The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.
Text version of this page | |||
County: | JACK | Let Date: | 11/06/24 |
Type: | BRIDGE REPLACEMENT | Seq No: | 3029 |
Time: | 85 WORKING DAYS | Project ID: | BR 2024(090) |
Highway: | CR | Contract #: | 11243029 |
Length: | 0.000 | CCSJ: | 0902-40-032 |
Limits: | |||
From: | OVER TRIB OF CROOKED CREEK | Check: | $16,000 |
To: | . | Misc Cost: |
Estimate | $811,642.89 | % Over/Under | Company |
Bidder 1 | $788,118.19 | -2.90% | YOKO EXCAVATING, LLC |
Bidder 2 | $805,165.00 | -0.80% | SKYLINE BRIDGE LLC |
Bidder 3 | $1,019,140.50 | +25.57% | COPPELL CONSTRUCTION CO., INC. |
Bidder 4 | $1,076,073.00 | +32.58% | HODGES AND SON CONSTRUCTION COMPANY, INC. |
Bidder 5 | $1,112,092.70 | +37.02% | STX CIVIL |
Bidder 6 | $1,245,348.00 | +53.44% | EARTH BUILDERS, L.P. |
Item Code | Description | Unit | Quantity | Unit Est. | Bidder | Unit Bid |
1007002 | PREPARING ROW | STA | 5.500 | 7,000.00 | 1 2 3 4 5 6 | 1,691.946 3,500.000 8,000.000 9,000.000 3,000.000 25,000.000 |
1057008 | RMV (8"-12") TRT/UNTRT BASE & ASPH PAV | SY | 1,071.000 | 19.00 | 1 2 3 4 5 6 | 28.777 15.000 30.000 15.000 20.000 25.000 |
1107001 | EXCAV (ROADWAY) | CY | 52.000 | 42.00 | 1 2 3 4 5 6 | 23.797 25.000 94.000 80.000 100.000 40.000 |
1327004 | EMBANK (FNL)(DC)(TY B) | CY | 1,053.000 | 20.00 | 1 2 3 4 5 6 | 65.187 39.000 52.000 50.000 100.000 50.000 |
1617002 | COMPOST MANUF TOPSOIL (4") | SY | 994.000 | 2.75 | 1 2 3 4 5 6 | 12.742 10.000 8.000 15.000 4.000 15.000 |
1647017 | HYDRO MULCH SEED (PERM_RURAL_SANDY) | SY | 994.000 | 2.40 | 1 2 3 4 5 6 | 1.455 4.000 3.000 3.000 2.000 4.000 |
1647021 | HYDRO MULCH SEED (TEMP_WARM) | SY | 497.000 | 1.20 | 1 2 3 4 5 6 | 1.532 4.000 3.000 1.000 4.000 4.000 |
1647022 | HYDRO MULCH SEED (TEMP_COOL) | SY | 497.000 | 0.75 | 1 2 3 4 5 6 | 1.223 4.000 3.000 1.000 4.000 4.000 |
1687001 | VEGETATIVE WATERING | TGL | 233.000 | 40.00 | 1 2 3 4 5 6 | 18.267 10.000 40.000 1.000 123.000 50.000 |
2477083 | FL BS (CMP IN PLC)(TY E GR 1-2) (8") | SY | 1,071.000 | 30.00 | 1 2 3 4 5 6 | 23.445 35.000 25.000 50.000 60.000 40.000 |
3167012 | ASPH (CRS-2P) | GAL | 429.000 | 8.05 | 1 2 3 4 5 6 | 8.593 32.000 26.500 28.000 15.000 40.000 |
3167173 | AGGR (TY-B, GR-4)(SAC-B) | CY | 9.000 | 373.00 | 1 2 3 4 5 6 | 247.508 2,000.000 1,550.000 1,800.000 300.000 1,800.000 |
3417043 | D-GR HMA TY-D PG64-22 | TON | 121.000 | 280.00 | 1 2 3 4 5 6 | 280.001 350.000 317.000 315.000 300.000 450.000 |
4007010 | CEM STABIL BKFL | CY | 115.000 | 286.65 | 1 2 3 4 5 6 | 295.799 300.000 325.000 350.000 330.000 450.000 |
4167006 | DRILL SHAFT (36 IN) | LF | 270.000 | 376.22 | 1 2 3 4 5 6 | 405.324 350.000 400.000 260.000 361.910 450.000 |
4207013 | CL C CONC (ABUT)(HPC) | CY | 30.900 | 1,561.16 | 1 2 3 4 5 6 | 2,060.888 1,400.000 1,700.000 2,000.000 2,500.000 2,500.000 |
4227002 | REINF CONC SLAB (HPC) | SF | 1,170.000 | 27.50 | 1 2 3 4 5 6 | 31.632 38.000 45.000 60.000 60.000 45.000 |
4227014 | APPROACH SLAB (HPC) | CY | 38.500 | 770.00 | 1 2 3 4 5 6 | 755.652 875.000 1,100.000 1,800.000 1,000.000 1,500.000 |
4257001 | PRESTR CONC GIRDER (TX28) | LF | 178.000 | 250.00 | 1 2 3 4 5 6 | 329.465 450.000 422.000 375.000 470.000 350.000 |
4277005 | EPOXY WATERPROOF FINISH (TY X) | SF | 306.000 | 26.40 | 1 2 3 4 5 6 | 20.050 20.000 20.000 20.000 20.000 35.000 |
4327013 | RIPRAP (MOW STRIP)(4 IN) | CY | 23.000 | 670.00 | 1 2 3 4 5 6 | 624.713 750.000 1,000.000 700.000 1,000.000 650.000 |
4327045 | RIPRAP (STONE PROTECTION)(24 IN) | CY | 357.000 | 225.00 | 1 2 3 4 5 6 | 162.492 170.000 200.000 300.000 300.000 250.000 |
4507020 | RAIL (TY T631) | LF | 122.000 | 150.00 | 1 2 3 4 5 6 | 89.955 100.000 110.000 90.000 210.000 120.000 |
4547003 | ARMOR JOINT (SEALED) | LF | 44.000 | 150.00 | 1 2 3 4 5 6 | 157.321 175.000 245.000 200.000 300.000 220.000 |
4967009 | REMOV STR (BRIDGE 0 - 99 FT LENGTH) | EA | 1.000 | 35,000.00 | 1 2 3 4 5 6 | 38,661.666 11,000.000 60,000.000 70,000.000 60,000.000 75,000.000 |
5007001 | MOBILIZATION | LS | 1.000 | 80,000.00 | 1 2 3 4 5 6 | 75,066.564 70,000.000 100,000.000 90,000.000 90,000.000 100,000.000 |
5027001 | BARRICADES, SIGNS AND TRAFFIC HANDLING | MO | 4.000 | 2,000.00 | 1 2 3 4 5 6 | 1,536.467 3,000.000 13,500.000 15,000.000 2,500.000 3,500.000 |
5037002 | PORTABLE CHANGEABLE MESSAGE SIGN | EA | 2.000 | 15,000.00 | 1 2 3 4 5 6 | 4,289.498 6,500.000 8,000.000 15,000.000 6,500.000 20,000.000 |
5067002 | ROCK FILTER DAMS (INSTALL) (TY 2) | LF | 68.000 | 50.00 | 1 2 3 4 5 6 | 26.944 50.000 70.000 1.000 85.000 65.000 |
5067011 | ROCK FILTER DAMS (REMOVE) | LF | 68.000 | 50.00 | 1 2 3 4 5 6 | 9.326 10.000 30.000 1.000 35.000 30.000 |
5067020 | CONSTRUCTION EXITS (INSTALL) (TY 1) | SY | 290.000 | 2.50 | 1 2 3 4 5 6 | 20.937 20.000 40.000 1.000 50.000 70.000 |
5067024 | CONSTRUCTION EXITS (REMOVE) | SY | 290.000 | 2.50 | 1 2 3 4 5 6 | 4.814 8.000 13.000 1.000 15.000 8.000 |
5067039 | TEMP SEDMT CONT FENCE (INSTALL) | LF | 803.000 | 4.00 | 1 2 3 4 5 6 | 6.209 4.000 5.000 1.000 6.000 5.000 |
5067041 | TEMP SEDMT CONT FENCE (REMOVE) | LF | 803.000 | 1.00 | 1 2 3 4 5 6 | 2.314 1.500 2.000 1.000 3.000 2.000 |
5067045 | BIODEG EROSN CONT LOGS (INSTL) (18") | LF | 160.000 | 9.32 | 1 2 3 4 5 6 | 7.538 12.000 9.000 8.000 10.000 12.000 |
5067046 | BIODEG EROSN CONT LOGS (REMOVE) | LF | 160.000 | 2.50 | 1 2 3 4 5 6 | 3.483 6.000 2.000 1.000 3.000 2.000 |
5407001 | MTL W-BEAM GD FEN (TIM POST) | LF | 125.000 | 40.00 | 1 2 3 4 5 6 | 29.501 32.000 24.000 26.000 40.000 28.000 |
5407015 | DOWNSTREAM ANCHOR TERMINAL SECTION | EA | 2.000 | 15,000.00 | 1 2 3 4 5 6 | 1,022.060 1,800.000 1,350.000 1,500.000 2,300.000 1,500.000 |
5447001 | GUARDRAIL END TREATMENT (INSTALL) | EA | 2.000 | 3,500.00 | 1 2 3 4 5 6 | 2,668.539 3,800.000 3,000.000 3,000.000 4,200.000 3,200.000 |
6447057 | IN SM RD SN SUP&AM TYTWT(1)WS(P) | EA | 2.000 | 6,000.00 | 1 2 3 4 5 6 | 678.608 1,200.000 675.000 2,000.000 830.000 1,200.000 |
6447073 | REMOVE SM RD SN SUP&AM | EA | 2.000 | 200.00 | 1 2 3 4 5 6 | 134.213 200.000 150.000 50.000 155.000 200.000 |
6587048 | INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2 | EA | 12.000 | 100.00 | 1 2 3 4 5 6 | 48.822 50.000 45.000 50.000 70.000 60.000 |
6667175 | RE PM TY II (W) 6" (SLD) | LF | 992.000 | 0.35 | 1 2 3 4 5 6 | 2.192 10.000 1.500 10.000 2.000 10.000 |
6667211 | RE PM TY II (Y) 6" (BRK) | LF | 123.000 | 0.40 | 1 2 3 4 5 6 | 2.192 10.000 1.500 10.000 2.000 10.000 |
6667411 | REFL PAV MRK TY I (W)6"(SLD)(100MIL) | LF | 170.000 | 0.50 | 1 2 3 4 5 6 | 8.492 10.000 6.750 10.000 10.000 10.000 |
6667420 | REFL PAV MRK TY I (Y)6"(BRK)(100MIL) | LF | 22.000 | 0.50 | 1 2 3 4 5 6 | 8.492 12.000 7.000 10.000 10.000 10.000 |
6727004 | REFL PAV MRKR TY II-A-A | EA | 14.000 | 10.00 | 1 2 3 4 5 6 | 16.576 150.000 10.000 100.000 15.000 100.000 |
6787002 | PAV SURF PREP FOR MRK (6") | LF | 192.000 | 0.60 | 1 2 3 4 5 6 | 3.115 10.000 2.000 10.000 3.000 10.000 |