DBE Construction Report for REBAR SERVICE & SUPPLY CO.
DBE Construction Report for REBAR SERVICE & SUPPLY CO. | ||||
Last Update: Wednesday, September 7, 2005 |
REBAR SERVICE & SUPPLY CO. | Vendor #: | 01805 |
PO BOX 40584 | DBE Certification Status: | CERTIFIED |
FORT WORTH, TX 76140 | Expiration Date: | 10/31/05 |
Phone: (817)572-4450 | Fax: | (817)483-4603 |
Let Date: | 2000-08 | County: | GRAYSON |
CCSJ: | 0045-19-026 | District: | PARIS |
Project ID: | NH 2000(494) | Pct Complete: | 100% |
Commitment Amount: | 139,553.82 | ||
Commitment Work: | FABRICATE REINFORCING STEE | ||
Prime Contractors: | RUSHING PAVING COMPANY, LTD | ||
Let Date: | 2002-02 | County: | GREGG |
CCSJ: | 0138-01-072 | District: | TYLER |
Project ID: | BR 2002(27) | Pct Complete: | 100% |
Commitment Amount: | 152,000.00 | ||
Commitment Work: | FABRICATED REINFORCING STEE | ||
Prime Contractors: | LONGVIEW BRIDGE AND ROAD, LTD | ||
Let Date: | 2002-02 | County: | UPSHUR |
CCSJ: | 0248-05-035 | District: | ATLANTA |
Project ID: | NH 2001(587) | Pct Complete: | 100% |
Commitment Amount: | 0.00 | ||
Commitment Work: | |||
Prime Contractors: | LONGVIEW BRIDGE AND ROAD, LTD | ||
Let Date: | 2002-07 | County: | DONLEY |
CCSJ: | 0042-08-045 | District: | CHILDRESS |
Project ID: | STP 2000(66)TE | Pct Complete: | 0% |
Commitment Amount: | 308,620.00 | ||
Commitment Work: | REINF STEE | ||
Prime Contractors: | SEDALCO, L.P | ||
Let Date: | 2002-12 | County: | BRAZOS |
CCSJ: | 0116-04-086 | District: | BRYAN |
Project ID: | NH 2002(595) | Pct Complete: | 100% |
Commitment Amount: | 123,885.80 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | CONCHO CONSTRUCTION COMPANY, INC | ||
Let Date: | 2003-01 | County: | BELL |
CCSJ: | 0836-02-044 | District: | WACO |
Project ID: | STP 2002(678) | Pct Complete: | 60% |
Commitment Amount: | 91,706.00 | ||
Commitment Work: | SUPPLY REINFORCING STEEL AND WELDED WIRE FABRIC (100% GOAL CREDIT | ||
Prime Contractors: | GAREY CONSTRUCTION LTD KILLEEN CRUSHED STON ELLIS-MCGINNIS CONSTRUCTION CO |
||
Let Date: | 2003-04 | County: | MITCHELL |
CCSJ: | 0966-02-014 | District: | ABILENE |
Project ID: | MG 2002(705) | Pct Complete: | 100% |
Commitment Amount: | 33,198.00 | ||
Commitment Work: | REINFORCING STEEL (BLACK | ||
Prime Contractors: | REECE ALBERT, INC | ||
Let Date: | 2003-04 | County: | MITCHELL |
CCSJ: | 0966-02-014 | District: | ABILENE |
Project ID: | MG 2002(705) | Pct Complete: | 100% |
Commitment Amount: | 255,244.02 | ||
Commitment Work: | CUT & RESTORE PAV, TRENCH EXCAV PROTECTION, DRILL SHAFT, CL C CONC, RIP RAP, RAIL, CONC BOX INLET, WINGWALL, SET TY, REMOV OLD STRUC, CURB RA | ||
Prime Contractors: | REECE ALBERT, INC | ||
Let Date: | 2003-06 | County: | WISE |
CCSJ: | 0134-08-036 | District: | FORT WORTH |
Project ID: | STP 2003(502)RGS | Pct Complete: | 100% |
Commitment Amount: | 14,031.73 | ||
Commitment Work: | SUPPLY REINF STEEL (100% GOAL CREDIT | ||
Prime Contractors: | CONCHO CONSTRUCTION COMPANY, INC | ||
Let Date: | 2003-06 | County: | WISE |
CCSJ: | 0353-01-026 | District: | FORT WORTH |
Project ID: | BR 2003(514) | Pct Complete: | 90% |
Commitment Amount: | 31,467.00 | ||
Commitment Work: | FURNISH REINF STEEL (100% CREDIT | ||
Prime Contractors: | DUININCK BROS, INC | ||
Let Date: | 2003-07 | County: | TARRANT |
CCSJ: | 0081-12-020 | District: | FORT WORTH |
Project ID: | NH 2001(867) | Pct Complete: | 94% |
Commitment Amount: | 272,677.15 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | ORVAL HALL EXCAVATING CO | ||
Let Date: | 2003-08 | County: | DENTON |
CCSJ: | 2054-01-011 | District: | DALLAS |
Project ID: | BR 2003(576) | Pct Complete: | 100% |
Commitment Amount: | 132,319.51 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | ORVAL HALL EXCAVATING CO | ||
Let Date: | 2003-09 | County: | UPSHUR |
CCSJ: | 0647-03-014 | District: | ATLANTA |
Project ID: | BR 2003(483) | Pct Complete: | 100% |
Commitment Amount: | 31,500.00 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | LONGVIEW BRIDGE AND ROAD, LTD | ||
Let Date: | 2003-12 | County: | OLDHAM |
CCSJ: | 0226-02-027 | District: | AMARILLO |
Project ID: | BR 2000(20) | Pct Complete: | 100% |
Commitment Amount: | 325,251.07 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | GILBERT TEXAS CONSTRUCTION, L.P | ||
Let Date: | 2003-12 | County: | GREGG |
CCSJ: | 0138-01-083 | District: | TYLER |
Project ID: | BR 2004(95) | Pct Complete: | 100% |
Commitment Amount: | 0.00 | ||
Commitment Work: | |||
Prime Contractors: | LONGVIEW BRIDGE AND ROAD, LTD | ||
Let Date: | 2004-01 | County: | TAYLOR |
CCSJ: | 0677-01-021 | District: | ABILENE |
Project ID: | STP 2004(99) | Pct Complete: | 100% |
Commitment Amount: | 18,591.83 | ||
Commitment Work: | BLACK REINFORCING STEE | ||
Prime Contractors: | J. H. STRAIN & SONS, INC | ||
Let Date: | 2004-04 | County: | WOOD |
CCSJ: | 0647-01-017 | District: | TYLER |
Project ID: | BR 2002(498) | Pct Complete: | 99% |
Commitment Amount: | 115,302.50 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | L & N BRIDGE, LL | ||
Let Date: | 2004-05 | County: | RUSK |
CCSJ: | 0594-03-018 | District: | TYLER |
Project ID: | BR 2004(415) | Pct Complete: | 42% |
Commitment Amount: | 63,143.20 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | APAC-TEXAS, INC | ||
Let Date: | 2004-05 | County: | LEE |
CCSJ: | 0211-02-021 | District: | AUSTIN |
Project ID: | BR 2004(383) | Pct Complete: | 100% |
Commitment Amount: | 67,455.96 | ||
Commitment Work: | INSTALL REBA | ||
Prime Contractors: | CONCHO CONSTRUCTION COMPANY, INC | ||
Let Date: | 2004-06 | County: | LAMAR |
CCSJ: | 0045-09-074 | District: | PARIS |
Project ID: | STP 2004(451)HES | Pct Complete: | 48% |
Commitment Amount: | 38,762.37 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | APAC-TEXAS, INC | ||
Let Date: | 2004-07 | County: | RUSK |
CCSJ: | 0207-03-022 | District: | TYLER |
Project ID: | STP 2004(546)RGS | Pct Complete: | 78% |
Commitment Amount: | 38,590.54 | ||
Commitment Work: | SUPPLY REINFORCING STEEL & WWF (100% GOAL CREDIT | ||
Prime Contractors: | LONGVIEW BRIDGE AND ROAD, LTD | ||
Let Date: | 2004-07 | County: | PARKER |
CCSJ: | 1468-01-019 | District: | FORT WORTH |
Project ID: | BR 2004(259) | Pct Complete: | 63% |
Commitment Amount: | 162,803.20 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | ELLIS-MCGINNIS CONSTRUCTION CO | ||
Let Date: | 2004-07 | County: | JOHNSON |
CCSJ: | 0902-50-073 | District: | FORT WORTH |
Project ID: | BR 2002(497) | Pct Complete: | 89% |
Commitment Amount: | 49,963.11 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | ORVAL HALL EXCAVATING CO | ||
Let Date: | 2004-08 | County: | DALLAS |
CCSJ: | 0918-45-619 | District: | DALLAS |
Project ID: | CM 2004(616) | Pct Complete: | 100% |
Commitment Amount: | 10,704.00 | ||
Commitment Work: | SUPPLY REINFORCING (100% GOAL CREDIT | ||
Prime Contractors: | REBCON, INC | ||
Let Date: | 2004-08 | County: | HOUSTON |
CCSJ: | 0940-01-015 | District: | LUFKIN |
Project ID: | BR 2004(455) | Pct Complete: | 46% |
Commitment Amount: | 13,280.00 | ||
Commitment Work: | FABRICATE REINFORCING STEE | ||
Prime Contractors: | LONGVIEW BRIDGE AND ROAD, LTD | ||
Let Date: | 2004-08 | County: | HASKELL |
CCSJ: | 0157-09-001 | District: | ABILENE |
Project ID: | NH 2004(515) | Pct Complete: | 37% |
Commitment Amount: | 541,867.25 | ||
Commitment Work: | FURNISH BLACK AND EPOXY REBAR (MANUFACTURER | ||
Prime Contractors: | J. H. STRAIN & SONS, INC | ||
Let Date: | 2004-08 | County: | BURLESON |
CCSJ: | 0116-02-027 | District: | BRYAN |
Project ID: | NH 2004(611) | Pct Complete: | 37% |
Commitment Amount: | 122,049.91 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | YOUNG CONTRACTORS, INC | ||
Let Date: | 2004-08 | County: | SHELBY |
CCSJ: | 0059-05-033 | District: | LUFKIN |
Project ID: | STP 2000(513)RGS | Pct Complete: | 34% |
Commitment Amount: | 64,492.80 | ||
Commitment Work: | SUPPLY FAB REINF STEEL (100% CREDIT) SUPPLY DOWEL BASKET ASSEM. (60% CREDIT) ($7920.00 X 60% $4752 | ||
Prime Contractors: | LONGVIEW BRIDGE AND ROAD, LTD | ||
Let Date: | 2004-09 | County: | RED RIVER |
CCSJ: | 0045-12-058 | District: | PARIS |
Project ID: | BR 2004(682) | Pct Complete: | 67% |
Commitment Amount: | 21,175.00 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | APAC-TEXAS, INC | ||
Let Date: | 2004-09 | County: | COLLIN |
CCSJ: | 3476-02-004 | District: | DALLAS |
Project ID: | BR 2003(534) | Pct Complete: | 41% |
Commitment Amount: | 1,211,648.69 | ||
Commitment Work: | SUPPLY REINF STEEL (100% GOAL CREDIT | ||
Prime Contractors: | AUSTIN BRIDGE & ROAD, L | ||
Let Date: | 2004-10 | County: | DENTON |
CCSJ: | 0918-46-101 | District: | DALLAS |
Project ID: | BR 2000(684) | Pct Complete: | 100% |
Commitment Amount: | 0.00 | ||
Commitment Work: | |||
Prime Contractors: | L & N BRIDGE, LL | ||
Let Date: | 2004-10 | County: | STONEWALL |
CCSJ: | 0360-07-019 | District: | ABILENE |
Project ID: | BR 2004(270) | Pct Complete: | 94% |
Commitment Amount: | 41,446.41 | ||
Commitment Work: | SUPPLY REINFORCING STEEL & WWF (100% GOAL CREDIT | ||
Prime Contractors: | STEPHENS MARTIN PAVING, L.P | ||
Let Date: | 2004-11 | County: | NOLAN |
CCSJ: | 0006-15-028 | District: | ABILENE |
Project ID: | STP 2004(602) | Pct Complete: | 63% |
Commitment Amount: | 0.00 | ||
Commitment Work: | |||
Prime Contractors: | STEPHENS MARTIN PAVING, L.P | ||
Let Date: | 2004-11 | County: | ERATH |
CCSJ: | 0550-02-032 | District: | FORT WORTH |
Project ID: | MG 2004(796) | Pct Complete: | 10% |
Commitment Amount: | 141,531.72 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100 % GOAL CREDIT | ||
Prime Contractors: | JAY MILLS CONTRACTING, INCORPORATE | ||
Let Date: | 2004-12 | County: | SHELBY |
CCSJ: | 0743-03-012 | District: | LUFKIN |
Project ID: | BR 2005(88) | Pct Complete: | 68% |
Commitment Amount: | 57,499.22 | ||
Commitment Work: | SUPPLY REINFORCING STEEL (100% GOAL CREDIT | ||
Prime Contractors: | J-W PAYNE CONSTRUCTION COMPANY, LTD | ||
Let Date: | 2005-01 | County: | WISE |
CCSJ: | 0902-20-059 | District: | FORT WORTH |
Project ID: | BR 2001(679) | Pct Complete: | 45% |
Commitment Amount: | 16,361.25 | ||
Commitment Work: | DRILL SHAFT, CL C CONC(ABUT) REINF CONC SLA | ||
Prime Contractors: | L & N BRIDGE, LL | ||
Let Date: | 2005-01 | County: | TARRANT |
CCSJ: | 0353-07-014 | District: | FORT WORTH |
Project ID: | STP 2005(124)MM | Pct Complete: | 0% |
Commitment Amount: | 110,547.00 | ||
Commitment Work: | MANUFACTURE REINFORCING STEE | ||
Prime Contractors: | ORVAL HALL EXCAVATING CO | ||
Let Date: | 2005-01 | County: | TOM GREEN |
CCSJ: | 0264-07-025 | District: | SAN ANGELO |
Project ID: | NH 2005(132) | Pct Complete: | 9% |
Commitment Amount: | 264,120.00 | ||
Commitment Work: | BLACK REHAR(STRUCTURES | ||
Prime Contractors: | REECE ALBERT, INC | ||
Let Date: | 2005-02 | County: | ELLIS |
CCSJ: | 0918-22-072 | District: | DALLAS |
Project ID: | BR 2001(506) | Pct Complete: | 56% |
Commitment Amount: | 34,035.00 | ||
Commitment Work: | REBAR, EPOXY COATED REBA | ||
Prime Contractors: | REBCON, INC | ||
Let Date: | 2005-03 | County: | VAN ZANDT |
CCSJ: | 0495-03-055 | District: | TYLER |
Project ID: | BR 2005(268) | Pct Complete: | 30% |
Commitment Amount: | 81,925.00 | ||
Commitment Work: | SUPPLY REINFORCED STEE | ||
Prime Contractors: | LONGVIEW BRIDGE AND ROAD, LTD | ||
Let Date: | 2005-03 | County: | GRAY |
CCSJ: | 0275-23-002 | District: | AMARILLO |
Project ID: | NH 2005(248) | Pct Complete: | 35% |
Commitment Amount: | 124,487.75 | ||
Commitment Work: | MANUFACTURER: REBAR & EPOXY REBA | ||
Prime Contractors: | CONCHO CONSTRUCTION COMPANY, INC | ||
Let Date: | 2005-04 | County: | KERR |
CCSJ: | 0291-02-030 | District: | SAN ANTONIO |
Project ID: | STP 2005(332) | Pct Complete: | 1% |
Commitment Amount: | 112,480.00 | ||
Commitment Work: | BLACK REINFORCING STEE | ||
Prime Contractors: | CHEROKEE BRIDGE AND ROAD, LTD | ||
Let Date: | 2005-04 | County: | WICHITA |
CCSJ: | 0137-03-077 | District: | WICHITA FALLS |
Project ID: | BR 2005(308) | Pct Complete: | 21% |
Commitment Amount: | 29,729.65 | ||
Commitment Work: | REBAR, EPOXY COATED, COUPLER | ||
Prime Contractors: | DHT CODE 12232 NOT FOUN | ||
Let Date: | 2005-04 | County: | ANDERSON |
CCSJ: | 0559-01-009 | District: | TYLER |
Project ID: | BR 2005(334) | Pct Complete: | 57% |
Commitment Amount: | 81,767.67 | ||
Commitment Work: | MANUF / SUPP. BLK. REBA | ||
Prime Contractors: | REYNOLDS & KAY, LTD | ||
Let Date: | 2005-04 | County: | DENTON |
CCSJ: | 0918-46-100 | District: | DALLAS |
Project ID: | BR 2000(683) | Pct Complete: | 19% |
Commitment Amount: | 51,134.90 | ||
Commitment Work: | DRILL SHAFT, CL C CONCRETE ABUTMENT, REINF CONRETESLAB, RAI | ||
Prime Contractors: | L & N BRIDGE, LL | ||
Let Date: | 2005-04 | County: | SMITH |
CCSJ: | 0910-16-091 | District: | TYLER |
Project ID: | BR 2005(153) | Pct Complete: | 66% |
Commitment Amount: | 63,164.00 | ||
Commitment Work: | BLACK REINFORCING STEEL, 6X6X6/6 WW | ||
Prime Contractors: | LONGVIEW BRIDGE AND ROAD, LTD | ||
Let Date: | 2005-05 | County: | EASTLAND |
CCSJ: | 0923-09-042 | District: | BROWNWOOD |
Project ID: | BR 2005(230) | Pct Complete: | 8% |
Commitment Amount: | 0.00 | ||
Commitment Work: | |||
Prime Contractors: | ELLIS-MCGINNIS CONSTRUCTION CO | ||
Let Date: | 2005-05 | County: | RED RIVER |
CCSJ: | 0722-01-018 | District: | PARIS |
Project ID: | BR 2005(396) | Pct Complete: | 8% |
Commitment Amount: | 104,796.54 | ||
Commitment Work: | BLACK REINFORCING STEEL, 6X6X6/6 WW | ||
Prime Contractors: | R. K. HALL CONSTRUCTION, LL | ||
Let Date: | 2005-06 | County: | HARRISON |
CCSJ: | 1575-02-028 | District: | ATLANTA |
Project ID: | STP 2005(254)SFT | Pct Complete: | 5% |
Commitment Amount: | 5,992.00 | ||
Commitment Work: | FAB REIN STEEL, 6X6X6WWF FOR RIPRA | ||
Prime Contractors: | LONGVIEW BRIDGE AND ROAD, LTD | ||
Let Date: | 2005-06 | County: | BELL |
CCSJ: | 0231-03-089 | District: | WACO |
Project ID: | NH 2005(500) | Pct Complete: | 0% |
Commitment Amount: | 206,807.94 | ||
Commitment Work: | MANUFACTURE STRUCTURAL REBA | ||
Prime Contractors: | YOUNG CONTRACTORS, INC | ||
Let Date: | 2005-07 | County: | SOMERVELL |
CCSJ: | 0259-02-039 | District: | FORT WORTH |
Project ID: | BR 2005(676) | Pct Complete: | 0% |
Commitment Amount: | 191,514.36 | ||
Commitment Work: | MANUFACTRUE OF REINFORCING STEEL (BLACK AND EPOXY), COUPLERS (#11, 5, & 4 | ||
Prime Contractors: | ELLIS-MCGINNIS CONSTRUCTION CO | ||
Let Date: | 2005-07 | County: | KING |
CCSJ: | 0132-03-029 | District: | CHILDRESS |
Project ID: | NH 2005(672) | Pct Complete: | 0% |
Commitment Amount: | 242,225.24 | ||
Commitment Work: | ILACK REBAR (STRUCTURES), EPOXY REBAR (STRUCTURES)6X6X6/6 WW | ||
Prime Contractors: | RUSHING PAVING COMPANY, LTD | ||
Let Date: | 2005-08 | County: | SABINE |
CCSJ: | 0064-05-051 | District: | LUFKIN |
Project ID: | BR 2005(818) | Pct Complete: | 0% |
Commitment Amount: | 89,821.20 | ||
Commitment Work: | REINFORCING STEE | ||
Prime Contractors: | LONGVIEW BRIDGE AND ROAD, LTD | ||
|