Tabulation of Bids for Project F 2025(206)
This report will no longer be updated, please access links on the Contract Letting page.
The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | LAMAR | Let Date: | 11/06/24 |
Type: | CONSTRUCT PEDESTRIAN INFRASTRUCTURE | Seq No: | 3022 |
Time: | 275 WORKING DAYS | Project ID: | F 2025(206) |
Highway: | BU 271B | Contract #: | 11243022 |
Length: | 1.535 | CCSJ: | 0221-01-083 |
Limits: | |||
From: | 18TH SE | Check: | $51,000 |
To: | 34TH SE | Misc Cost: |
Estimate | $2,535,515.90 | % Over/Under | Company |
Bidder 1 | $2,222,428.62 | -12.35% | THK CONSTRUCTION LLC |
Bidder 2 | $2,233,650.90 | -11.91% | GARRET SHIELDS INFRASTRUCTURE |
Bidder 3 | $2,357,713.84 | -7.01% | PROJECT ALLIED RESOURCES, LLC |
Bidder 4 | $2,368,610.39 | -6.58% | TI-ZACK CONCRETE, LLC |
Bidder 5 | $2,611,437.51 | +2.99% | RB CONTRACTING, LLC |
Bidder 6 | $3,003,977.46 | +18.48% | STX CIVIL |
Bidder 7 | $3,245,844.60 | +28.02% | FNH CONSTRUCTION, LLC |
Bidder 8 | $3,623,742.78 | +42.92% | C. E. BARKER, LTD. |
Bidder 9 | $4,134,142.33 | +63.05% | SKYLINE BRIDGE LLC |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1007002 | PREPARING ROW | STA | 106.510 | 1,250.00 | 1 2 3 4 5 6 7 8 9 | 700.000 500.000 940.000 110.000 1,000.000 4,000.000 2,000.000 3,400.000 1,000.000 |
1007003 | PREP ROW (TREE REMOVE) (0"-12" DIA) | EA | 26.000 | 625.00 | 1 2 3 4 5 6 7 8 9 | 500.000 500.000 614.000 550.000 780.000 700.000 2,500.000 1,088.140 2,000.000 |
1007005 | PREP ROW (TREE REMOVE) (24"-36" DIA) | EA | 8.000 | 2,000.00 | 1 2 3 4 5 6 7 8 9 | 1,000.000 1,000.000 1,590.000 2,750.000 1,600.000 2,000.000 10,000.000 1,568.200 4,000.000 |
1047011 | REMOV CONC (DRIVEWAYS) | SY | 600.000 | 20.00 | 1 2 3 4 5 6 7 8 9 | 25.000 20.000 24.000 31.920 40.000 50.000 30.000 32.000 25.000 |
1047013 | REMOV CONC (SIDEWALK, RAMP OR SUP) | SY | 600.000 | 20.00 | 1 2 3 4 5 6 7 8 9 | 25.000 20.000 20.800 31.920 40.000 50.000 30.000 41.610 25.000 |
1047046 | REMOV CONC (MISC) | SY | 600.000 | 20.00 | 1 2 3 4 5 6 7 8 9 | 20.000 20.000 24.000 15.960 40.000 50.000 30.000 60.810 20.000 |
1107001 | EXCAV (ROADWAY) | CY | 1,144.530 | 50.00 | 1 2 3 4 5 6 7 8 9 | 20.000 50.000 24.600 83.670 20.000 50.000 50.000 28.800 30.000 |
1327003 | EMBANK (FNL)(OC)(TY B) | CY | 1,837.300 | 75.00 | 1 2 3 4 5 6 7 8 9 | 20.000 60.000 34.400 73.120 40.000 50.000 100.000 54.410 50.000 |
1627002 | BLOCK SODDING | SY | 11,886.000 | 14.00 | 1 2 3 4 5 6 7 8 9 | 5.840 9.000 8.100 7.700 12.000 10.000 10.000 10.880 8.000 |
1687001 | VEGETATIVE WATERING | TGL | 66.562 | 200.00 | 1 2 3 4 5 6 7 8 9 | 20.000 200.000 71.000 1.100 55.000 80.000 50.000 92.950 15.000 |
3417064 | D-GR HMA TY-D PG 64-22 (EXEMPT) | TON | 10.000 | 300.00 | 1 2 3 4 5 6 7 8 9 | 300.000 200.000 352.000 385.000 205.000 1,000.000 500.000 352.450 500.000 |
4007008 | CUT & RESTORE ASPH PAVING | SY | 600.000 | 175.00 | 1 2 3 4 5 6 7 8 9 | 150.000 100.000 124.000 104.500 210.000 250.000 200.000 334.440 150.000 |
4227012 | BRIDGE SIDEWALK | SF | 40.000 | 40.00 | 1 2 3 4 5 6 7 8 9 | 130.000 120.000 353.000 106.860 165.000 225.000 100.000 59.530 800.000 |
4327043 | RIPRAP (STONE PROTECTION)(18 IN) | CY | 137.000 | 110.00 | 1 2 3 4 5 6 7 8 9 | 200.000 300.000 231.000 110.000 200.000 280.000 185.000 249.630 300.000 |
4507062 | RAIL (HANDRAIL)(TY E) | LF | 1,157.000 | 250.00 | 1 2 3 4 5 6 7 8 9 | 136.080 180.000 187.000 143.760 180.000 190.000 185.000 167.300 500.000 |
4627064 | CONC BOX CULV (5 FT X 5 FT)(EXTEND) | LF | 69.000 | 1,200.00 | 1 2 3 4 5 6 7 8 9 | 1,150.000 1,000.000 1,130.000 1,650.000 1,000.000 1,250.000 600.000 1,746.650 3,000.000 |
4627074 | CONC BOX CULV (7 FT X 7 FT)(EXTEND) | LF | 18.000 | 2,000.00 | 1 2 3 4 5 6 7 8 9 | 1,200.000 1,000.000 1,450.000 1,650.000 2,250.000 1,350.000 1,000.000 2,192.150 5,000.000 |
4667177 | WINGWALL (PW - 1) (HW=7 FT) | EA | 1.500 | 30,000.00 | 1 2 3 4 5 6 7 8 9 | 60,000.000 15,000.000 31,100.000 38,500.000 32,000.000 60,000.000 25,000.000 38,404.800 50,000.000 |
4667179 | WINGWALL (PW - 1) (HW=9 FT) | EA | 0.500 | 50,000.00 | 1 2 3 4 5 6 7 8 9 | 80,000.000 40,000.000 42,800.000 55,000.000 50,000.000 80,000.000 65,000.000 65,928.240 75,000.000 |
5007001 | MOBILIZATION | LS | 1.000 | 222,320.00 | 1 2 3 4 5 6 7 8 9 | 200,000.000 200,000.000 227,000.000 226,627.910 240,000.000 235,000.000 300,000.000 329,428.000 250,000.000 |
5027001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 18.000 | 5,000.00 | 1 2 3 4 5 6 7 8 9 | 10,008.360 5,000.000 3,110.000 2,750.000 2,200.000 4,000.000 8,500.000 9,601.200 10,000.000 |
5037002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 2.000 | 7,500.00 | 1 2 3 4 5 6 7 8 9 | 25,000.000 1,000.000 15,200.000 1.100 15,000.000 7,500.000 16,500.000 22,082.760 20,000.000 |
5057001 | TMA (STATIONARY) | DAY | 300.000 | 300.00 | 1 2 3 4 5 6 7 8 9 | 250.000 300.000 202.000 1.100 465.000 250.000 250.000 192.020 500.000 |
5057003 | TMA (MOBILE OPERATION) | DAY | 150.000 | 350.00 | 1 2 3 4 5 6 7 8 9 | 250.000 300.000 101.000 1.100 350.000 150.000 550.000 704.090 500.000 |
5067039 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 60.000 | 20.00 | 1 2 3 4 5 6 7 8 9 | 54.000 6.000 7.300 11.000 8.000 8.000 4.000 6.400 5.000 |
5067041 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 60.000 | 10.00 | 1 2 3 4 5 6 7 8 9 | 27.000 1.000 2.190 1.100 8.000 2.000 2.000 2.560 2.000 |
5067043 | BIODEG EROSN CONT LOGS (INSTL) (8") | LF | 100.000 | 20.00 | 1 2 3 4 5 6 7 8 9 | 10.800 10.000 11.800 11.000 15.000 10.000 18.000 8.000 12.000 |
5067046 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 100.000 | 10.00 | 1 2 3 4 5 6 7 8 9 | 10.800 1.000 5.400 1.100 15.000 2.000 9.000 2.880 6.000 |
5307006 | DRIVEWAYS (CONC) | SY | 1,685.000 | 105.00 | 1 2 3 4 5 6 7 8 9 | 100.000 120.000 118.000 116.250 120.000 135.000 95.000 132.450 250.000 |
5307010 | DRIVEWAYS (ACP) | SY | 710.000 | 75.00 | 1 2 3 4 5 6 7 8 9 | 90.000 100.000 62.000 99.000 95.000 90.000 55.000 290.240 150.000 |
5317002 | CONC SIDEWALKS (5") | SY | 6,037.000 | 80.00 | 1 2 3 4 5 6 7 8 9 | 90.000 90.000 104.000 110.620 107.000 95.000 65.000 147.070 100.000 |
5317008 | CURB RAMPS (TY 5) | EA | 1.000 | 3,400.00 | 1 2 3 4 5 6 7 8 9 | 3,500.000 3,000.000 3,510.000 2,326.310 3,500.000 5,000.000 3,250.000 3,291.840 10,000.000 |
5317010 | CURB RAMPS (TY 7) | EA | 22.000 | 2,800.00 | 1 2 3 4 5 6 7 8 9 | 3,500.000 3,000.000 3,510.000 2,326.310 3,300.000 4,000.000 3,250.000 2,880.360 15,000.000 |
5317026 | CONCRETE SIDEWALK (RETAINING WALL) | CY | 126.590 | 700.00 | 1 2 3 4 5 6 7 8 9 | 150.000 500.000 961.000 1,485.880 700.000 900.000 5,000.000 576.070 2,500.000 |
6447065 | RELOCATE SM RD SN SUP&AM TY 10BWG | EA | 23.000 | 600.00 | 1 2 3 4 5 6 7 8 9 | 621.000 500.000 727.000 495.000 750.000 750.000 1,100.000 761.700 1,500.000 |
6447067 | RELOCATE SM RD SN SUP&AM TY S80 | EA | 1.000 | 700.00 | 1 2 3 4 5 6 7 8 9 | 696.600 500.000 1,130.000 495.000 750.000 750.000 1,000.000 761.700 2,000.000 |
6587058 | INSTL OM ASSM (OM-2Z)(WFLX)GND | EA | 8.000 | 100.00 | 1 2 3 4 5 6 7 8 9 | 78.300 80.000 94.000 495.000 60.000 200.000 100.000 70.410 200.000 |