Tabulation of Bids for Project BR 2019(353)
This report will no longer be updated, please access links on the Contract Letting page.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | TITUS | Let Date: | 06/05/24 |
Type: | BRIDGE REPLACEMENT | Seq No: | 3048 |
Time: | 79 WORKING DAYS | Project ID: | BR 2019(353) |
Highway: | CR | Contract #: | 06243048 |
Length: | 0.066 | CCSJ: | 0919-30-061 |
Limits: | |||
From: | ON CR 4754 AT WILLIAMSON CREEK | Check: | $23,000 |
To: | . | Misc Cost: |
Estimate | $1,131,509.25 | % Over/Under | Company |
Bidder 1 | $723,296.87 | -36.08% | THK CONSTRUCTION LLC |
Bidder 2 | $724,453.00 | -35.97% | TRUE ROADS, LLC |
Bidder 3 | $836,102.00 | -26.11% | SKYLINE BRIDGE LLC |
Bidder 4 | $891,675.00 | -21.20% | HODGES AND SON CONSTRUCTION COMPANY, INC. |
Bidder 5 | $933,484.50 | -17.50% | H. H. HOWARD & SONS, INC. |
Bidder 6 | $946,304.08 | -16.37% | TALBERT COMPANIES LLC |
Bidder 7 | $1,002,584.00 | -11.39% | LONGVIEW BRIDGE AND ROAD, LTD. |
Bidder 8 | $1,065,059.00 | -5.87% | EAST TEXAS BRIDGE, INC. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1006002 | PREPARING ROW | STA | 3.600 | 8,500.00 | 1 2 3 4 5 6 7 8 | 1,500.000 4,000.000 4,000.000 8,000.000 6,500.000 5,750.000 15,000.000 15,000.000 |
1106001 | EXCAVATION (ROADWAY) | CY | 278.000 | 20.00 | 1 2 3 4 5 6 7 8 | 15.000 18.000 20.000 20.000 40.000 36.270 50.000 35.000 |
1106002 | EXCAVATION (CHANNEL) | CY | 934.000 | 60.00 | 1 2 3 4 5 6 7 8 | 15.000 15.000 15.000 15.000 40.000 34.500 50.000 35.000 |
1326005 | EMBANKMENT (FINAL)(ORD COMP)(TY C) | CY | 301.000 | 40.00 | 1 2 3 4 5 6 7 8 | 15.000 40.000 35.000 20.000 40.000 57.500 50.000 45.000 |
1506003 | BLADING | LF | 100.000 | 7.00 | 1 2 3 4 5 6 7 8 | 10.000 18.000 25.000 10.000 75.000 3.880 125.000 25.000 |
1606003 | FURNISHING AND PLACING TOPSOIL (4") | SY | 3,430.000 | 3.60 | 1 2 3 4 5 6 7 8 | 3.000 4.250 4.500 2.000 10.000 5.950 5.000 6.000 |
1646054 | BOND FBR MTRX SEED (PERM)(RURAL)(SAND) | SY | 3,430.000 | 1.50 | 1 2 3 4 5 6 7 8 | 2.660 0.800 1.250 2.000 1.000 0.930 0.900 1.000 |
1646055 | BONDED FBR MTRX SEED (TEMP)(WARM) | SY | 1,715.000 | 1.00 | 1 2 3 4 5 6 7 8 | 0.010 0.800 1.250 2.000 1.000 0.950 0.800 0.900 |
1646056 | BONDED FBR MTRX SEED (TEMP)(COOL) | SY | 1,715.000 | 1.00 | 1 2 3 4 5 6 7 8 | 0.010 0.800 1.250 2.000 1.000 0.920 0.800 0.900 |
1686001 | VEGETATIVE WATERING | MG | 165.000 | 21.25 | 1 2 3 4 5 6 7 8 | 10.000 20.000 1.000 1.000 10.000 57.500 20.000 12.000 |
1696004 | SOIL RETENTION BLANKETS (CL 1) (TY D) | SY | 200.000 | 2.00 | 1 2 3 4 5 6 7 8 | 2.630 2.000 3.000 4.000 5.000 2.240 1.300 3.000 |
2756001 | CEMENT | TON | 14.000 | 330.00 | 1 2 3 4 5 6 7 8 | 300.000 420.000 350.000 350.000 500.000 316.250 350.000 400.000 |
2756019 | CEMENT TREAT (SUBGRADE)(6") | SY | 881.000 | 30.00 | 1 2 3 4 5 6 7 8 | 28.000 10.000 32.000 20.000 12.000 13.800 10.000 12.000 |
3106009 | PRIME COAT (MC-30) | GAL | 222.000 | 13.00 | 1 2 3 4 5 6 7 8 | 30.000 18.000 40.000 10.000 10.000 13.800 9.000 10.000 |
4026001 | TRENCH EXCAVATION PROTECTION | LF | 220.000 | 25.00 | 1 2 3 4 5 6 7 8 | 10.000 15.000 25.000 5.000 25.000 23.000 50.000 50.000 |
4206001001 | CL A CONC (SEAL) | CY | 37.000 | 515.00 | 1 2 3 4 5 6 7 8 | 470.000 600.000 650.000 700.000 600.000 460.000 850.000 800.000 |
4326033 | RIPRAP (STONE PROTECTION)(18 IN) | CY | 305.000 | 225.00 | 1 2 3 4 5 6 7 8 | 177.000 200.000 200.000 190.000 250.000 172.500 230.000 215.000 |
4326039 | BEDDING MATERIAL (6 IN) | CY | 70.000 | 230.00 | 1 2 3 4 5 6 7 8 | 177.000 210.000 150.000 160.000 300.000 201.250 250.000 215.000 |
4626018002 | CONC BOX CULV (7 FT X 7 FT) | LF | 184.000 | 1,200.00 | 1 2 3 4 5 6 7 8 | 980.000 1,100.000 1,500.000 1,600.000 1,500.000 1,220.670 1,500.000 1,800.000 |
4666171 | WINGWALL (PW - 1) (HW=10 FT) | EA | 2.000 | 60,000.00 | 1 2 3 4 5 6 7 8 | 82,000.000 60,000.000 60,000.000 88,000.000 70,000.000 68,425.000 65,000.000 70,000.000 |
4966016 | REMOV STR (PIPE) | EA | 1.000 | 5,000.00 | 1 2 3 4 5 6 7 8 | 5,000.000 6,000.000 5,000.000 5,000.000 5,000.000 1,157.960 7,500.000 15,000.000 |
5006001 | MOBILIZATION | LS | 1.000 | 94,000.00 | 1 2 3 4 5 6 7 8 | 75,000.000 65,000.000 80,000.000 75,000.000 100,000.000 150,150.930 100,000.000 100,000.000 |
5026001008 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 8.000 | 33,500.00 | 1 2 3 4 5 6 7 8 | 780.940 1,000.000 1,500.000 5,200.000 2,000.000 9,775.000 5,000.000 7,500.000 |
5066001005 | ROCK FILTER DAMS (INSTALL) (TY 1) | LF | 100.000 | 50.00 | 1 2 3 4 5 6 7 8 | 50.000 42.000 40.000 1.000 75.000 53.770 45.000 38.000 |
5066011005 | ROCK FILTER DAMS (REMOVE) | LF | 100.000 | 20.00 | 1 2 3 4 5 6 7 8 | 1.000 13.000 10.000 1.000 10.000 18.830 15.000 15.000 |
5066038005 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 1,700.000 | 10.00 | 1 2 3 4 5 6 7 8 | 4.000 4.500 3.500 1.000 6.000 6.600 6.000 4.750 |
5066039005 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 1,700.000 | 2.00 | 1 2 3 4 5 6 7 8 | 1.000 0.650 1.500 1.000 1.000 2.590 1.500 1.000 |
5406001001 | MTL W-BEAM GD FEN (TIM POST) | LF | 125.000 | 30.00 | 1 2 3 4 5 6 7 8 | 26.250 32.500 30.000 26.000 30.000 29.500 33.000 30.000 |
5406016001 | DOWNSTREAM ANCHOR TERMINAL SECTION | EA | 2.000 | 1,800.00 | 1 2 3 4 5 6 7 8 | 1,391.250 1,750.000 1,750.000 1,800.000 1,500.000 1,667.500 1,750.000 1,500.000 |
5406020001 | MTL W - BEAM GD FEN (LOW FILL CULVERT) | LF | 100.000 | 115.00 | 1 2 3 4 5 6 7 8 | 105.000 130.000 125.000 100.000 120.000 115.000 130.000 110.000 |
5446004 | GDRAIL END TRT(INST)(WOOD POST)(TY I) | EA | 2.000 | 2,775.00 | 1 2 3 4 5 6 7 8 | 3,097.500 3,800.000 3,500.000 3,500.000 3,500.000 3,335.000 4,000.000 3,300.000 |
5526003 | WIRE FENCE (TY C) | LF | 875.000 | 40.00 | 1 2 3 4 5 6 7 8 | 25.000 22.000 18.000 20.000 11.500 20.700 30.000 25.000 |
6446076 | REMOVE SM RD SN SUP&AM | EA | 4.000 | 250.00 | 1 2 3 4 5 6 7 8 | 250.000 130.000 250.000 50.000 500.000 230.000 275.000 125.000 |
6586062 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | EA | 6.000 | 54.00 | 1 2 3 4 5 6 7 8 | 47.250 60.000 50.000 50.000 50.000 48.560 60.000 50.000 |
20146002 | ASPHALT-STABILIZED FLEXIBLE BASE | TON | 280.000 | 220.00 | 1 2 3 4 5 6 7 8 | 215.000 245.000 250.000 200.000 200.000 218.500 210.000 265.000 |
61856005002 | TMA (MOBILE OPERATION) | DAY | 2.000 | 500.00 | 1 2 3 4 5 6 7 8 | 400.000 500.000 500.000 200.000 1,000.000 445.570 350.000 400.000 |