Tabulation of Bids for Project C 53-17-37
This report will no longer be updated, please access links on the Contract Letting page.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | SCURRY | Let Date: | 09/06/24 |
Type: | RESURFACE ROADWAY | Seq No: | 3226 |
Time: | 51 WORKING DAYS | Project ID: | C 53-17-37 |
Highway: | US 180 | Contract #: | 09243226 |
Length: | 2.659 | CCSJ: | 0053-17-037 |
Limits: | |||
From: | US 84 | Check: | $46,000 |
To: | US 180 | Misc Cost: |
Estimate | $2,299,725.00 | % Over/Under | Company |
Bidder 1 | $2,179,456.14 | -5.23% | RK HALL, LLC |
Bidder 2 | $2,568,167.60 | +11.67% | NOBLES ROAD CONSTRUCTION, INC. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1347002 | BACKFILL (TY B) | STA | 22.370 | 100.00 | 1 2 | 1,622.180 400.000 |
3477002 | TOM-C PG76-22 SAC-B | TON | 7,006.000 | 215.00 | 1 2 | 208.050 232.000 |
3477011 | TACK COAT | GAL | 12,185.000 | 6.00 | 1 2 | 5.270 3.000 |
3517003 | FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") | SY | 1,000.000 | 75.00 | 1 2 | 81.530 100.000 |
3547031 | PLANE ASPH CONC PAV(0" TO 1") | SY | 23,354.000 | 6.50 | 1 2 | 3.800 6.400 |
4327013 | RIPRAP (MOW STRIP)(4 IN) | CY | 37.000 | 815.00 | 1 2 | 862.500 1,000.000 |
4387007 | CLEANING AND SEALING EXIST JOINTS (CL7) | LF | 168.000 | 100.00 | 1 2 | 82.800 200.000 |
5007001 | MOBILIZATION | LS | 1.000 | 200,000.00 | 1 2 | 177,322.650 250,000.000 |
5027001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 3.000 | 20,000.00 | 1 2 | 21,114.780 27,000.000 |
5057001 | TMA (STATIONARY) | DAY | 31.000 | 250.00 | 1 2 | 429.630 500.000 |
5057003 | TMA (MOBILE OPERATION) | DAY | 6.000 | 500.00 | 1 2 | 610.440 1,500.000 |
5407001 | MTL W-BEAM GD FEN (TIM POST) | LF | 450.000 | 40.00 | 1 2 | 30.180 30.000 |
5407005 | MTL BEAM GD FEN TRANS (THRIE-BEAM) | EA | 2.000 | 2,500.00 | 1 2 | 2,701.350 2,600.000 |
5407016 | MTL BM GD FEN TRANS (NON - SYM) | EA | 2.000 | 1,200.00 | 1 2 | 1,242.000 1,200.000 |
5427001 | REMOVE METAL BEAM GUARD FENCE | LF | 450.000 | 30.00 | 1 2 | 1.150 5.000 |
5447001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 4.000 | 3,500.00 | 1 2 | 3,466.100 3,300.000 |
5447003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 4.000 | 30.00 | 1 2 | 230.000 220.000 |
6587019 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | EA | 12.000 | 50.00 | 1 2 | 39.040 460.000 |
6587033 | INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB (BR) | EA | 6.000 | 50.00 | 1 2 | 21.790 135.000 |
6627112 | WK ZN PAV MRK SHT TERM (TAB)TY W | EA | 2,462.000 | 2.00 | 1 2 | 3.470 3.000 |
6627114 | WK ZN PAV MRK SHT TERM (TAB)TY Y-2 | EA | 1,930.000 | 2.00 | 1 2 | 4.080 3.000 |
6667024 | REFL PAV MRK TY I (W)8"(SLD)(100MIL) | LF | 1,860.000 | 1.00 | 1 2 | 1.090 2.200 |
6667408 | REFL PAV MRK TY I (W)6"(BRK)(100MIL) | LF | 8,210.000 | 0.90 | 1 2 | 0.910 1.200 |
6667411 | REFL PAV MRK TY I (W)6"(SLD)(100MIL) | LF | 34,000.000 | 0.90 | 1 2 | 0.830 2.500 |
6667420 | REFL PAV MRK TY I (Y)6"(BRK)(100MIL) | LF | 900.000 | 0.90 | 1 2 | 1.090 2.200 |
6667423 | REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | LF | 37,170.000 | 0.90 | 1 2 | 0.830 1.100 |
6687089 | PREFAB PM TY C (W)(24")(SLD) | LF | 684.000 | 25.00 | 1 2 | 18.400 15.000 |
6687091 | PREFAB PM TY C (W)(ARROW) | EA | 18.000 | 500.00 | 1 2 | 402.500 270.000 |
6687093 | PREFAB PM TY C (W)(DBL ARROW) | EA | 1.000 | 500.00 | 1 2 | 747.500 410.000 |
6687103 | PREFAB PM TY C (W)(WORD) | EA | 9.000 | 650.00 | 1 2 | 0.450 350.000 |
6727002 | REFL PAV MRKR TY I-C | EA | 410.000 | 4.00 | 1 2 | 4.310 5.000 |
6727004 | REFL PAV MRKR TY II-A-A | EA | 446.000 | 6.00 | 1 2 | 4.310 5.000 |