Tabulation of Bids for Project RMC - 636665001
This report will no longer be updated, please access links on the Contract Letting page.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
| Text version of this page | |||
| County: | MOORE | Let Date: | 08/11/20 |
| Type: | ON CALL GUARDRAIL REPAIR | Seq No: | 0401 |
| Time: | 365 CALENDAR DAYS | Project ID: | RMC - 636665001 |
| Highway: | US0087 | Contract #: | 08200401 |
| Length: | 0.000 | CCSJ: | 6366-65-001 |
| Limits: | |||
| From: | SEE PLAN SHEETS | Check: | $6,000 |
| To: | SEE PLAN SHEETS | Misc Cost: | |
| Estimate | $296,730.00 | % Over/Under | Company |
| Bidder 1 | $266,690.00 | -10.12% | HJC FARMS, INC. |
| Bidder 2 | $303,966.00 | +2.44% | DFB CONSTRUCTION, LTD. |
| Bidder 3 | $306,833.75 | +3.41% | BARRICADES UNLIMITED |
| Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
| 5006033 | MOBILIZATION (CALLOUT) | EA | 12.000 | 1,200.00 | 1 2 3 | 1,000.000 2,000.000 2,000.000 |
| 7706001 | REPAIR RAIL ELEMENT (W - BEAM) | LF | 2,200.000 | 20.00 | 1 2 3 | 21.000 17.180 18.000 |
| 7706002 | REPAIR RAIL ELEMENT (THRIE - BEAM) | LF | 35.000 | 25.00 | 1 2 3 | 5.000 25.000 42.500 |
| 7706003 | REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) | LF | 400.000 | 22.00 | 1 2 3 | 5.000 40.000 15.000 |
| 7706006 | RAISE RAIL ELEMENT | LF | 800.000 | 9.00 | 1 2 3 | 2.000 7.000 2.250 |
| 7706012 | REM / REPL TIMBER POST W / O CONC FND | EA | 150.000 | 60.00 | 1 2 3 | 1.000 50.000 61.000 |
| 7706013 | REM / REPL STEEL POST W / O CONC FND | EA | 150.000 | 60.00 | 1 2 3 | 90.000 56.000 89.000 |
| 7706014 | REM / REPL TIMBER POST W / CONC FND | EA | 35.000 | 70.00 | 1 2 3 | 1.000 60.000 63.750 |
| 7706015 | REM / REPL STEEL POST W / CONC FND | EA | 35.000 | 125.00 | 1 2 3 | 60.000 75.000 97.000 |
| 7706016 | REPAIR STEEL POST WITH BASE PLATE | EA | 5.000 | 110.00 | 1 2 3 | 1.000 240.000 248.000 |
| 7706017 | REALIGN POSTS | EA | 150.000 | 10.00 | 1 2 3 | 10.000 12.750 15.000 |
| 7706019 | REMOVE & REPLACE BLOCKOUT | EA | 150.000 | 23.00 | 1 2 3 | 15.500 20.000 18.000 |
| 7706021 | REPLACE SINGLE GDRAIL TERMINAL RAIL | LF | 500.000 | 23.00 | 1 2 3 | 30.000 25.000 20.000 |
| 7706022 | REPLACE SINGLE GDRAIL TERMINAL POST | EA | 80.000 | 130.00 | 1 2 3 | 50.000 80.000 60.000 |
| 7706023 | REPAIR OF TERMINAL ANCHORS POSTS | EA | 50.000 | 35.00 | 1 2 3 | 1.000 40.000 10.000 |
| 7706024 | REPLACE TERMINAL ANCHOR POSTS | EA | 50.000 | 50.00 | 1 2 3 | 1.000 300.000 10.000 |
| 7706025 | REPLACE HINGED TOP SGT STEEL POST | EA | 100.000 | 80.00 | 1 2 3 | 100.000 99.000 95.000 |
| 7706026 | RESET HINGED TOP SGT STL POST | EA | 100.000 | 17.00 | 1 2 3 | 20.000 40.000 11.500 |
| 7706027 | REMOVE GDRAIL END TRT / REPL WITH SGT | EA | 24.000 | 4,000.00 | 1 2 3 | 3,300.000 3,090.000 2,450.000 |
| 7706029 | REM & RESET SGT IMPACT HEAD | EA | 10.000 | 100.00 | 1 2 3 | 1,125.000 200.000 875.000 |
| 7706030 | REPLACE SGT CABLE ASSEMBLY | EA | 20.000 | 80.00 | 1 2 3 | 10.000 81.000 105.000 |
| 7706031 | REPLACE SGT CABLE ANCHOR | EA | 20.000 | 75.00 | 1 2 3 | 10.000 75.000 87.500 |
| 7706032 | REPLACE SGT STRUT | EA | 10.000 | 70.00 | 1 2 3 | 10.000 70.000 105.000 |
| 7706033 | REPLACE SGT OBJECT MARKER | EA | 10.000 | 38.00 | 1 2 3 | 5.000 30.000 38.000 |
| 7706060 | REMOVE AND REPLACE DAT | EA | 10.000 | 380.00 | 1 2 3 | 1,575.000 960.000 1,050.000 |
| 7706061 | REPAIR MTL BM GD FEN(LONG SPAN SYS) | LF | 250.000 | 28.00 | 1 2 3 | 25.000 22.310 250.000 |
| 7746003 | REMOVE AND REPLACE (NARROW REACT 350) | EA | 1.000 | 18,000.00 | 1 2 3 | 21,000.000 23,700.000 25,500.000 |
| 7746010 | REPAIR (REACT) | EA | 1.000 | 300.00 | 1 2 3 | 10,000.000 2,000.000 850.000 |
| 61856002002 | TMA (STATIONARY) | DAY | 100.000 | 250.00 | 1 2 3 | 100.000 220.000 10.000 |