Let Date: |
2001-08 |
County: |
COLLIN |
CCSJ: |
0281-02-048 |
District: |
DALLAS |
Project ID: |
STP 2001(589)MM |
Pct Complete: |
100% |
Commitment Amount: |
323,777.80 |
Commitment Work: |
CONDUIT, CONDUCT, BOXES, SERV, TRAF SIG, BKPLATE, PED SIG, CABLE, POLE ASSM, DETECT, LAMPS, RADIO ANTENN |
Prime Contractors: |
SITE CONCRETE, INC |
|
Let Date: |
2002-05 |
County: |
TARRANT |
CCSJ: |
0172-02-056 |
District: |
FORT WORTH |
Project ID: |
STP 2001(327)MM |
Pct Complete: |
81% |
Commitment Amount: |
967,170.35 |
Commitment Work: |
CONDUIT, ELEC CONDUCTOR, GRD CABLE, SM RDSD TY D, FND TRAF SIG, PED SIG, TRAF SIG POLE, VEH DETEC RDSD FLASH, JACK OR BORE PIP |
Prime Contractors: |
SITE CONCRETE, INC |
|
Let Date: |
2002-07 |
County: |
BEXAR |
CCSJ: |
0072-12-159 |
District: |
SAN ANTONIO |
Project ID: |
NH 2002(305) |
Pct Complete: |
69% |
Commitment Amount: |
0.00 |
Commitment Work: |
|
Prime Contractors: |
WILLIAMS BROTHERS CONSTRUCTION CO., INC |
|
Let Date: |
2002-08 |
County: |
TRAVIS |
CCSJ: |
0015-13-244 |
District: |
AUSTIN |
Project ID: |
NH 2002(622) |
Pct Complete: |
99% |
Commitment Amount: |
157,830.00 |
Commitment Work: |
CONDUIT(PVC)(SCHD 40)2" (BORE |
Prime Contractors: |
MASTEC NORTH AMERICA, INC |
|
Let Date: |
2002-11 |
County: |
COLLIN |
CCSJ: |
0364-04-022 |
District: |
DALLAS |
Project ID: |
NH 2002(933) |
Pct Complete: |
87% |
Commitment Amount: |
0.00 |
Commitment Work: |
|
Prime Contractors: |
AUSTIN BRIDGE & ROAD, L |
|
Let Date: |
2003-01 |
County: |
DENTON |
CCSJ: |
0135-10-023 |
District: |
DALLAS |
Project ID: |
NH 2000(508) |
Pct Complete: |
87% |
Commitment Amount: |
511,666.05 |
Commitment Work: |
COUDUIT, ELEC CONDUCTOR, GROUND BOX, SM RDSD SIGN,FND FOR TRAF SIG, VEH SIGN SEC, SIG CBL, SI POLE, LED TRAF SIG LAMP, PED POLE AS |
Prime Contractors: |
SITE CONCRETE, INC |
|
Let Date: |
2003-08 |
County: |
WILLIAMSON |
CCSJ: |
0683-01-070 |
District: |
TEXAS TURNPIKE AUTHORITY |
Project ID: |
TTA 2002(245) |
Pct Complete: |
70% |
Commitment Amount: |
300,000.00 |
Commitment Work: |
FURNISH ADN INSTALL TOLL PLAZA ELECTRICA |
Prime Contractors: |
GRANITE CONSTRUCTION COMPAN J.D. ABRAMS, L.P |
|
Let Date: |
2003-09 |
County: |
BEXAR |
CCSJ: |
0521-04-209 |
District: |
SAN ANTONIO |
Project ID: |
NH 2001(783) |
Pct Complete: |
36% |
Commitment Amount: |
614,239.50 |
Commitment Work: |
CONDUIT (RM) (2") (PUSHBORE), MULTI COND SYS (DIRECT BORE), FIBER OPTIC SIGN SYS (TY2) (TY3), LAN CONTROL SYSTE |
Prime Contractors: |
DEAN WORD COMPANY, LTD |
|
Let Date: |
2003-09 |
County: |
WILLIAMSON |
CCSJ: |
0683-01-069 |
District: |
TEXAS TURNPIKE AUTHORITY |
Project ID: |
TTA 2002(243) |
Pct Complete: |
55% |
Commitment Amount: |
3,318,550.75 |
Commitment Work: |
DRILL SHAFT (30-60), RDWY ILL ASSEM (50T) HIGH MSTCONDUIT, ELEC CONDUCTOR (2-12), GR BX (A,D)ELE SER, ALUM SIGNS (TYA),PVHD SGN SUPT, VEH SI |
Prime Contractors: |
AUSTIN BRIDGE & ROAD, L |
|
Let Date: |
2003-11 |
County: |
WILLIAMSON |
CCSJ: |
0151-05-081 |
District: |
TEXAS TURNPIKE AUTHORITY |
Project ID: |
NH 2002(99) |
Pct Complete: |
58% |
Commitment Amount: |
2,069,642.37 |
Commitment Work: |
DRIL SHAFT, HI MAST, CONDUIT, ELEC CONDUCTOR GROUND BOPX, ELEC SERV, PLYWOOD SIGNS, ALUM SIGN OVHD SGN, FND LG RDSD SGN, BK PLATE, TRAF SI |
Prime Contractors: |
ZACHRY CONSTRUCTION CORPORATIO |
|
Let Date: |
2003-11 |
County: |
DALLAS |
CCSJ: |
0918-45-495 |
District: |
DALLAS |
Project ID: |
STP 2004(30) |
Pct Complete: |
75% |
Commitment Amount: |
77,362.15 |
Commitment Work: |
HAUL EXCAVATION SP |
Prime Contractors: |
SITE CONCRETE, INC |
|
Let Date: |
2003-11 |
County: |
DALLAS |
CCSJ: |
0918-45-495 |
District: |
DALLAS |
Project ID: |
STP 2004(30) |
Pct Complete: |
75% |
Commitment Amount: |
154,034.50 |
Commitment Work: |
CONDUIT, CONDUCTOR, GROUND BOX, SMRD SGN ASSM, TRAF SIG, VEH SIG, PED SIG, SIG CBL, SIG POL ASSMVEH DETECT, TRF SIGNAL LAMP, SALV SIG, PED SI |
Prime Contractors: |
SITE CONCRETE, INC |
|
Let Date: |
2004-01 |
County: |
WILLIAMSON |
CCSJ: |
0683-06-024 |
District: |
TEXAS TURNPIKE AUTHORITY |
Project ID: |
TTA 2002(251) |
Pct Complete: |
47% |
Commitment Amount: |
1,406,133.63 |
Commitment Work: |
DRILL SHAFT, FIXTURES, RDWY ASSEM, CONDUIT, ELEC COND, GRD BX, ELEC SERV, ALUM SIGNS, OVHD SGN SGN WLKWY, FND LG RDWY, LOOP DETECTOR, DUCT BAN |
Prime Contractors: |
ZACHRY CONSTRUCTION CORPORATIO |
|
Let Date: |
2004-03 |
County: |
TRAVIS |
CCSJ: |
0683-07-003 |
District: |
TEXAS TURNPIKE AUTHORITY |
Project ID: |
TTA 2002(252) |
Pct Complete: |
58% |
Commitment Amount: |
0.00 |
Commitment Work: |
|
Prime Contractors: |
AUSTIN BRIDGE & ROAD, L |
|
Let Date: |
2004-03 |
County: |
WISE |
CCSJ: |
0134-07-044 |
District: |
FORT WORTH |
Project ID: |
NH 2004(279) |
Pct Complete: |
35% |
Commitment Amount: |
345,441.41 |
Commitment Work: |
RDWY ILL ASSEM, CONDUIT, ELEC CONDUCTOR, GRD BOX SM RD SGN, REPLAC SM RDSD, FND LG SGN, INSTAL TRAF SIG, PED SIG, LOUVER, TRAF LAMP, PED POL |
Prime Contractors: |
SITE CONCRETE, INC |
|
Let Date: |
2004-07 |
County: |
JOHNSON |
CCSJ: |
1853-01-030 |
District: |
FORT WORTH |
Project ID: |
STP 2004(528) |
Pct Complete: |
30% |
Commitment Amount: |
148,797.25 |
Commitment Work: |
CONDUIT, ELEC CONDUCTOR, GRD BOX, ELEC SERV, REMOVSERV POLE, ALUM SIGNS, SM RD SIGNS, DEL ASM, OB MRK, INSTALL HWY TRAF, VEH SIG SEC, VIVD |
Prime Contractors: |
JACKSON CONSTRUCTION, LTD |
|
Let Date: |
2004-07 |
County: |
TARRANT |
CCSJ: |
0902-48-305 |
District: |
FORT WORTH |
Project ID: |
CM 95(146) |
Pct Complete: |
42% |
Commitment Amount: |
871,720.23 |
Commitment Work: |
RDWY ILL ASEM, CONDUIT, ELEC CONDUCTOR, GROUND BX ELEC SERV, FND TRAF SIG, INSTAL HWY TRAF, TEM TRAF SIG, VEH SIG SEC, PED SIG, TRAF SIG PO; |
Prime Contractors: |
SUNMOUNT CORPORATIO |
|
Let Date: |
2004-07 |
County: |
COLLIN |
CCSJ: |
0364-04-037 |
District: |
DALLAS |
Project ID: |
NH 2004(523) |
Pct Complete: |
36% |
Commitment Amount: |
1,968,911.40 |
Commitment Work: |
DRILL SHAFT,ILL ASSM,HIGH MAST POLE,CONDUIT, CONDUCTOR,SGN ASSM,SGN SUPT, FND FOR SIG, SIG CBL TRF SIG POLE AMS, SIG LAMP, SALV SIG, SOLAR FLAS |
Prime Contractors: |
BALFOUR BEATTY CONSTRUCTION, INC |
|
Let Date: |
2004-10 |
County: |
DALLAS |
CCSJ: |
0581-02-112 |
District: |
DALLAS |
Project ID: |
NH 2004(723) |
Pct Complete: |
22% |
Commitment Amount: |
321,008.33 |
Commitment Work: |
DRILL SHAFT, ALUM SIGNS, SM RDSD SGN ASSM, REMOV LG SGN ASSM, RELOC SM RDSD SGN ASSM, OVHD SG SUPTREMOV OVHD SGN SUPPORT, REMOV OVHD SG |
Prime Contractors: |
AUSTIN BRIDGE & ROAD, L |
|
Let Date: |
2004-11 |
County: |
DENTON |
CCSJ: |
0196-01-093 |
District: |
DALLAS |
Project ID: |
IM 35-6(386) |
Pct Complete: |
100% |
Commitment Amount: |
77,408.80 |
Commitment Work: |
REMOV SERV POLE, ALUM SIGNS, GUIDE SIGN, SM RD SGNASSM, LG SD SGN SUPT, REMOV LG & SM SGN ASSM OVHDSGN SUPT, FND FOR RDSD SGN SUPT REMOV OVHD SI |
Prime Contractors: |
MCMAHON CONTRACTING, L.P |
|
Let Date: |
2004-12 |
County: |
TARRANT |
CCSJ: |
0902-48-542 |
District: |
FORT WORTH |
Project ID: |
STP 2005(47)MM |
Pct Complete: |
21% |
Commitment Amount: |
10,550.00 |
Commitment Work: |
CONDUIT, GRND BOX, TEMP TRAF SIGNAL, VLH SIG SEC, BK PLT, LOUVER, & VEH DETEC |
Prime Contractors: |
JACKSON CONSTRUCTION, LTD |
|
Let Date: |
2005-01 |
County: |
TARRANT |
CCSJ: |
0902-48-409 |
District: |
FORT WORTH |
Project ID: |
STP 2000(580)TE |
Pct Complete: |
16% |
Commitment Amount: |
463,722.15 |
Commitment Work: |
PREP ROW, REMOVE RDWY LLL ASSEM, GRD BOX TY (A) ELEC SERV, LANDSCAPE AND PED LIGHTIN |
Prime Contractors: |
AUI CONTRACTORS, L.P |
|
Let Date: |
2005-04 |
County: |
TARRANT |
CCSJ: |
0008-16-033 |
District: |
FORT WORTH |
Project ID: |
STP 2005(296) |
Pct Complete: |
35% |
Commitment Amount: |
130,000.54 |
Commitment Work: |
DRILL SHAFT, RIPRAP, ALUM SIGNS, REPLACE EXT SIGNSREMOVE SM RD SGN, DEL ASSM, SHIFT OVERHEA |
Prime Contractors: |
APAC-TEXAS, INC |
|
Let Date: |
2005-06 |
County: |
DALLAS |
CCSJ: |
0047-07-179 |
District: |
DALLAS |
Project ID: |
CM 2003(313) |
Pct Complete: |
0% |
Commitment Amount: |
213,190.43 |
Commitment Work: |
CONDUIT, ELEC CONDUCTOR,GROUND BOX TY A C, RD SGN,ASSM,INSTALL HWY TRAF SIG, PED & VEH DETEC ,TRAF SIGNAL LAMPS |
Prime Contractors: |
GIBSON & ASSOCIATES, INC |
|
Let Date: |
2005-06 |
County: |
DALLAS |
CCSJ: |
0196-03-106 |
District: |
DALLAS |
Project ID: |
IM 35E-6(388) |
Pct Complete: |
0% |
Commitment Amount: |
251,993.24 |
Commitment Work: |
DRL SFT (30 IN, SIGN MTS), RIP RAP, IN RD IL AM, RM RD IL AM, CONDT, ELCT CON, GRD BX, AL SGN, S RD SGN SUB (INT & RMV), OH SNG SUP & PNL (INS & R |
Prime Contractors: |
OMEGA CONTRACTING, INC |
|
Let Date: |
2005-08 |
County: |
WICHITA |
CCSJ: |
0044-01-080 |
District: |
WICHITA FALLS |
Project ID: |
STP 2005(862) |
Pct Complete: |
0% |
Commitment Amount: |
971,945.40 |
Commitment Work: |
DRILL SHAFT,INS RD, RELOCATE RDL,REMOVE RDIL,HI MIST IL POLE,CONDT(PVC)ELEC.CONDRGROUND BOX,EL SRV,PLYWOOD SIGNS,ALUM.SIGNS,RELOCATE/REMV.SIGNS |
Prime Contractors: |
ZACHRY CONSTRUCTION CORPORATIO |
|