Detail Letting Schedule for Dickens County (FY 2004)
| Detail Letting Schedule for Dickens County (FY 2004) | ||||
| Last Update: Tuesday, August 17, 2004 |
| Dickens County (FY 2004) |
CCSJ: 0132-01-045 | |||
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | US 83 | Let Status: | Actual |
| Project ID: | CPM 32-5-33 | CSJ: | 0032-05-033 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | COTTLE C/L, S | Fund Cat: | 1 |
| Limits To: | 8.5 MILES | Estimate: | $196,260 |
| Length: | 7.8 Miles | Actual: | $190,909 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | US 83 | Let Status: | Actual |
| Project ID: | CPM 32-6-30 | CSJ: | 0032-06-030 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | US 82 S INT, S | Fund Cat: | 1 |
| Limits To: | 6.1 MILES | Estimate: | $160,649 |
| Length: | 6.1 Miles | Actual: | $156,271 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | SP 133 | Let Status: | Actual |
| Project ID: | CPM 43-10-6 | CSJ: | 0043-10-006 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | LOOP 285, E | Fund Cat: | 1 |
| Limits To: | FM 2568 | Estimate: | $20,399 |
| Length: | 1.0 Miles | Actual: | $21,509 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | LP 285 | Let Status: | Actual |
| Project ID: | CPM 43-23-6 | CSJ: | 0043-23-006 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | US 287 W INT, E | Fund Cat: | 1 |
| Limits To: | US 287 E INT | Estimate: | $86,117 |
| Length: | 4.8 Miles | Actual: | $90,934 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | SP 196 | Let Status: | Actual |
| Project ID: | CPM 105-8-4 | CSJ: | 0105-08-004 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 70, E | Fund Cat: | 1 |
| Limits To: | US 62 | Estimate: | $15,334 |
| Length: | 0.8 Miles | Actual: | $16,190 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 94SP | Let Status: | Actual |
| Project ID: | CPM 105-9-4 | CSJ: | 0105-09-004 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 70, E | Fund Cat: | 1 |
| Limits To: | FM 94 | Estimate: | $7,675 |
| Length: | 0.8 Miles | Actual: | $8,101 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | US 82 | Let Status: | Actual |
| Project ID: | CPM 132-1-45 | CSJ: | 0132-01-045 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | DICKENS ECL, E | Fund Cat: | 1 |
| Limits To: | FM 265 | Estimate: | $667,514 |
| Length: | 4.2 Miles | Actual: | $679,353 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | US 82 | Let Status: | Actual |
| Project ID: | CPM 133-1-40 | CSJ: | 0133-01-040 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 222, E | Fund Cat: | 1 |
| Limits To: | KNOX C/L | Estimate: | $221,032 |
| Length: | 5.6 Miles | Actual: | $215,210 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | US 70 | Let Status: | Actual |
| Project ID: | CPM 146-4-24 | CSJ: | 0146-04-024 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 654 | Fund Cat: | 1 |
| Limits To: | COTTLE C/L | Estimate: | $65,000 |
| Length: | 10.3 Miles | Actual: | $65,000 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | US 70 | Let Status: | Actual |
| Project ID: | CPM 146-5-31 | CSJ: | 0146-05-031 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | WCL CROWELL, W | Fund Cat: | 1 |
| Limits To: | FM 654 | Estimate: | $61,000 |
| Length: | 9.6 Miles | Actual: | $61,000 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | SH 256 | Let Status: | Actual |
| Project ID: | CPM 381-3-21 | CSJ: | 0381-03-021 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | HALL C/L, E | Fund Cat: | 1 |
| Limits To: | US 83 | Estimate: | $267,412 |
| Length: | 13.7 Miles | Actual: | $282,374 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | SH 152 | Let Status: | Actual |
| Project ID: | CPM 486-1-27 | CSJ: | 0486-01-027 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | US 83, E | Fund Cat: | 1 |
| Limits To: | RODGER MILLS C/L | Estimate: | $349,743 |
| Length: | 15.5 Miles | Actual: | $344,940 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1039 | Let Status: | Actual |
| Project ID: | CPM 538-4-6 | CSJ: | 0538-04-006 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | END OF PAVEMENT, S | Fund Cat: | 1 |
| Limits To: | US 70 | Estimate: | $19,910 |
| Length: | 2.6 Miles | Actual: | $21,011 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 392 | Let Status: | Actual |
| Project ID: | CPM 702-2-29 | CSJ: | 0702-02-029 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 91, S | Fund Cat: | 1 |
| Limits To: | FM 1167 | Estimate: | $51,596 |
| Length: | 5.7 Miles | Actual: | $54,459 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2042 | Let Status: | Actual |
| Project ID: | CPM 704-1-16 | CSJ: | 0704-01-016 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 3468, E | Fund Cat: | 1 |
| Limits To: | FM 94 | Estimate: | $106,865 |
| Length: | 10.0 Miles | Actual: | $112,800 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 94 | Let Status: | Actual |
| Project ID: | CPM 704-6-9 | CSJ: | 0704-06-009 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | STEWART ST, S | Fund Cat: | 1 |
| Limits To: | US 62 | Estimate: | $7,334 |
| Length: | 0.2 Miles | Actual: | $7,747 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 266 | Let Status: | Actual |
| Project ID: | CPM 758-1-28 | CSJ: | 0758-01-028 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | HEFNER, S | Fund Cat: | 1 |
| Limits To: | HASKELL C/L | Estimate: | $110,825 |
| Length: | 10.1 Miles | Actual: | $116,963 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1547 | Let Status: | Actual |
| Project ID: | CPM 761-3-18 | CSJ: | 0761-03-018 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | I 40, S | Fund Cat: | 1 |
| Limits To: | COLLINGSWORTH C/L | Estimate: | $27,687 |
| Length: | 3.0 Miles | Actual: | $29,219 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1547 | Let Status: | Actual |
| Project ID: | CPM 761-4-11 | CSJ: | 0761-04-011 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | WHEELER C/L, S | Fund Cat: | 1 |
| Limits To: | FM 1036 | Estimate: | $68,591 |
| Length: | 7.0 Miles | Actual: | $72,412 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1260 | Let Status: | Actual |
| Project ID: | CPM 795-2-13 | CSJ: | 0795-02-013 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | END OF PAVEMENT, S | Fund Cat: | 1 |
| Limits To: | US 287 | Estimate: | $101,617 |
| Length: | 10.1 Miles | Actual: | $107,248 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1260 | Let Status: | Actual |
| Project ID: | CPM 795-3-9 | CSJ: | 0795-03-009 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | US 287, S | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $82,888 |
| Length: | 8.5 Miles | Actual: | $87,505 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1547 | Let Status: | Actual |
| Project ID: | CPM 797-7-25 | CSJ: | 0797-07-025 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 1036, S | Fund Cat: | 1 |
| Limits To: | FM 3143 | Estimate: | $29,861 |
| Length: | 3.0 Miles | Actual: | $31,518 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1547 | Let Status: | Actual |
| Project ID: | CPM 844-3-11 | CSJ: | 0844-03-011 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 3143, S | Fund Cat: | 1 |
| Limits To: | FM 1981 | Estimate: | $68,502 |
| Length: | 7.0 Miles | Actual: | $72,318 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 193 | Let Status: | Actual |
| Project ID: | CPM 950-1-23 | CSJ: | 0950-01-023 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 70, E | Fund Cat: | 1 |
| Limits To: | 7.100 MI | Estimate: | $78,729 |
| Length: | 7.1 Miles | Actual: | $83,084 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 193 | Let Status: | Actual |
| Project ID: | CPM 950-4-20 | CSJ: | 0950-04-020 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | CROSBY C/L, E | Fund Cat: | 1 |
| Limits To: | SH 70 | Estimate: | $179,824 |
| Length: | 16.9 Miles | Actual: | $189,853 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 378 | Let Status: | Actual |
| Project ID: | CPM 970-115 | CSJ: | 0970-01-015 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 86, S | Fund Cat: | 1 |
| Limits To: | FLOYD C/L | Estimate: | $113,303 |
| Length: | 11.4 Miles | Actual: | $119,593 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 599 | Let Status: | Actual |
| Project ID: | CPM 971-1-12 | CSJ: | 0971-01-012 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | 1.859 MI N OF MOTLEY C/L, S | Fund Cat: | 1 |
| Limits To: | MOTLEY C/L | Estimate: | $18,395 |
| Length: | 1.9 Miles | Actual: | $19,417 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 657 | Let Status: | Actual |
| Project ID: | CPM 1040-2-18 | CSJ: | 1040-02-018 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 256, S | Fund Cat: | 1 |
| Limits To: | FM 1041 | Estimate: | $54,844 |
| Length: | 5.1 Miles | Actual: | $57,903 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 924 | Let Status: | Actual |
| Project ID: | CPM 1162-3-6 | CSJ: | 1162-03-006 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 91, N | Fund Cat: | 1 |
| Limits To: | WILBARGER C/L | Estimate: | $16,478 |
| Length: | 1.8 Miles | Actual: | $17,396 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1045 | Let Status: | Actual |
| Project ID: | CPM 1218-1-8 | CSJ: | 1218-01-008 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 70, E | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $55,501 |
| Length: | 6.9 Miles | Actual: | $58,583 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1594 | Let Status: | Actual |
| Project ID: | CPM 1514-01-12 | CSJ: | 1514-01-012 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | US 70, S | Fund Cat: | 1 |
| Limits To: | SH 6 | Estimate: | $354,206 |
| Length: | 8.2 Miles | Actual: | $365,323 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | RM 1919 | Let Status: | Actual |
| Project ID: | CPM 1523-2-12 | CSJ: | 1523-02-012 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 267, S | Fund Cat: | 1 |
| Limits To: | BAYLOR C/L | Estimate: | $101,766 |
| Length: | 9.1 Miles | Actual: | $107,441 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2363 | Let Status: | Actual |
| Project ID: | CPM 1701-2-11 | CSJ: | 1701-02-011 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | US 287, S | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $53,610 |
| Length: | 5.0 Miles | Actual: | $56,560 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 684 | Let Status: | Actual |
| Project ID: | CPM 1702-1-8 | CSJ: | 1702-01-008 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 70, E | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $52,145 |
| Length: | 5.5 Miles | Actual: | $55,042 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1168 | Let Status: | Actual |
| Project ID: | CPM 1771-1-13 | CSJ: | 1771-01-013 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 1038, S | Fund Cat: | 1 |
| Limits To: | KING C/L | Estimate: | $62,348 |
| Length: | 7.0 Miles | Actual: | $65,813 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2033 | Let Status: | Actual |
| Project ID: | CPM 1774-1-9 | CSJ: | 1774-01-009 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | US 83, E | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $17,909 |
| Length: | 1.7 Miles | Actual: | $18,893 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2042 | Let Status: | Actual |
| Project ID: | CPM 2037-1-11 | CSJ: | 2037-01-011 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 94, S | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT (S OF TELL) | Estimate: | $31,267 |
| Length: | 2.9 Miles | Actual: | $33,004 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2999 | Let Status: | Actual |
| Project ID: | CPM 2179-1-1 | CSJ: | 2179-01-001 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 70, W | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $32,924 |
| Length: | 3.6 Miles | Actual: | $34,753 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2876 | Let Status: | Actual |
| Project ID: | CPM 2551-2-5 | CSJ: | 2251-02-005 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 104, S | Fund Cat: | 1 |
| Limits To: | US 83 | Estimate: | $42,705 |
| Length: | 4.7 Miles | Actual: | $45,069 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2364 | Let Status: | Actual |
| Project ID: | CPM 2261-1-7 | CSJ: | 2261-01-007 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 104, S | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $28,240 |
| Length: | 3.1 Miles | Actual: | $29,806 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 925 | Let Status: | Actual |
| Project ID: | CPM 2312-1-4 | CSJ: | 2312-01-004 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | US 287, S | Fund Cat: | 1 |
| Limits To: | WILLBARGER C/L | Estimate: | $6,647 |
| Length: | 0.7 Miles | Actual: | $7,017 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 657 | Let Status: | Actual |
| Project ID: | CPM 2319-1-17 | CSJ: | 2319-01-017 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 1041, S | Fund Cat: | 1 |
| Limits To: | SH 86 | Estimate: | $107,286 |
| Length: | 10.0 Miles | Actual: | $113,258 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 284 | Let Status: | Actual |
| Project ID: | CPM 2531-1-8 | CSJ: | 2531-01-008 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 86, S | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $89,096 |
| Length: | 9.0 Miles | Actual: | $94,049 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2566 | Let Status: | Actual |
| Project ID: | CPM 2544-1-7 | CSJ: | 2544-01-007 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | END OF PAVEMENT, S | Fund Cat: | 1 |
| Limits To: | US 70 | Estimate: | $36,308 |
| Length: | 4.0 Miles | Actual: | $38,324 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2639 | Let Status: | Actual |
| Project ID: | CPM 2630-1-1 | CSJ: | 2630-01-001 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | END OF PAVEMENT, S | Fund Cat: | 1 |
| Limits To: | SH 86 | Estimate: | $30,393 |
| Length: | 3.4 Miles | Actual: | $32,082 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2877 | Let Status: | Actual |
| Project ID: | CPM 2842-1-5 | CSJ: | 2842-01-005 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 1594, E | Fund Cat: | 1 |
| Limits To: | FM 267 | Estimate: | $43,352 |
| Length: | 4.8 Miles | Actual: | $45,758 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2998 | Let Status: | Actual |
| Project ID: | CPM 3001-1-4 | CSJ: | 3001-01-004 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | US 83 N INT, S | Fund Cat: | 1 |
| Limits To: | US 83 S INT, | Estimate: | $39,177 |
| Length: | 4.4 Miles | Actual: | $41,354 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 3030 | Let Status: | Actual |
| Project ID: | CPM 3070-1-3 | CSJ: | 3070-01-003 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | END OF PAVEMENT, S | Fund Cat: | 1 |
| Limits To: | SH 86 | Estimate: | $39,140 |
| Length: | 3.9 Miles | Actual: | $41,313 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 3032 | Let Status: | Actual |
| Project ID: | CPM 3071-1-3 | CSJ: | 3071-01-003 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 256, S | Fund Cat: | 1 |
| Limits To: | FM 1619 | Estimate: | $39,806 |
| Length: | 4.4 Miles | Actual: | $42,011 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | SP 133 | Let Status: | Actual |
| Project ID: | CPM 3194-1-6 | CSJ: | 3194-01-006 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | .396 MI E SH 6, E | Fund Cat: | 1 |
| Limits To: | FM 2568 | Estimate: | $6,704 |
| Length: | 0.7 Miles | Actual: | $7,067 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 3202 | Let Status: | Actual |
| Project ID: | CPM 3295-1-1 | CSJ: | 3295-01-001 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 2534, S | Fund Cat: | 1 |
| Limits To: | FM 1043 | Estimate: | $33,652 |
| Length: | 3.4 Miles | Actual: | $35,519 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 3256 | Let Status: | Actual |
| Project ID: | CPM 3326-1-5 | CSJ: | 3326-01-005 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | END OF PAVEMENT, E | Fund Cat: | 1 |
| Limits To: | US 83 | Estimate: | $19,925 |
| Length: | 2.1 Miles | Actual: | $21,027 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1380 | Let Status: | Actual |
| Project ID: | CPM 3428-1-1 | CSJ: | 3428-01-001 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 94, S | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $20,364 |
| Length: | 2.1 Miles | Actual: | $21,490 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1608 | Let Status: | Actual |
| Project ID: | CPM 3444-1-4 | CSJ: | 3444-01-004 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 266,E | Fund Cat: | 1 |
| Limits To: | BAYLOR C/L | Estimate: | $26,551 |
| Length: | 2.5 Miles | Actual: | $28,030 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 1608 | Let Status: | Actual |
| Project ID: | CPM 3444-2-7 | CSJ: | 3444-02-007 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | KNOX C/L, E | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $84,821 |
| Length: | 7.9 Miles | Actual: | $89,540 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 3323 | Let Status: | Actual |
| Project ID: | CPM 3494-1-1 | CSJ: | 3494-01-001 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | SH 86, S | Fund Cat: | 1 |
| Limits To: | END OF PAVEMENT | Estimate: | $25,814 |
| Length: | 2.9 Miles | Actual: | $27,246 |
| District: | Childress | Let Date: | SEP 2003 |
| Highway: | FM 2042 | Let Status: | Actual |
| Project ID: | CPM 3554-1-4 | CSJ: | 3554-01-004 |
| Description: | DISTRICTWIDE SEAL COAT | Handling Code: |
|
| Limits From: | FM 3031, E | Fund Cat: | 1 |
| Limits To: | FM 3468 | Estimate: | $34,120 |
| Length: | 3.1 Miles | Actual: | $35,999 |
|
Back... |
Totals for 0132-01-045 | ||
|---|---|---|---|
| Length: | 318.6 Miles | ||
| Estimate: | $4,771,161 | ||
| Actual: | $4,923,608 | ||
|
| |