111 | WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | EA | 616.000 | 3.00 | 1 2 | 3.500 1.000 |
6666308007 | RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) | LF | 12,308.000 | 0.75 | 1 2 | 0.690 0.630 |
6666320007 | RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) | LF | 12,308.000 | 0.75 | 1 2 | 0.690 0.630 |
6686076 | PREFAB PAV MRK TY C (W) (24") (SLD) | LF | 12.000 | 20.00 | 1 2 | 16.500 15.000 |
6726009 | REFL PAV MRKR TY II-A-A | EA | 161.000 | 7.00 | 1 2 | 5.500 5.000 |
30766025 | D-GR HMA TY-C SAC-B PG70-22 | TON | 1,892.000 | 118.00 | 1 2 | 174.230 188.000 |
30766066 | TACK COAT | GAL | 1,674.000 | 12.50 | 1 2 | 5.380 4.000 |
61856002002 | TMA (STATIONARY) | DAY | 45.000 | 300.00 | 1 2 | 239.880 125.000 |
61856005002 | TMA (MOBILE OPERATION) | DAY | 5.000 | 350.00 | 1 2 | 215.890 250.000 |