TABULATION OF BIDS HWY JOB CTY DIV TEXAS DEPARTMENT OF TRANSPORTATION, AUSTIN SH 73 3004 036 48 COUNTY CHAMBERS CONTROL 0508-03-114 PROJECT F 2B24(200) LENGTH 20.097 TYPE SURFACING/ROADWAY RESTORATION DATE 06/05/24 CONTRACT NUMBER 06243004 TIME 180 WORKING DAYS CHECK $100,000 LIMITS FROM:FM 1663, EAST TO:COUNTY LINE ROAD BRIDGE MISCELLANEOUS COST $29,860,308.88 *****ESTIMATE***** BIDDER 1 $23,585,947.62 TEXAS MATERIALS GROUP, INC. BIDDER 2 $26,048,017.60 VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC A L ITEM CODE UNIT T ITM DES SP ITEM DESCRIPTION UNIT QUANTITY ENG EST BIDDER 1 BIDDER 2 1346004 BACKFILL (TY A OR B) STA 2,122.240 200.00 291.000 373.930 1646023 CELL FBR MLCH SEED(PERM)(RURAL)(CLAY) SY 188,644.000 1.00 0.300 0.450 1686001 VEGETATIVE WATERING MG 1,588.000 35.00 34.000 11.370 3516004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 21,120.000 66.00 73.000 70.640 3546021 PLANE ASPH CONC PAV(0" TO 2") SY 14,358.000 4.15 5.750 4.670 3546041 PLANE ASPH CONC PAV (1.5") SY 21,120.000 2.10 1.800 2.320 5006001 MOBILIZATION LS 1.000 2,000,000.00 1,000,000.000 1,834,860.140 5026001008 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.000 3,500.00 3,600.000 38,473.230 5066041005 BIODEG EROSN CONT LOGS (INSTL) (12") LF 400.000 6.90 6.000 7.430 5066043005 BIODEG EROSN CONT LOGS (REMOVE) LF 400.000 1.00 2.000 1.580 5306004 DRIVEWAYS (CONC) SY 54.000 120.00 390.000 341.040 5306011 INTRSCT, DRVWAYS, & TURNOUT (ACP) SY 8,205.000 70.00 36.500 23.000 5336001 RUMBLE STRIPS (SHOULDER) LF 414,578.000 0.39 0.060 0.170 6446001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 21.000 790.00 530.000 524.100 6446004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 98.000 994.50 550.000 575.590 6446007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 1,006.00 750.000 795.600 6446076 REMOVE SM RD SN SUP&AM EA 120.000 120.00 95.000 73.890 6626109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 9,670.000 1.76 0.750 1.100 6626110 WK ZN PAV MRK SHT TERM (TAB)TY Y EA 350.000 2.10 0.750 2.180 6666017007 REFL PAV MRK TY I (W)6"(DOT)(090MIL) LF 882.000 1.23 1.800 1.760 6666035007 REFL PAV MRK TY I (W)8"(SLD)(090MIL) LF 21,502.000 1.40 0.600 1.110 6666305007 RE PM W/RET REQ TY I (W)6"(BRK)(090MIL) LF 53,080.000 0.70 0.500 0.920 6666308007 RE PM W/RET REQ TY I (W)6"(SLD)(090MIL) LF 206,778.000 0.70 0.450 0.800 6666320007 RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL) LF 212,224.000 0.70 0.450 0.800 6686076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 228.000 16.00 12.500 0.800 6686077 PREFAB PAV MRK TY C (W) (ARROW) EA 129.000 250.00 170.000 277.380 6686085 PREFAB PAV MRK TY C (W) (WORD) EA 129.000 304.00 235.000 413.800 6686092 PREFAB PAV MRK TY C (W) (36")(YLD TRI) EA 336.000 44.00 55.000 58.940 6686108 PREFAB PAV MRK TY C (Y) (24") (SLD) LF 3,160.000 17.00 12.500 18.190 6726009 REFL PAV MRKR TY II-A-A EA 206.000 5.50 4.000 5.630 6726010 REFL PAV MRKR TY II-C-R EA 3,731.000 5.50 4.000 5.120 30766035 D-GR HMA TY-D PG64-22 TON 45,296.000 170.00 125.000 123.240 30766066 TACK COAT GAL 17,097.000 5.00 3.600 8.410 30776033 SP MIXES SP-C SAC-A PG76-22 TON 97,800.000 165.00 137.000 146.500 30776075 TACK COAT GAL 53,345.000 5.00 3.600 3.320 61856002002 TMA (STATIONARY) DAY 151.000 246.00 250.000 292.930 61856005002 TMA (MOBILE OPERATION) DAY 20.000 265.00 430.000 292.930