Detail Letting Schedule for Cameron County (FY 2004)
| Detail Letting Schedule for Cameron County (FY 2004) | ||||
| Last Update: Tuesday, August 17, 2004 |
| Cameron County (FY 2004) |
CCSJ: 0220-04-032 | |||
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | BU 83-S | Let Status: | Actual |
| Project ID: | CPM 39-2-51 | CSJ: | 0039-02-051 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 1427 | Fund Cat: | 1 |
| Limits To: | US 83 (EAST INSPIRATION ROAD) | Estimate: | $97,675 |
| Length: | 3.3 Miles | Actual: | $92,593 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | US 83 | Let Status: | Actual |
| Project ID: | CPM 39-2-52 | CSJ: | 0039-02-052 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | STARR/HIDALGO CL | Fund Cat: | 1 |
| Limits To: | FM 2221 | Estimate: | $305,479 |
| Length: | 6.2 Miles | Actual: | $292,396 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | US 281 | Let Status: | Actual |
| Project ID: | CPM 220-2-22 | CSJ: | 0220-02-022 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | WEST FM 1015 | Fund Cat: | 1 |
| Limits To: | 800' EAST OF FM 491 | Estimate: | $88,506 |
| Length: | 3.7 Miles | Actual: | $84,136 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | US 281 | Let Status: | Actual |
| Project ID: | CPM 220-4-32 | CSJ: | 0220-04-032 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | 0.21 MILES NORTH OF FM 3248 | Fund Cat: | 1 |
| Limits To: | FM 1732 | Estimate: | $242,061 |
| Length: | 6.7 Miles | Actual: | $183,804 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | SH 285 | Let Status: | Actual |
| Project ID: | CPM 482-2-27 | CSJ: | 0482-02-027 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | 800' WEST OF SH 339 | Fund Cat: | 1 |
| Limits To: | SH 1329 | Estimate: | $157,835 |
| Length: | 7.1 Miles | Actual: | $145,960 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | SH 285 | Let Status: | Actual |
| Project ID: | CPM 482-3-26 | CSJ: | 0482-03-026 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | SH 1329 | Fund Cat: | 1 |
| Limits To: | 800' EAST OF FM 754 | Estimate: | $172,381 |
| Length: | 7.2 Miles | Actual: | $160,307 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | FM 493 | Let Status: | Actual |
| Project ID: | CPM 863-1-43 | CSJ: | 0863-01-043 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | US 281 | Fund Cat: | 1 |
| Limits To: | BUS 83 | Estimate: | $118,498 |
| Length: | 6.4 Miles | Actual: | $108,165 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | FM 506 | Let Status: | Actual |
| Project ID: | CPM 872-4-21 | CSJ: | 0872-04-021 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | 400' SOUTH OF FM 107 | Fund Cat: | 1 |
| Limits To: | US 83 | Estimate: | $118,831 |
| Length: | 5.6 Miles | Actual: | $109,065 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | FM 509 | Let Status: | Actual |
| Project ID: | CPM 1065-1-11 | CSJ: | 1065-01-011 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | FM 675 | Fund Cat: | 1 |
| Limits To: | US 77 | Estimate: | $125,920 |
| Length: | 5.3 Miles | Actual: | $116,597 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | FM 509 | Let Status: | Actual |
| Project ID: | CPM 1065-3-8 | CSJ: | 1065-03-008 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | STATE MAINT. @ LOS INDIOS | Fund Cat: | 1 |
| Limits To: | FM 675 | Estimate: | $115,451 |
| Length: | 3.9 Miles | Actual: | $107,378 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | FM 1015 | Let Status: | Actual |
| Project ID: | CPM 1228-3-32 | CSJ: | 1228-03-032 |
| Description: | SEAL COAT | Handling Code: |
|
| Limits From: | 0.23 MILES SOUTH OF SH 107 | Fund Cat: | 1 |
| Limits To: | 0.23 MILES NORTH OF MILE 9 ROAD | Estimate: | $152,909 |
| Length: | 7.0 Miles | Actual: | $141,980 |
|
Back... |
Totals for 0220-04-032 | ||
|---|---|---|---|
| Length: | 62.4 Miles | ||
| Estimate: | $1,695,546 | ||
| Actual: | $1,542,381 | ||
CCSJ: 0220-05-062 | |||
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | BU 83-S | Let Status: | Actual |
| Project ID: | CPM 39-3-89 | CSJ: | 0039-03-089 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | US 83 (INSPIRATION RD.) | Fund Cat: | 1 |
| Limits To: | SH 107 | Estimate: | $200,087 |
| Length: | 1.4 Miles | Actual: | $203,357 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | SH 4 | Let Status: | Actual |
| Project ID: | CC 39-10-64 | CSJ: | 0039-10-064 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | SH 48 | Fund Cat: | 10 |
| Limits To: | FM 2519 | Estimate: | $92,309 |
| Length: | 0.8 Miles | Actual: | $104,143 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | US 83 | Let Status: | Actual |
| Project ID: | CPM 39-17-154 | CSJ: | 0039-17-154 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | SUGAR ROAD | Fund Cat: | 1 |
| Limits To: | FM 1426 | Estimate: | $856,784 |
| Length: | 2.6 Miles | Actual: | $719,309 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | US 281 | Let Status: | Actual |
| Project ID: | CPM 220-4-33 | CSJ: | 0220-04-033 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | BUS 77 | Fund Cat: | 1 |
| Limits To: | 500' SOUTH OF FM 802 | Estimate: | $205,455 |
| Length: | 1.9 Miles | Actual: | $211,922 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | SH 48 | Let Status: | Actual |
| Project ID: | CC 220-5-62 | CSJ: | 0220-05-062 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | SH 4 | Fund Cat: | 10 |
| Limits To: | FM 802 | Estimate: | $691,294 |
| Length: | 3.4 Miles | Actual: | $737,127 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | US 281 | Let Status: | Actual |
| Project ID: | CPM 255-4-83 | CSJ: | 0255-04-083 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | 15 MILES SOUTH OF FM 3066 | Fund Cat: | 1 |
| Limits To: | 0.4 MILES SOUTH OF FM 3066 | Estimate: | $1,071,237 |
| Length: | 14.6 Miles | Actual: | $1,046,054 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | US 281 | Let Status: | Actual |
| Project ID: | CPM 255-6-52 | CSJ: | 0255-06-052 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | SAN MANUEL | Fund Cat: | 1 |
| Limits To: | 8.66 MILES NORTH | Estimate: | $1,170,563 |
| Length: | 8.7 Miles | Actual: | $1,077,096 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | US 281 | Let Status: | Actual |
| Project ID: | CPM 255-7-117 | CSJ: | 0255-07-117 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | 0.6 MILES SOUTH OF FM 162 | Fund Cat: | 1 |
| Limits To: | 0.7 MILES NORTH OF FM 2812 | Estimate: | $113,358 |
| Length: | 0.9 Miles | Actual: | $112,528 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | SP 241 | Let Status: | Actual |
| Project ID: | CPM 255-9-86 | CSJ: | 0255-09-086 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | SP 241 | Fund Cat: | 1 |
| Limits To: | BRIDGE ST. IN HIDALGO | Estimate: | $107,063 |
| Length: | 0.7 Miles | Actual: | $107,761 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | SH 107 | Let Status: | Actual |
| Project ID: | CPM 528-1-81 | CSJ: | 0528-01-081 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | BUS 83 NORTH | Fund Cat: | 1 |
| Limits To: | SH 495 | Estimate: | $154,533 |
| Length: | 1.0 Miles | Actual: | $162,151 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | FM 106 | Let Status: | Actual |
| Project ID: | CPM 630-2-38 | CSJ: | 0630-02-038 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | FM 1595 | Fund Cat: | 1 |
| Limits To: | RIO HONDO LIFT BRIDGE | Estimate: | $129,015 |
| Length: | 1.8 Miles | Actual: | $130,580 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | FM 106 | Let Status: | Actual |
| Project ID: | CPM 1425-3-47 | CSJ: | 1425-03-047 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | FM 509 | Fund Cat: | 1 |
| Limits To: | FM 1595 | Estimate: | $215,486 |
| Length: | 3.4 Miles | Actual: | $220,799 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | SH 4 | Let Status: | Actual |
| Project ID: | CC 1504-1-33 | CSJ: | 1504-01-033 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | US 77/83 | Fund Cat: | 10 |
| Limits To: | SH 48 | Estimate: | $210,051 |
| Length: | 1.5 Miles | Actual: | $236,451 |
| District: | Pharr | Let Date: | DEC 2003 |
| Highway: | SP 115 | Let Status: | Actual |
| Project ID: | CPM 1804-1-56 | CSJ: | 1804-01-056 |
| Description: | ACP OVERLAY | Handling Code: |
|
| Limits From: | 1 MILE SOUTH OF US 83 | Fund Cat: | 1 |
| Limits To: | SP 241 | Estimate: | $679,059 |
| Length: | 4.8 Miles | Actual: | $660,289 |
|
Back... |
Totals for 0220-05-062 | ||
| Length: | 47.5 Miles | ||
| Estimate: | $5,896,294 | ||
| Actual: | $5,729,567 | ||
CCSJ: 0331-04-055 | |||
| District: | Pharr | Let Date: | FEB 2004 |
| Highway: | PR 100 | Let Status: | Actual |
| Project ID: | BR 2004(246) | CSJ: | 0331-04-055 |
| Description: | CONSTRUCT PIER PROTECTION | Handling Code: |
|
| Limits From: | AT QUEEN ISABELLA CAUSEWAY | Fund Cat: | 10 |
| Limits To: | . | Estimate: | $5,973,060 |
| Length: | 0.3 Miles | Actual: | $5,568,350 |
|
Back... |
Totals for 0331-04-055 | ||
| Length: | 0.3 Miles | ||
| Estimate: | $5,973,060 | ||
| Actual: | $5,568,350 | ||
CCSJ: 0921-06-132 | |||
| District: | Pharr | Let Date: | FEB 2004 |
| Highway: | CR | Let Status: | Actual |
| Project ID: | BR 2000(849) | CSJ: | 0921-06-132 |
| Description: | REPLACE BRIDGE & APPROACHES | Handling Code: |
|
| Limits From: | MARYDALE @ RESACA DEL RANCHO VIEJO | Fund Cat: | 6 |
| Limits To: | (KILGORE ROAD) | Estimate: | $353,883 |
| Length: | 0.1 Miles | Actual: | $382,638 |
| District: | Pharr | Let Date: | FEB 2004 |
| Highway: | CR | Let Status: | Actual |
| Project ID: | BR 2003(351) | CSJ: | 0921-06-164 |
| Description: | REPLACE BRIDGE AND REPAIR APPROACHES | Handling Code: |
|
| Limits From: | STENGER STREET 0.40 MI NW OF JCT SH | Fund Cat: | 6 |
| Limits To: | OVER RESACA DELOS FRENOS(STR#N008-1 | Estimate: | $419,177 |
| Length: | 0.1 Miles | Actual: | $447,920 |
| District: | Pharr | Let Date: | FEB 2004 |
| Highway: | CR | Let Status: | Actual |
| Project ID: | BR 2003(352) | CSJ: | 0921-06-165 |
| Description: | REPLACE BRIDGE AND REPAIR APPROACHES | Handling Code: |
|
| Limits From: | CR 367 0.25 MI E OF FM 2925 | Fund Cat: | 6 |
| Limits To: | AT SAN VICENTE DRAIN (STR#AA03-67-0 | Estimate: | $175,037 |
| Length: | 0.1 Miles | Actual: | $214,651 |
| District: | Pharr | Let Date: | FEB 2004 |
| Highway: | CR | Let Status: | Actual |
| Project ID: | BR 2003(353) | CSJ: | 0921-06-166 |
| Description: | REPLACE BRIDGE AND REPAIR APPROACHES | Handling Code: |
|
| Limits From: | CR 368-0.25 MI E OF FM 2925 | Fund Cat: | 6 |
| Limits To: | AT SAN VICENTE DRAIN (STR#AA03-68-0 | Estimate: | $183,905 |
| Length: | 0.1 Miles | Actual: | $223,580 |
| District: | Pharr | Let Date: | FEB 2004 |
| Highway: | CR | Let Status: | Actual |
| Project ID: | BR 2003(354) | CSJ: | 0921-06-167 |
| Description: | REPLACE BRIDGE AND REPAIR APPROACH | Handling Code: |
|
| Limits From: | CR 882 (IOWA GARDEN RD)(STR#AA08-82 | Fund Cat: | 6 |
| Limits To: | OVER DRAINAGE DITCH | Estimate: | $347,314 |
| Length: | 0.2 Miles | Actual: | $430,605 |
|
Back... |
Totals for 0921-06-132 | ||
| Length: | 0.6 Miles | ||
| Estimate: | $1,479,316 | ||
| Actual: | $1,699,394 | ||
CCSJ: 0921-06-146 | |||
| District: | Pharr | Let Date: | OCT 2003 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | HP 1030(4) | CSJ: | 0921-06-146 |
| Description: | CONSTRUCT ADMINISTRATION BUILDING AND PARKING AREA | Handling Code: |
LC |
| Limits From: | @ NEWLY RELOCATED SWITCHING YARD | Fund Cat: | 10 |
| Limits To: | IN NORTH BROWNSVILLE | Estimate: | $410,000 |
| Length: | 0.0 Miles | Actual: | $924,000 |
|
Back... |
Totals for 0921-06-146 | ||
| Length: | 0.0 Miles | ||
| Estimate: | $410,000 | ||
| Actual: | $924,000 | ||
CCSJ: 0921-06-161 | |||
| District: | Pharr | Let Date: | APR 2004 |
| Highway: | VA | Let Status: | Actual |
| Project ID: | STP 2002(176)TE | CSJ: | 0921-06-161 |
| Description: | CONSTRUCT EL PASEO DE SANTA ISABELLA PEDESTRIAN & BICYCLE | Handling Code: |
NC |
| Limits From: | ON SH 100, 1.216 MI W OF SH 48 | Fund Cat: | 9 |
| Limits To: | SH 100 & GARCIA ST IN PORT ISABEL | Estimate: | $561,615 |
| Length: | 2.7 Miles | Actual: | $706,141 |
|
Back... |
Totals for 0921-06-161 | ||
| Length: | 2.7 Miles | ||
| Estimate: | $561,615 | ||
| Actual: | $706,141 | ||
CCSJ: 0921-06-177 | |||
| District: | Pharr | Let Date: | AUG 2004 |
| Highway: | CS | Let Status: | Approved |
| Project ID: | C 921-6-177 | CSJ: | 0921-06-177 |
| Description: | ROAD IMPROVEMENTS | Handling Code: |
NC |
| Limits From: | AT RESACA DE LA PALMA STATE PARK N | Fund Cat: | 10 |
| Limits To: | FM 1732 IN CAMERON COUNTY | Estimate: | $835,447 |
| Length: | 1.5 Miles | Actual: | |
|
List Showing Order Bidders List Bid Tabulations Proposal Req Form Back... |
Totals for 0921-06-177 | ||
| Length: | 1.5 Miles | ||
| Estimate: | $835,447 | ||
| Actual: | |||
CCSJ: 1057-02-019 | |||
| District: | Pharr | Let Date: | MAR 2004 |
| Highway: | FM 732 | Let Status: | Actual |
| Project ID: | C 1057-2-19 | CSJ: | 1057-02-019 |
| Description: | REPLACE BRIDGE AND APPROACHES (FS SLAB PROGRAM) | Handling Code: |
|
| Limits From: | ON FM 732 OVER DRAIN -- STR # 019 | Fund Cat: | 1 |
| Limits To: | @ 0.25 MILES SOUTHWEST OF US 77 | Estimate: | $556,284 |
| Length: | 0.2 Miles | Actual: | $574,738 |
| District: | Pharr | Let Date: | MAR 2004 |
| Highway: | FM 800 | Let Status: | Actual |
| Project ID: | C 1136-2-22 | CSJ: | 1136-02-022 |
| Description: | REPLACE BRIDGE & APPROACHES_ (FS SLAB PROGRAM) | Handling Code: |
|
| Limits From: | ON FM 800 OVER DRAIN -- STR # 006 | Fund Cat: | 1 |
| Limits To: | @ .43 MI NORTHWEST OF FM 2520 | Estimate: | $855,931 |
| Length: | 0.3 Miles | Actual: | $832,151 |
|
Back... |
Totals for 1057-02-019 | ||
| Length: | 0.5 Miles | ||
| Estimate: | $1,412,215 | ||
| Actual: | $1,406,889 | ||
CCSJ: 1137-02-030 | |||
| District: | Pharr | Let Date: | NOV 2003 |
| Highway: | LP 499 | Let Status: | Actual |
| Project ID: | NH 2003(718) | CSJ: | 1137-02-030 |
| Description: | RECONSTRUCT AND WIDEN TO 4 - LANE DIVIDED | Handling Code: |
|
| Limits From: | FM 507, WEST | Fund Cat: | 1 |
| Limits To: | US 77 | Estimate: | $6,768,492 |
| Length: | 2.9 Miles | Actual: | $6,340,230 |
|
Back... |
Totals for 1137-02-030 | ||
| Length: | 2.9 Miles | ||
| Estimate: | $6,768,492 | ||
| Actual: | $6,340,230 | ||
CCSJ: 1140-02-031 | |||
| District: | Pharr | Let Date: | NOV 2003 |
| Highway: | FM 802 | Let Status: | Actual |
| Project ID: | MG 2003(714) | CSJ: | 1140-02-031 |
| Description: | LANDSCAPE DEVELOPMENT WITH IRRIGATION SYSTEM | Handling Code: |
|
| Limits From: | FM 1847 | Fund Cat: | 10 |
| Limits To: | SH 48 | Estimate: | $138,815 |
| Length: | 3.8 Miles | Actual: | $134,843 |
|
Back... |
Totals for 1140-02-031 | ||
| Length: | 3.8 Miles | ||
| Estimate: | $138,815 | ||
| Actual: | $134,843 | ||
|
| |