The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Text version of this page
County:POTTERLet Date:09/06/24
Type:INSTALL/REHABILITATE ITSSeq No:3219
Time:182 WORKING DAYSProject ID:F 2B24(460)
Highway:VAContract #:09243219
Length:0.000CCSJ:0904-00-220
Limits: 
From:NEW MEXICO STATE LINECheck:$65,000
To:WHEELER COUNTYMisc Cost:
Estimate$3,248,892.00% Over/UnderCompany
Bidder 1$3,354,582.50+3.25%LIGHT IT UP ELECTRIC
Bidder 2$3,810,990.27+17.30%HIGHWAY INTELLIGENT TRAFFIC SOLUTIONS, LLC
Bidder 3$4,289,229.15+32.02%MICA CORPORATION
Item CodeDescriptionUnitQuantityUnit Est.BidderUnit Bid
4166005DRILL SHAFT (42 IN)LF304.000650.001
2
3
630.000
687.340
835.000
4166023DRILL SHAFT (SIGN MTS) (54 IN)LF105.000831.501
2
3
850.000
849.840
986.000
4326001RIPRAP (CONC)(4 IN)CY42.0001,200.001
2
3
2,100.000
2,126.560
3,600.000
4326045RIPRAP (MOW STRIP)(4 IN)CY91.0001,050.001
2
3
1,450.000
1,736.560
1,500.000
5006001MOBILIZATIONLS1.000300,000.001
2
3
342,000.000
372,774.870
424,225.000
5026001008BARRICADES, SIGNS AND TRAFFIC HANDLINGMO11.00015,000.001
2
3
13,000.000
24,742.160
36,645.000
5406002001MTL W-BEAM GD FEN (STEEL POST)LF1,975.00040.001
2
3
38.000
61.530
38.000
5406006001MTL BEAM GD FEN TRANS (THRIE-BEAM)EA1.0003,250.001
2
3
3,200.000
3,798.130
3,280.000
5406016001DOWNSTREAM ANCHOR TERMINAL SECTIONEA7.0002,372.501
2
3
1,700.000
2,010.630
1,700.000
5446001GUARDRAIL END TREATMENT (INSTALL)EA12.0003,800.001
2
3
3,800.000
4,350.630
3,770.000
6186046CONDT (PVC) (SCH 80) (2")LF9,335.00018.001
2
3
22.000
32.980
25.700
6186047CONDT (PVC) (SCH 80) (2") (BORE)LF1,025.00039.001
2
3
37.000
45.980
46.600
6186053CONDT (PVC) (SCH 80) (3")LF1,880.00030.001
2
3
42.000
52.480
33.500
6186054CONDT (PVC) (SCH 80) (3") (BORE)LF30.00066.001
2
3
69.000
65.480
67.700
6206007ELEC CONDR (NO.8) BARELF1,805.0002.201
2
3
3.250
3.290
3.150
6206008ELEC CONDR (NO.8) INSULATEDLF3,610.0002.701
2
3
3.500
3.480
3.230
6206009ELEC CONDR (NO.6) BARELF1,815.0002.701
2
3
3.750
3.870
3.350
6206010ELEC CONDR (NO.6) INSULATEDLF3,630.0003.001
2
3
4.000
4.260
3.570
6206011ELEC CONDR (NO.4) BARELF1,525.0003.001
2
3
4.500
5.240
3.850
6206012ELEC CONDR (NO.4) INSULATEDLF3,900.0003.451
2
3
4.750
5.690
4.100
6206015ELEC CONDR (NO.2) BARELF4,115.0004.001
2
3
5.250
6.540
5.950
6206016ELEC CONDR (NO.2) INSULATEDLF9,665.0004.601
2
3
6.250
7.060
6.450
6206019ELEC CONDR (NO.1/0) BARELF1,100.0004.501
2
3
8.000
8.750
8.150
6206020ELEC CONDR (NO.1/0) INSULATEDLF3,300.0005.151
2
3
8.500
9.530
8.800
6206025ELEC CONDR (NO.4/0) BARELF1,910.0004.001
2
3
9.750
11.610
16.050
6206026ELEC CONDR (NO.4/0) INSULATEDLF5,730.0004.701
2
3
11.000
12.390
16.200
6246002GROUND BOX TY A (122311)W/APRONEA32.0002,250.001
2
3
1,900.000
2,136.250
3,191.000
6246008GROUND BOX TY C (162911)W/APRONEA9.0001,600.001
2
3
2,200.000
2,428.750
3,406.000
6286220ELC SRV TY D 120/240 100(NS)AL(N)SP(O)EA16.0008,700.001
2
3
11,000.000
8,829.000
12,800.000
6506028INS OH SN SUP(30 FT BAL TEE)EA5.00064,752.501
2
3
55,000.000
66,673.550
66,690.000
6586061INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2EA21.00033.001
2
3
55.000
76.370
56.000
6586062INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)EA11.00033.001
2
3
55.000
76.370
56.000
60016002PORTABLE CHANGEABLE MESSAGE SIGNEA2.00017,000.001
2
3
20,000.000
24,150.880
19,800.000
60106002CCTV FIELD EQUIPMENT (DIGITAL)EA16.00014,750.001
2
3
13,000.000
12,667.700
18,775.000
60106004CCTV MOUNT (POLE)EA16.00010,877.501
2
3
2,500.000
1,302.000
1,421.000
60286001INSTALL DMS (POLE MTD CABINET)EA5.00040,300.001
2
3
20,000.000
17,937.500
78,600.000
60646037001ITS POLE (50 FT)(90 MPH)EA16.00023,737.501
2
3
25,000.000
27,772.600
17,195.000
60646080001ITS POLE MNT CAB (TY 2)(CONF 1)EA16.0007,000.001
2
3
8,500.000
5,897.500
7,650.000
61856002002TMA (STATIONARY)DAY182.000330.001
2
3
500.000
515.300
830.000
62476005INSTALL OF CELLULAR MODEMEA21.0001,400.001
2
3
4,500.000
5,306.250
2,143.000