The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | NOLAN | Let Date: | 10/02/24 |
Type: | BRIDGE REPLACEMENT | Seq No: | 3215 |
Time: | 327 WORKING DAYS | Project ID: | BR 2025(073) |
Highway: | SH 70 | Contract #: | 10243215 |
Length: | 0.000 | CCSJ: | 0264-01-046 |
Limits: | |||
From: | AT SWEETWATER CREEK | Check: | $100,000 |
To: | . | Misc Cost: |
Estimate | $7,296,761.78 | % Over/Under | Company |
Bidder 1 | $7,087,905.47 | -2.86% | C. E. BARKER, LTD. |
Bidder 2 | $7,871,593.90 | +7.88% | COPPELL CONSTRUCTION CO., INC. |
Bidder 3 | $7,871,856.11 | +7.88% | ALTUS CONSTRUCTION LLC |
Bidder 4 | $9,641,390.61 | +32.13% | REECE ALBERT, INC. |
Bidder 5 | $11,165,676.00 | +53.02% | HODGES AND SON CONSTRUCTION COMPANY, INC. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1007002 | PREPARING ROW | STA | 2.000 | 6,302.17 | 1 2 3 4 5 | 200,000.000 35,000.000 391,639.510 14,542.700 50,000.000 |
1047006 | REMOV CONC (RIPRAP) | SY | 300.000 | 77.00 | 1 2 3 4 5 | 33.620 31.000 23.130 67.210 30.000 |
1047041 | REMOV CONC (FLUME) | SY | 35.000 | 140.00 | 1 2 3 4 5 | 33.620 100.000 22.140 97.970 30.000 |
1107001 | EXCAV (ROADWAY) | CY | 4,685.000 | 30.00 | 1 2 3 4 5 | 26.110 46.000 19.840 44.270 40.000 |
1327004 | EMBANK (FNL)(DC)(TY B) | CY | 5,199.000 | 55.00 | 1 2 3 4 5 | 26.110 31.000 16.840 34.580 45.000 |
1647018 | HYDRO MULCH SEED (PERM_RURAL_CLAY) | SY | 6,662.000 | 1.53 | 1 2 3 4 5 | 2.370 1.250 1.120 1.070 1.500 |
1647021 | HYDRO MULCH SEED (TEMP_WARM) | SY | 3,331.000 | 0.41 | 1 2 3 4 5 | 2.370 1.200 1.120 1.070 1.000 |
1647022 | HYDRO MULCH SEED (TEMP_COOL) | SY | 3,331.000 | 0.38 | 1 2 3 4 5 | 2.370 1.200 1.120 1.070 1.000 |
1687001 | VEGETATIVE WATERING | TGL | 60.000 | 100.00 | 1 2 3 4 5 | 27.690 30.000 1.180 177.610 1.000 |
2477067 | FL BS (CMP IN PLC)(TY A GR 1-2) (8") | SY | 7,169.000 | 25.19 | 1 2 3 4 5 | 18.990 29.000 17.000 30.470 50.000 |
2507001 | GEOGRID BASE REINFORCEMENT (TYPE 1) | SY | 434.000 | 6.75 | 1 2 3 4 5 | 4.450 60.000 9.350 12.060 5.000 |
3107004 | PRIME COAT (MC-30) | GAL | 1,434.000 | 8.35 | 1 2 3 4 5 | 8.310 11.500 6.200 13.300 15.000 |
3447019 | SP MIXES SP-C PG70-22 | TON | 1,577.000 | 200.00 | 1 2 3 4 5 | 231.420 155.000 263.120 227.430 275.000 |
3447077 | TACK COAT | GAL | 717.000 | 5.85 | 1 2 3 4 5 | 8.310 15.500 5.320 4.720 10.000 |
4007010 | CEM STABIL BKFL | CY | 302.000 | 314.10 | 1 2 3 4 5 | 178.010 350.000 200.910 476.150 300.000 |
4037001 | TEMPORARY SPL SHORING | SF | 150.000 | 46.00 | 1 2 3 4 5 | 4.150 350.000 65.530 735.840 300.000 |
4167005 | DRILL SHAFT (30 IN) | LF | 555.000 | 355.00 | 1 2 3 4 5 | 409.960 300.000 404.410 506.360 350.000 |
4167006 | DRILL SHAFT (36 IN) | LF | 1,993.000 | 387.00 | 1 2 3 4 5 | 457.000 450.000 485.990 557.230 380.000 |
4207013 | CL C CONC (ABUT)(HPC) | CY | 130.800 | 2,500.00 | 1 2 3 4 5 | 1,875.500 1,510.000 1,271.500 2,441.670 2,500.000 |
4207023 | CL C CONC (CAP)(HPC) | CY | 128.300 | 2,500.00 | 1 2 3 4 5 | 1,820.020 1,250.000 2,055.030 3,005.490 2,600.000 |
4207039 | CL C CONC (COLUMN)(HPC) | CY | 73.700 | 2,500.00 | 1 2 3 4 5 | 1,842.590 1,800.000 1,544.600 2,959.160 2,800.000 |
4227002 | REINF CONC SLAB (HPC) | SF | 23,034.000 | 40.00 | 1 2 3 4 5 | 28.960 31.750 41.870 41.730 50.000 |
4227014 | APPROACH SLAB (HPC) | CY | 174.900 | 864.00 | 1 2 3 4 5 | 875.820 875.000 883.790 1,547.100 2,000.000 |
4237019 | RETAINING WALL (DRILL SHAFT) (FASCIA) | SF | 1,307.000 | 63.67 | 1 2 3 4 5 | 34.810 105.000 95.330 185.540 200.000 |
4257001 | PRESTR CONC GIRDER (TX28) | LF | 2,880.500 | 248.50 | 1 2 3 4 5 | 231.390 250.000 232.520 300.450 390.000 |
4287001 | PENETRATING CONCRETE SURFACE TREATMENT | SY | 322.000 | 7.50 | 1 2 3 4 5 | 41.540 35.000 41.360 78.980 8.000 |
4327001 | RIPRAP (CONC)(4 IN) | CY | 56.000 | 800.00 | 1 2 3 4 5 | 519.200 815.000 578.170 1,687.430 800.000 |
4327013 | RIPRAP (MOW STRIP)(4 IN) | CY | 64.000 | 705.00 | 1 2 3 4 5 | 519.200 750.000 557.960 930.170 800.000 |
4327043 | RIPRAP (STONE PROTECTION)(18 IN) | CY | 1,439.000 | 205.00 | 1 2 3 4 5 | 112.490 225.000 156.270 442.980 250.000 |
4507025 | RAIL (TY SSTR)(HPC) | LF | 914.000 | 100.00 | 1 2 3 4 5 | 169.710 180.000 140.980 204.000 200.000 |
4547004 | SEALED EXPANSION JOINT (4 IN) (SEJ - M) | LF | 276.000 | 245.78 | 1 2 3 4 5 | 290.750 350.000 189.650 404.370 250.000 |
4647005 | RC PIPE (CL III)(24 IN) | LF | 50.000 | 135.00 | 1 2 3 4 5 | 142.410 200.000 136.520 161.720 130.000 |
4677327 | SET (TY II) (24 IN) (RCP) (6: 1) (C) | EA | 2.000 | 5,000.00 | 1 2 3 4 5 | 2,076.810 4,500.000 1,803.900 3,502.220 3,000.000 |
4967007 | REMOV STR (PIPE) | LF | 55.000 | 800.00 | 1 2 3 4 5 | 41.540 80.000 15.950 42.520 80.000 |
4967009 | REMOV STR (BRIDGE 0 - 99 FT LENGTH) | EA | 1.000 | 73,000.00 | 1 2 3 4 5 | 61,847.480 160,000.000 61,589.350 137,293.980 600,000.000 |
4967010 | REMOV STR (BRIDGE 100 - 499 FT LENGTH) | EA | 1.000 | 335,000.00 | 1 2 3 4 5 | 135,526.850 550,000.000 134,961.220 205,295.770 850,000.000 |
5007001 | MOBILIZATION | LS | 1.000 | 458,713.39 | 1 2 3 4 5 | 750,000.000 750,000.000 779,342.930 750,929.310 1,000,000.000 |
5027001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 19.000 | 15,000.00 | 1 2 3 4 5 | 5,844.740 20,000.000 16,249.710 27,031.460 21,000.000 |
5037002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 2.000 | 15,618.35 | 1 2 3 4 5 | 36,640.910 25,000.000 11,817.970 6,965.620 50,000.000 |
5057003 | TMA (MOBILE OPERATION) | DAY | 12.000 | 450.00 | 1 2 3 4 5 | 593.380 350.000 236.360 893.040 400.000 |
5067039 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 3,565.000 | 5.50 | 1 2 3 4 5 | 6.230 3.000 3.550 4.260 1.000 |
5067041 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 3,565.000 | 2.25 | 1 2 3 4 5 | 1.190 1.000 1.180 1.420 1.000 |
5067043 | BIODEG EROSN CONT LOGS (INSTL) (8") | LF | 786.000 | 5.00 | 1 2 3 4 5 | 7.420 3.500 5.280 4.740 6.000 |
5067046 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 786.000 | 2.36 | 1 2 3 4 5 | 1.480 1.000 1.330 1.420 1.000 |
5087001 | CONSTRUCTING DETOURS | SY | 540.000 | 50.00 | 1 2 3 4 5 | 178.010 155.000 101.290 103.640 350.000 |
5107003 | ONE-WAY TRAF CONT (PORT TRAF SIG) | MO | 9.000 | 9,000.00 | 1 2 3 4 5 | 6,790.850 12,500.000 13,791.570 2,761.320 16,000.000 |
5127005 | PORT CTB (FUR & INST)(F-SHAPE)(TY 1) | LF | 1,950.000 | 75.00 | 1 2 3 4 5 | 97.310 83.000 80.440 101.560 90.000 |
5127009 | PORT CTB (FUR & INST)(LOW PROF)(TY 1) | LF | 420.000 | 62.82 | 1 2 3 4 5 | 91.380 96.000 86.270 15.450 90.000 |
5127010 | PORT CTB (FUR & INST)(LOW PROF)(TY 2) | LF | 40.000 | 67.89 | 1 2 3 4 5 | 90.190 157.000 99.270 64.900 90.000 |
5127029 | PORT CTB (MOVE)(F-SHAPE)(TY 1) | LF | 3,420.000 | 20.00 | 1 2 3 4 5 | 8.310 12.000 8.860 13.600 30.000 |
5127033 | PORT CTB (MOVE)(LOW PROF)(TY 1) | LF | 200.000 | 9.55 | 1 2 3 4 5 | 8.310 32.000 7.090 32.060 30.000 |
5127034 | PORT CTB (MOVE)(LOW PROF)(TY 2) | LF | 40.000 | 16.85 | 1 2 3 4 5 | 8.310 65.000 8.330 32.060 30.000 |
5127053 | PORT CTB (REMOVE)(F-SHAPE)(TY 1) | LF | 1,950.000 | 22.00 | 1 2 3 4 5 | 20.170 10.000 15.470 17.680 80.000 |
5127057 | PORT CTB (REMOVE)(LOW PROF)(TY 1) | LF | 420.000 | 17.25 | 1 2 3 4 5 | 20.170 22.000 11.520 20.520 80.000 |
5127058 | PORT CTB (REMOVE)(LOW PROF)(TY 2) | LF | 40.000 | 25.00 | 1 2 3 4 5 | 20.170 70.000 14.180 43.930 80.000 |
5337001 | MILL RUMBLE STRIPS (ASPHALT) (SHLDR) | LF | 2,066.000 | 0.65 | 1 2 3 4 5 | 5.140 4.000 1.180 2.490 10.000 |
5337002 | MILL RUMBLE STRIPS (ASPH) (CENTERLINE) | LF | 1,062.000 | 1.36 | 1 2 3 4 5 | 5.140 4.000 1.180 2.490 10.000 |
5407001 | MTL W-BEAM GD FEN (TIM POST) | LF | 425.000 | 29.56 | 1 2 3 4 5 | 32.040 23.000 23.800 83.150 25.000 |
5407005 | MTL BEAM GD FEN TRANS (THRIE-BEAM) | EA | 7.000 | 2,746.47 | 1 2 3 4 5 | 2,729.530 1,600.000 319.900 4,054.400 1,800.000 |
5407039 | TL-3 31" SHORT RADIUS (COMPLETE) | EA | 1.000 | 36,500.00 | 1 2 3 4 5 | 35,602.500 22,650.000 19,499.650 47,786.580 25,000.000 |
5427001 | REMOVE METAL BEAM GUARD FENCE | LF | 962.500 | 8.00 | 1 2 3 4 5 | 8.310 7.000 2.650 14.200 2.000 |
5427004 | RM MTL BM GD FENCE TRANS (THRIE-BEAM) | EA | 8.000 | 235.00 | 1 2 3 4 5 | 474.700 400.000 185.540 1,065.080 500.000 |
5447001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 7.000 | 3,615.92 | 1 2 3 4 5 | 3,797.600 3,000.000 2,969.270 6,908.820 3,000.000 |
5447003 | GUARDRAIL END TREATMENT (REMOVE) | EA | 8.000 | 300.00 | 1 2 3 4 5 | 474.700 400.000 227.900 1,065.080 500.000 |
5457002 | CRASH CUSH ATTEN (MOVE & RESET) | EA | 9.000 | 3,850.00 | 1 2 3 4 5 | 2,966.880 2,500.000 1,299.980 1,162.370 5,000.000 |
5457004 | CRASH CUSH ATTEN (REMOVE) | EA | 6.000 | 1,750.00 | 1 2 3 4 5 | 1,186.750 1,000.000 856.800 928.060 2,000.000 |
5457014 | CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) | EA | 6.000 | 10,850.00 | 1 2 3 4 5 | 10,384.060 8,750.000 13,082.490 9,896.030 10,000.000 |
5607002 | MAILBOX INSTALL-S (TWG-POST) TY 2 | EA | 1.000 | 700.00 | 1 2 3 4 5 | 379.760 320.000 378.180 830.770 4,000.000 |
6447004 | IN SM RD SN SUP&AM TY10BWG(1)SA(T) | EA | 2.000 | 898.48 | 1 2 3 4 5 | 949.400 800.000 945.440 1,753.830 2,000.000 |
6447058 | IN SM RD SN SUP&AM TYTWT(1)WS(T) | EA | 4.000 | 680.00 | 1 2 3 4 5 | 1,145.210 965.000 1,140.430 1,753.830 3,000.000 |
6447073 | REMOVE SM RD SN SUP&AM | EA | 2.000 | 165.00 | 1 2 3 4 5 | 160.210 135.000 159.540 230.590 50.000 |
6587013 | INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI) | EA | 14.000 | 50.00 | 1 2 3 4 5 | 14.830 45.000 14.770 26.040 50.000 |
6587019 | INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) | EA | 10.000 | 51.00 | 1 2 3 4 5 | 32.640 45.000 32.500 33.140 50.000 |
6627068 | WK ZN PAV MRK REMOV (W)6"(SLD) | LF | 10,912.000 | 0.90 | 1 2 3 4 5 | 1.780 1.500 1.770 2.130 2.000 |
6627077 | WK ZN PAV MRK REMOV (W)24"(SLD) | LF | 48.000 | 10.55 | 1 2 3 4 5 | 29.670 25.000 29.540 35.500 25.000 |
6627100 | WK ZN PAV MRK REMOV (Y)6"(SLD) | LF | 43,182.000 | 0.75 | 1 2 3 4 5 | 1.780 1.500 1.770 2.130 2.000 |
6667411 | REFL PAV MRK TY I (W)6"(SLD)(100MIL) | LF | 3,114.000 | 1.00 | 1 2 3 4 5 | 5.930 5.000 5.910 7.100 4.000 |
6667423 | REFL PAV MRK TY I (Y)6"(SLD)(100MIL) | LF | 3,114.000 | 1.00 | 1 2 3 4 5 | 5.930 5.000 5.910 7.100 4.000 |
6727004 | REFL PAV MRKR TY II-A-A | EA | 39.000 | 13.00 | 1 2 3 4 5 | 11.870 10.000 11.820 14.200 20.000 |
6777001 | ELIM EXT PM & MRKS (4") | LF | 12,194.000 | 1.05 | 1 2 3 4 5 | 2.670 2.500 2.950 3.200 2.000 |