TABULATION OF BIDS HWY JOB CTY DIV TEXAS DEPARTMENT OF TRANSPORTATION, AUSTIN SH 66 3204 199 47 COUNTY ROCKWALL CONTROL 0009-04-075 PROJECT F 2024(123) LENGTH 135.229 TYPE SEAL COAT, PAVEMENT MKGS, MILL & INLAY DATE 10/06/23 CONTRACT NUMBER 10233204 TIME 243 WORKING DAYS CHECK $100,000 LIMITS FROM:VARIOUS LOCATIONS TO:IN THE DALLAS DISTRICT MISCELLANEOUS COST $16,886,452.16 *****ESTIMATE***** BIDDER 1 $19,193,970.72 BRANNAN PAVING CO., LTD. BIDDER 2 $20,720,932.55 CK NEWBERRY, LLC A L ITEM CODE UNIT T ITM DES SP ITEM DESCRIPTION UNIT QUANTITY ENG EST BIDDER 1 BIDDER 2 3166255002 AGGR(TY-PL GR-3LW SAC-B) CY 24,731.000 152.61 186.740 195.000 3166434002 AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B) CY 6,840.000 141.34 179.550 185.000 3166454002 ASPH (AC-15P,AC-20-5TR, OR AC-20XP) TON 6,357.810 856.35 869.050 985.000 3546045 PLANE ASPH CONC PAV (2") SY 45,941.000 3.30 5.250 4.000 5006001 MOBILIZATION LS 1.000 1,548,759.76 2,545,500.000 2,000,000.000 5026001008 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 17,500.00 25,000.000 50,000.000 5336003 RUMBLE STRIPS (SHOULDER) ASPHALT LF 1,552.000 1.80 6.750 3.000 5336004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 776.000 1.80 6.750 3.000 5606011 MAILBOX INSTALL-S (TWW-POST) TY 4 EA 58.000 600.00 625.000 325.000 5606012 MAILBOX INSTALL-D (TWW-POST) TY 4 EA 4.000 700.00 715.000 350.000 5606013 MAILBOX INSTALL-M (TWW-POST) TY 4 EA 6.000 1,000.00 975.000 725.000 6626109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 22,464.000 1.75 0.010 0.600 6626111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 92,869.000 1.60 0.010 0.600 6666036008 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 33,762.000 0.90 0.950 1.000 6666042008 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 2,636.000 2.00 6.450 4.000 6666048008 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 8,581.000 5.00 8.950 6.500 6666141008 REFL PAV MRK TY I (Y)12"(SLD)(100MIL) LF 3,820.000 4.00 6.950 6.500 6666171008 REFL PAV MRK TY II (W) 6" (BRK) LF 66,287.000 0.28 0.200 0.250 6666174008 REFL PAV MRK TY II (W) 6" (SLD) LF 2,008,317.000 0.25 0.180 0.200 6666178008 REFL PAV MRK TY II (W) 8" (SLD) LF 35,963.000 0.45 0.300 0.350 6666180008 REFL PAV MRK TY II (W) 12" (SLD) LF 1,610.000 3.25 6.250 2.000 6666182008 REFL PAV MRK TY II (W) 24" (SLD) LF 6,232.000 4.61 8.500 3.000 6666208008 REFL PAV MRK TY II (Y) 6" (BRK) LF 170,310.000 0.24 0.200 0.250 6666210008 REFL PAV MRK TY II (Y) 6" (SLD) LF 1,376,640.000 0.25 0.180 0.200 6666306008 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 30,260.000 0.64 0.580 0.700 6666309008 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 2,531,466.000 0.50 0.540 0.650 6666318008 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 189,260.000 0.64 0.560 0.700 6666321008 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 1,692,418.000 0.50 0.540 0.650 6666445008 RE PROF PM (W)6"(SLD) RAISD PROF ONLY LF 264,692.000 0.28 0.350 1.050 6666446008 RE PROF PM (Y)6"(SLD) RAISD PROF ONLY LF 75,450.000 0.28 0.350 1.050 6666447008 RE PROF PM (Y)6"(BRK) RAISD PROF ONLY LF 5,594.000 0.28 0.400 1.050 6686077 PREFAB PAV MRK TY C (W) (ARROW) EA 200.000 271.00 215.000 200.000 6686078 PREFAB PAV MRK TY C (W) (DBL ARROW) EA 2.000 400.00 385.000 300.000 6686085 PREFAB PAV MRK TY C (W) (WORD) EA 117.000 345.00 250.000 250.000 6686089 PREFAB PAV MRK TY C (W) (RR XING) EA 16.000 800.00 645.000 675.000 6686092 PREFAB PAV MRK TY C (W) (36")(YLD TRI) EA 104.000 40.00 50.000 55.000 6726007 REFL PAV MRKR TY I-C EA 754.000 3.82 4.000 4.000 6726009 REFL PAV MRKR TY II-A-A EA 22,935.000 3.82 4.000 4.000 6726010 REFL PAV MRKR TY II-C-R EA 869.000 4.50 4.000 4.000 6776005 ELIM EXT PAV MRK & MRKS (12") LF 582.000 3.50 4.250 3.000 30776011 SP MIXES SP-C PG64-22 TON 5,053.860 169.00 227.000 260.000 30776075 TACK COAT GAL 2,787.580 4.00 3.500 10.000 61856005002 TMA (MOBILE OPERATION) DAY 190.000 800.00 100.000 0.010