Tabulation of Bids for Project C 907-20-5

Last Update: Tuesday, August 31, 2021

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:KIMBLELet Date:06/03/21
Type:CONSTRUCT ACCESS ROADS AND PARKINGSeq No:3030
Time:104 WORKING DAYSProject ID:C 907-20-5
Highway:PWContract #:06213030
Length:0.001CCSJ:0907-20-005
Limits: 
From:SOUTH LLANO RIVER STATE PARKCheck:$22,000
To:.Misc Cost:
Estimate$1,099,860.30% Over/UnderCompany
Bidder 1$1,196,977.80+8.83%DIAMOND X CONTRACTING, INC
Bidder 2$1,373,549.72+24.88%ACME BRIDGE COMPANY, INC.
Bidder 3$1,395,577.64+26.89%SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
Bidder 4$1,437,333.83+30.68%REECE ALBERT, INC.
Bidder 5$1,475,464.15+34.15%RELMCO, INC.
Bidder 6$2,486,464.50+126.07%FNH CONSTRUCTION, LLC
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
1006002PREPARING ROWSTA10.0001,500.001
2
3
4
5
6
3,000.000
6,000.000
1,396.460
6,985.000
5,000.000
10,000.000
1046009REMOVING CONC (RIPRAP)SY27.00016.001
2
3
4
5
6
32.000
29.100
39.720
33.400
50.000
100.000
1056109REMOVING STAB BASE & ASPH PAV (8"-19")SY2,656.0007.001
2
3
4
5
6
8.500
7.000
12.610
7.370
10.000
30.000
1106001EXCAVATION (ROADWAY)CY2,843.00012.001
2
3
4
5
6
14.000
25.000
19.590
15.100
25.000
30.000
1326001EMBANKMENT (FINAL)(ORD COMP)(TY A)CY2,998.00040.001
2
3
4
5
6
14.000
60.000
14.020
40.830
20.000
35.000
1616017COMPOST MANUF TOPSOIL (4")SY8,643.0001.201
2
3
4
5
6
4.000
4.400
6.810
5.080
6.500
20.000
1646003BROADCAST SEED (PERM) (RURAL) (CLAY)SY8,643.0000.851
2
3
4
5
6
1.200
0.170
0.190
0.450
0.180
1.000
1686001VEGETATIVE WATERINGMG229.00014.001
2
3
4
5
6
60.000
35.600
62.090
20.540
40.000
100.000
1696003SOIL RETENTION BLANKETS (CL 1) (TY C)SY8,643.0001.001
2
3
4
5
6
2.000
0.870
0.920
2.400
0.950
10.500
2166001PROOF ROLLINGHR8.000100.001
2
3
4
5
6
62.000
63.900
81.570
100.820
100.000
150.000
2476230003FL BS (CMP IN PLACE)(TY A GR 1-2)(8")SY8,890.00012.001
2
3
4
5
6
15.000
18.000
17.700
14.270
25.000
30.000
2606002LIME (HYDRATED LIME (SLURRY))TON166.000190.001
2
3
4
5
6
280.000
275.000
293.850
334.920
200.000
300.000
2606073LIME TRT (SUBGRADE)(8")SY9,930.0002.501
2
3
4
5
6
5.000
3.500
3.100
4.580
6.000
12.000
3406050003D-GR HMA(SQ) TY-C PG70-22TON1,449.000106.001
2
3
4
5
6
108.000
113.000
119.470
152.270
100.000
300.000
3606003CONC PVMT (CONT REINF - CRCP) (9")SY956.00050.001
2
3
4
5
6
145.000
115.000
156.440
147.540
165.000
150.000
4326002RIPRAP (CONC)(5 IN)CY158.000500.001
2
3
4
5
6
482.000
500.000
602.590
628.770
425.000
650.000
4646034001RC PIPE (ARCH)(CL III)(DES 5)LF306.000350.001
2
3
4
5
6
256.000
265.000
373.790
275.270
375.000
600.000
4676557SET (TY II) (DES 5) (CMP) (4: 1) (C)EA10.0006,100.001
2
3
4
5
6
6,600.000
5,270.000
10,069.850
3,259.660
7,351.400
5,000.000
4966004REMOV STR (SET)EA2.000300.001
2
3
4
5
6
402.000
505.000
535.130
333.770
1,800.000
500.000
5006001MOBILIZATIONLS1.000100,000.001
2
3
4
5
6
85,000.000
100,000.000
134,870.890
143,000.000
125,000.000
200,000.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO6.0004,900.001
2
3
4
5
6
1,500.000
6,000.000
1,540.380
1,482.600
5,000.000
8,500.000
5066002005ROCK FILTER DAMS (INSTALL) (TY 2)LF40.00035.001
2
3
4
5
6
66.000
61.600
57.880
50.490
40.000
30.000
5066011005ROCK FILTER DAMS (REMOVE)LF40.00011.001
2
3
4
5
6
11.000
21.200
13.880
23.790
15.000
15.000
5066020005CONSTRUCTION EXITS (INSTALL) (TY 1)SY144.00025.001
2
3
4
5
6
33.000
24.400
28.300
38.320
25.000
40.000
5066024005CONSTRUCTION EXITS (REMOVE)SY144.0008.001
2
3
4
5
6
11.000
2.100
9.050
14.540
15.000
20.000
5066038005TEMP SEDMT CONT FENCE (INSTALL)LF2,460.0003.001
2
3
4
5
6
4.000
3.100
3.380
3.770
3.000
4.000
5066039005TEMP SEDMT CONT FENCE (REMOVE)LF2,460.0000.751
2
3
4
5
6
1.100
1.050
1.150
0.640
1.500
2.000
5316001CONC SIDEWALKS (4")SY789.00058.001
2
3
4
5
6
83.000
60.000
75.430
77.760
60.000
65.000
6446001IN SM RD SN SUP&AM TY10BWG(1)SA(P)EA21.000500.001
2
3
4
5
6
534.000
517.000
547.230
606.360
535.700
850.000
6446004IN SM RD SN SUP&AM TY10BWG(1)SA(T)EA7.000900.001
2
3
4
5
6
620.000
599.000
631.930
702.230
620.400
850.000
6446009IN SM RD SN SUP&AM TY10BWG(1)SB(P)EA5.000700.001
2
3
4
5
6
561.000
543.000
574.730
637.490
563.200
850.000
6586099INSTL OM ASSM (OM-2Z)(WFLX)GNDEA8.00085.001
2
3
4
5
6
102.000
98.700
113.830
115.790
102.300
100.000
6626031WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)EA6.00010.251
2
3
4
5
6
44.000
42.500
63.210
49.800
44.000
500.000
6626034WK ZN PAV MRK NON-REMOV (Y)4"(SLD)LF900.0000.211
2
3
4
5
6
2.200
2.100
2.330
2.490
2.200
2.000
6626050WK ZN PAV MRK REMOV (REFL) TY II-A-AEA68.0005.501
2
3
4
5
6
11.000
10.600
12.700
12.450
11.000
5.000
6626063WK ZN PAV MRK REMOV (W)4"(SLD)LF785.0000.661
2
3
4
5
6
2.200
2.100
2.350
2.490
2.200
2.000
6626092WK ZN PAV MRK REMOV (W)36"(YLD TRI)EA15.00020.001
2
3
4
5
6
54.000
53.100
62.690
62.250
55.000
500.000
6626095WK ZN PAV MRK REMOV (Y)4"(SLD)LF1,810.0001.001
2
3
4
5
6
1.700
1.600
1.710
1.870
1.650
2.000
6666048007REFL PAV MRK TY I (W)24"(SLD)(100MIL)LF144.0006.001
2
3
4
5
6
8.000
7.400
8.500
8.720
7.700
20.000
6666099007REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)EA21.00035.001
2
3
4
5
6
55.000
53.100
60.490
62.250
55.000
500.000
6666138007REFL PAV MRK TY I (Y)8"(SLD)(100MIL)LF354.0000.601
2
3
4
5
6
3.000
2.350
2.750
2.740
2.420
20.000
6666224007PAVEMENT SEALER 4"LF599.0000.201
2
3
4
5
6
1.100
1.050
1.290
1.250
1.100
1.000
6666226007PAVEMENT SEALER 8"LF84.0000.441
2
3
4
5
6
2.200
2.100
3.570
2.490
2.200
6.000
6666300007RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)LF110.0000.341
2
3
4
5
6
1.100
1.050
2.150
1.250
1.100
1.000
6666303007RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)LF3,170.0000.351
2
3
4
5
6
0.800
0.800
0.860
0.930
0.820
1.000
6666312007RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)LF340.0000.261
2
3
4
5
6
1.100
1.050
1.440
1.250
1.100
1.000
6666315007RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)LF2,629.0000.351
2
3
4
5
6
0.800
0.800
0.870
0.930
0.820
1.000
6686055PRE PM TY B(ACC PRK)(BL&WH)(W/BORDR)LGEA3.000210.001
2
3
4
5
6
550.000
531.000
588.430
622.550
550.000
500.000
6726009REFL PAV MRKR TY II-A-AEA60.0002.801
2
3
4
5
6
16.000
15.900
18.420
18.680
16.500
15.000
6776001ELIM EXT PAV MRK & MRKS (4")LF560.0000.501
2
3
4
5
6
2.200
2.100
2.410
2.490
2.200
1.000
6786001PAV SURF PREP FOR MRK (4")LF599.0000.181
2
3
4
5
6
1.100
1.050
1.290
1.250
1.100
1.000
6786004PAV SURF PREP FOR MRK (8")LF84.0000.331
2
3
4
5
6
1.100
1.050
2.470
1.250
1.100
1.000
6906059INSTALL OF PEDESTRIAN RAMPSEA4.0005,500.001
2
3
4
5
6
1,700.000
1,620.000
3,167.970
1,992.150
2,200.000
5,000.000
10046001TREE PROTECTIONEA48.000400.001
2
3
4
5
6
110.000
110.000
177.010
124.510
550.000
500.000
30776075TACK COATGAL533.0003.801
2
3
4
5
6
5.000
5.100
8.360
3.200
8.000
10.000
50576001PRECAST CONCRETE WHEEL STOPSEA23.000240.001
2
3
4
5
6
65.000
189.000
87.510
161.660
500.000
500.000