Detail Letting Schedule for Borden County (FY 2005)

 
 
Last Update: Monday, August 15, 2005
Borden County (FY 2005)

CCSJ: 0558-03-022

District: Abilene Let Date: NOV 2004
Highway: FM 669 Let Status: Actual
Project ID: CPM 558-3-22 CSJ: 0558-03-022
Description: UPGARDE BRIDGE RAIL, MBGF AND JOINT REPLACEMENT Handling
Code:
 
Limits From: AT THE COLORADO RIVER Fund Cat: 1
Limits To: . Estimate: $64,706
Length: 0.1 Miles Actual: $74,150
 
District: Abilene Let Date: NOV 2004
Highway: FM 1205 Let Status: Actual
Project ID: CPM 1981-1-16 CSJ: 1981-01-016
Description: UPGRADE BRIDGE RAIL, MBGF AND JOINT REPLACEMENT Handling
Code:
 
Limits From: AT THE COLORADO RIVER Fund Cat: 1
Limits To: . Estimate: $75,638
Length: 0.1 Miles Actual: $64,680
 
Back...

Totals for 0558-03-022
Length: 0.2 Miles
Estimate: $140,344
Actual: $138,830

CCSJ: 0933-05-017

District: Abilene Let Date: FEB 2005
Highway: FM 1054 Let Status: Actual
Project ID: MG 2005(187) CSJ: 0933-05-017
Description: REPLACE STRUCTURES, ADD SHOULDERS, REWORK BASE, 2 COURSE Handling
Code:
NC
Limits From: 8.6 MILES SOUTH OF THE LYNN CO/L Fund Cat: 1
Limits To: US 180 Estimate: $1,646,207
Length: 7.4 Miles Actual: $1,794,316
 
Back...

Totals for 0933-05-017
Length: 7.4 Miles
Estimate: $1,646,207
Actual: $1,794,316

CCSJ: 1531-01-013

District: Abilene Let Date: MAR 2005
Highway: FM 1610 Let Status: Actual
Project ID: CPM 1531-1-13 CSJ: 1531-01-013
Description: SPOT BASE REPAIR Handling
Code:
 
Limits From: US 180 Fund Cat: 1
Limits To: SCURRY COUNTY LINE Estimate: $227,700
Length: 11.3 Miles Actual: $266,118
 
Back...

Totals for 1531-01-013
Length: 11.3 Miles
Estimate: $227,700
Actual: $266,118


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract