CCSJ: 0055-05-047

District: Waco Let Date: NOV 2004
Highway: BU 77-L Let Status: Actual
Project ID: CPM 14-9-92 CSJ: 0014-09-092
Description: SEAL COAT Handling
Code:
 
Limits From: IH 35 Fund Cat: 1
Limits To: US 84 Estimate: $289,507
Length: 5.0 Miles Actual: $372,381
 
District: Waco Let Date: NOV 2004
Highway: IH 35 Let Status: Actual
Project ID: CPM 15-1-201 CSJ: 0015-01-201
Description: SEAL COAT Handling
Code:
 
Limits From: IH 35 @ BU 77-L Fund Cat: 1
Limits To: . Estimate: $7,927
Length: 0.2 Miles Actual: $11,643
 
District: Waco Let Date: NOV 2004
Highway: IH 35 Let Status: Actual
Project ID: CPM 15-14-119 CSJ: 0015-14-119
Description: SEAL COAT Handling
Code:
 
Limits From: FM 93 Fund Cat: 1
Limits To: 0.399 MI S OF LP 363N Estimate: $287,493
Length: 9.1 Miles Actual: $373,392
 
District: Waco Let Date: NOV 2004
Highway: LP 484 Let Status: Actual
Project ID: CPM 49-1-86 CSJ: 0049-01-086
Description: SEAL COAT Handling
Code:
 
Limits From: LP 484 @ SH 6/LP 340 Fund Cat: 1
Limits To: INTERS Estimate: $4,056
Length: 0.1 Miles Actual: $6,411
 
District: Waco Let Date: NOV 2004
Highway: SH 6 Let Status: Actual
Project ID: CPM 49-4-60 CSJ: 0049-04-060
Description: SEAL COAT Handling
Code:
 
Limits From: 4.962 MI N OF FM 413 S Fund Cat: 1
Limits To: 0.188 MI N OF FM 46 Estimate: $178,880
Length: 6.5 Miles Actual: $233,483
 
District: Waco Let Date: NOV 2004
Highway: US 84 Let Status: Actual
Project ID: CPM 55-5-47 CSJ: 0055-05-047
Description: SEAL COAT Handling
Code:
 
Limits From: SH 36 Fund Cat: 1
Limits To: SOUTH MOUNTAIN Estimate: $399,597
Length: 3.3 Miles Actual: $440,960
 
District: Waco Let Date: NOV 2004
Highway: US 84 Let Status: Actual
Project ID: CPM 55-8-102 CSJ: 0055-08-102
Description: SEAL COAT Handling
Code:
 
Limits From: S. BOSQUE RIVER Fund Cat: 1
Limits To: SP 298 Estimate: $2,457
Length: 5.5 Miles Actual: $3,908
 
District: Waco Let Date: NOV 2004
Highway: SH 14 Let Status: Actual
Project ID: CPM 93-4-41 CSJ: 0093-04-041
Description: SEAL COAT Handling
Code:
 
Limits From: 0.057 MI N OF SH 171 Fund Cat: 1
Limits To: 0.451 MI S OF PARK RD 28A Estimate: $217,560
Length: 7.2 Miles Actual: $282,061
 
District: Waco Let Date: NOV 2004
Highway: SH 14 Let Status: Actual
Project ID: CPM 93-5-43 CSJ: 0093-05-043
Description: SEAL COAT Handling
Code:
 
Limits From: 0.451 MI S OF PARK RD 28A Fund Cat: 1
Limits To: 0.6 MI S OF FM 147 Estimate: $255,482
Length: 9.2 Miles Actual: $329,707
 
District: Waco Let Date: NOV 2004
Highway: SH 22 Let Status: Actual
Project ID: CPM 121-1-43 CSJ: 0121-01-043
Description: SEAL COAT Handling
Code:
 
Limits From: FM 219 Fund Cat: 1
Limits To: FM 56 N Estimate: $762
Length: 1.4 Miles Actual: $1,203
 
District: Waco Let Date: NOV 2004
Highway: FM 3118 Let Status: Actual
Project ID: CPM 121-14-4 CSJ: 0121-14-004
Description: SEAL COAT Handling
Code:
 
Limits From: SH 22 Fund Cat: 1
Limits To: 1.5 MI E OF SH 22 Estimate: $25,884
Length: 1.5 Miles Actual: $33,790
 
District: Waco Let Date: NOV 2004
Highway: SH 36 Let Status: Actual
Project ID: CPM 183-4-43 CSJ: 0183-04-043
Description: SEAL COAT Handling
Code:
 
Limits From: HAMILTON CO LINE Fund Cat: 1
Limits To: FM 2955 Estimate: $114,763
Length: 5.8 Miles Actual: $149,886
 
District: Waco Let Date: NOV 2004
Highway: FM 933 Let Status: Actual
Project ID: CPM 209-6-35 CSJ: 0209-06-035
Description: SEAL COAT Handling
Code:
 
Limits From: FM 3370 Fund Cat: 1
Limits To: MCLENNAN CO LINE Estimate: $133,830
Length: 5.8 Miles Actual: $176,036
 
District: Waco Let Date: NOV 2004
Highway: US 190 Let Status: Actual
Project ID: CPM 231-2-49 CSJ: 0231-02-049
Description: SEAL COAT Handling
Code:
 
Limits From: LAMPASAS CO LINE Fund Cat: 1
Limits To: BELL CO LINE Estimate: $315,253
Length: 6.8 Miles Actual: $404,620
 
District: Waco Let Date: NOV 2004
Highway: US 190 Let Status: Actual
Project ID: CPM 231-3-116 CSJ: 0231-03-116
Description: SEAL COAT Handling
Code:
 
Limits From: CORYELL CO LINE Fund Cat: 1
Limits To: W.S. YOUNG Estimate: $309,881
Length: 5.8 Miles Actual: $396,069
 
District: Waco Let Date: NOV 2004
Highway: SP 172 Let Status: Actual
Project ID: CPM 231-7-6 CSJ: 0231-07-006
Description: SEAL COAT Handling
Code:
 
Limits From: MAIN GATE FT HOOD Fund Cat: 1
Limits To: WILLOW SPRINGS RAMP Estimate: $42,820
Length: 0.8 Miles Actual: $55,581
 
District: Waco Let Date: NOV 2004
Highway: SH 53 Let Status: Actual
Project ID: CPM 232-1-47 CSJ: 0232-01-047
Description: SEAL COAT Handling
Code:
 
Limits From: LITTLE FLOCK RD Fund Cat: 1
Limits To: SH 320 Estimate: $249,643
Length: 9.9 Miles Actual: $325,249
 
District: Waco Let Date: NOV 2004
Highway: SH 6 Let Status: Actual
Project ID: CPM 258-3-37 CSJ: 0258-03-037
Description: SEAL COAT Handling
Code:
 
Limits From: US 281 Fund Cat: 1
Limits To: SH 220 Estimate: $9,071
Length: 0.3 Miles Actual: $11,841
 
District: Waco Let Date: NOV 2004
Highway: SH 6 Let Status: Actual
Project ID: CPM 258-9-126 CSJ: 0258-09-126
Description: SEAL COAT Handling
Code:
 
Limits From: SP 412 Fund Cat: 1
Limits To: LP 396 Estimate: $19,541
Length: 6.0 Miles Actual: $30,902
 
District: Waco Let Date: NOV 2004
Highway: LP 396 Let Status: Actual
Project ID: CPM 258-10-41 CSJ: 0258-10-041
Description: SEAL COAT Handling
Code:
 
Limits From: US 84 Fund Cat: 1
Limits To: IH 35 FRTG RD Estimate: $11,232
Length: 2.1 Miles Actual: $17,766
 
District: Waco Let Date: NOV 2004
Highway: SH 7 Let Status: Actual
Project ID: CPM 382-3-26 CSJ: 0382-03-026
Description: SEAL COAT Handling
Code:
 
Limits From: SH 14 Fund Cat: 1
Limits To: ROBERTSON CO LINE Estimate: $230,444
Length: 9.3 Miles Actual: $300,235
 
District: Waco Let Date: NOV 2004
Highway: SH 144 Let Status: Actual
Project ID: CPM 386-3-20 CSJ: 0386-03-020
Description: SEAL COAT Handling
Code:
 
Limits From: SH 144 @ FM 927 W Fund Cat: 1
Limits To: . Estimate: $96
Length: 0.0 Miles Actual: $145
 
District: Waco Let Date: NOV 2004
Highway: SH 317 Let Status: Actual
Project ID: CPM 398-3-53 CSJ: 0398-03-053
Description: SEAL COAT Handling
Code:
 
Limits From: US 84 Fund Cat: 1
Limits To: BELL CO LINE Estimate: $263,292
Length: 12.7 Miles Actual: $341,393
 
District: Waco Let Date: NOV 2004
Highway: FM 56 Let Status: Actual
Project ID: CPM 398-5-10 CSJ: 0398-05-010
Description: SEAL COAT Handling
Code:
 
Limits From: FM 927 Fund Cat: 1
Limits To: FM 2841 Estimate: $522
Length: 0.0 Miles Actual: $827
 
District: Waco Let Date: NOV 2004
Highway: FM 107 Let Status: Actual
Project ID: CPM 513-2-29 CSJ: 0513-02-029
Description: SEAL COAT Handling
Code:
 
Limits From: SH 317 Fund Cat: 1
Limits To: IH 35 Estimate: $29,531
Length: 1.6 Miles Actual: $37,724
 
District: Waco Let Date: NOV 2004
Highway: FM 107 Let Status: Actual
Project ID: CPM 567-5-16 CSJ: 0567-05-016
Description: SEAL COAT Handling
Code:
 
Limits From: CORYELL CO LINE Fund Cat: 1
Limits To: SH 317 Estimate: $70,258
Length: 4.2 Miles Actual: $91,529
 
District: Waco Let Date: NOV 2004
Highway: FM 219 Let Status: Actual
Project ID: CPM 724-2-22 CSJ: 0724-02-022
Description: SEAL COAT Handling
Code:
 
Limits From: FM 219 @ FM 1991 Fund Cat: 1
Limits To: . Estimate: $111
Length: 0.0 Miles Actual: $176
 
District: Waco Let Date: NOV 2004
Highway: FM 439 Let Status: Actual
Project ID: CPM 836-3-51 CSJ: 0836-03-051
Description: SEAL COAT Handling
Code:
 
Limits From: 0.13 MI E OF EAST GATE FT HOOD Fund Cat: 1
Limits To: FM 2271 Estimate: $487,413
Length: 16.8 Miles Actual: $627,716
 
District: Waco Let Date: NOV 2004
Highway: FM 933 Let Status: Actual
Project ID: CPM 1190-2-12 CSJ: 1190-02-012
Description: SEAL COAT Handling
Code:
 
Limits From: FM 3370 Fund Cat: 1
Limits To: FM 310 Estimate: $63,233
Length: 2.9 Miles Actual: $83,140
 
District: Waco Let Date: NOV 2004
Highway: FM 485 Let Status: Actual
Project ID: CPM 2133-1-9 CSJ: 2133-01-009
Description: SEAL COAT Handling
Code:
 
Limits From: SH 53 Fund Cat: 1
Limits To: MILAM CO LINE Estimate: $116,266
Length: 6.2 Miles Actual: $152,819
 
District: Waco Let Date: NOV 2004
Highway: FM 2271 Let Status: Actual
Project ID: CPM 2137-1-15 CSJ: 2137-01-015
Description: SEAL COAT Handling
Code:
 
Limits From: 0.881 MI S OF FM 2305 Fund Cat: 1
Limits To: FM 439 Estimate: $25,441
Length: 1.2 Miles Actual: $32,533
 
District: Waco Let Date: NOV 2004
Highway: FM 439 Let Status: Actual
Project ID: CPM 2137-1-16 CSJ: 2137-01-016
Description: SEAL COAT Handling
Code:
 
Limits From: FM 2271 Fund Cat: 1
Limits To: SH 317 Estimate: $72,499
Length: 1.9 Miles Actual: $91,534
 
District: Waco Let Date: NOV 2004
Highway: FM 2410 Let Status: Actual
Project ID: CPM 2304-2-31 CSJ: 2304-02-031
Description: SEAL COAT Handling
Code:
 
Limits From: FM 3481 Fund Cat: 1
Limits To: SIMMONS RD Estimate: $128,479
Length: 6.6 Miles Actual: $165,293
 
District: Waco Let Date: NOV 2004
Highway: FM 2114 Let Status: Actual
Project ID: CPM 2305-1-13 CSJ: 2305-01-013
Description: SEAL COAT Handling
Code:
 
Limits From: FM 56 Fund Cat: 1
Limits To: HILL CO LINE Estimate: $76,861
Length: 5.2 Miles Actual: $100,807
 
District: Waco Let Date: NOV 2004
Highway: FM 2491 Let Status: Actual
Project ID: CPM 2395-1-11 CSJ: 2395-01-011
Description: SEAL COAT Handling
Code:
 
Limits From: LP 340 Fund Cat: 1
Limits To: 5.65 MI E OF LP 340 Estimate: $88,216
Length: 5.6 Miles Actual: $115,786
 
District: Waco Let Date: NOV 2004
Highway: FM 1713 Let Status: Actual
Project ID: CPM 2547-1-10 CSJ: 2547-01-010
Description: SEAL COAT Handling
Code:
 
Limits From: 3.845 MI W OF FM 933 Fund Cat: 1
Limits To: FM 933 Estimate: $62,941
Length: 3.8 Miles Actual: $82,399
 
District: Waco Let Date: NOV 2004
Highway: FM 3219 Let Status: Actual
Project ID: CPM 2696-1-10 CSJ: 2696-01-010
Description: SEAL COAT Handling
Code:
 
Limits From: FM 439 Fund Cat: 1
Limits To: BU 190 Estimate: $29,377
Length: 1.4 Miles Actual: $38,126
 
District: Waco Let Date: NOV 2004
Highway: FM 2837 Let Status: Actual
Project ID: CPM 2868-1-8 CSJ: 2868-01-008
Description: SEAL COAT Handling
Code:
 
Limits From: IH 35 Fund Cat: 1
Limits To: US 77 Estimate: $137,302
Length: 7.6 Miles Actual: $180,244
 
District: Waco Let Date: NOV 2004
Highway: FM 2960 Let Status: Actual
Project ID: CPM 3031-1-5 CSJ: 3031-01-005
Description: SEAL COAT Handling
Code:
 
Limits From: SH 22 Fund Cat: 1
Limits To: 2.3 MI S OF SH 22 Estimate: $26,619
Length: 2.3 Miles Actual: $34,857
 
District: Waco Let Date: NOV 2004
Highway: FM 1713 Let Status: Actual
Project ID: CPM 3228-2-11 CSJ: 3228-02-011
Description: SEAL COAT Handling
Code:
 
Limits From: FM 56 Fund Cat: 1
Limits To: HILL CO LINE Estimate: $100,969
Length: 5.5 Miles Actual: $132,466
 
District: Waco Let Date: NOV 2004
Highway: FM 1713 Let Status: Actual
Project ID: CPM 3228-3-7 CSJ: 3228-03-007
Description: SEAL COAT Handling
Code:
 
Limits From: BOSQUE CO LINE Fund Cat: 1
Limits To: FM 1713 Estimate: $10,220
Length: 0.6 Miles Actual: $13,283
 
District: Waco Let Date: NOV 2004
Highway: FM 2837 Let Status: Actual
Project ID: CPM 3521-1-11 CSJ: 3521-01-011
Description: SEAL COAT Handling
Code:
 
Limits From: 1.3 MI N OF FM 2113 Fund Cat: 1
Limits To: IH 35 Estimate: $106,648
Length: 4.3 Miles Actual: $136,809
 
Back...

Totals for 0055-05-047
Length: 192.0 Miles
Estimate: $5,002,377
Actual: $6,416,730

CCSJ: 0184-01-048

District: Waco Let Date: OCT 2004
Highway: SH 36 Let Status: Actual
Project ID: STP 2001(444) CSJ: 0184-01-048
Description: WIDEN ROADWAY Handling
Code:
 
Limits From: SOUTH END OF LEON RV BRDG Fund Cat: 11
Limits To: 0.168 MI S OF BS 36E Estimate: $7,047,785
Length: 3.0 Miles Actual: $6,486,476
 
Back...

Totals for 0184-01-048
Length: 3.0 Miles
Estimate: $7,047,785
Actual: $6,486,476

CCSJ: 0867-02-012

District: Waco Let Date: DEC 2004
Highway: FM 46 Let Status: Actual
Project ID: CPM 49-13-6 CSJ: 0049-13-006
Description: EMULSION Handling
Code:
 
Limits From: SH 6 Fund Cat: 1
Limits To: ROBERTSON CO LINE Estimate: $63,418
Length: 2.8 Miles Actual: $59,624
 
District: Waco Let Date: DEC 2004
Highway: FM 1048 Let Status: Actual
Project ID: CPM 808-1-50 CSJ: 0808-01-050
Description: EMULSION Handling
Code:
 
Limits From: LP 265 Fund Cat: 1
Limits To: FM 2027 Estimate: $74,680
Length: 5.2 Miles Actual: $69,723
 
District: Waco Let Date: DEC 2004
Highway: FM 932 Let Status: Actual
Project ID: CPM 867-2-12 CSJ: 0867-02-012
Description: EMULSION Handling
Code:
 
Limits From: HAMILTON CO LINE Fund Cat: 1
Limits To: 0.48 MI N OF FM 1241 Estimate: $222,646
Length: 6.8 Miles Actual: $117,666
 
District: Waco Let Date: DEC 2004
Highway: FM 932 Let Status: Actual
Project ID: CPM 867-3-24 CSJ: 0867-03-024
Description: EMULSION Handling
Code:
 
Limits From: .48 MI N OF FM 1241 Fund Cat: 1
Limits To: US 84 Estimate: $18,723
Length: 1.2 Miles Actual: $17,556
 
District: Waco Let Date: DEC 2004
Highway: FM 221 Let Status: Actual
Project ID: CPM 936-1-16 CSJ: 0936-01-016
Description: EMULSION Handling
Code:
 
Limits From: FM 218 Fund Cat: 1
Limits To: FM 2005 Estimate: $65,848
Length: 4.9 Miles Actual: $61,382
 
District: Waco Let Date: DEC 2004
Highway: FM 1950 Let Status: Actual
Project ID: CPM 1077-2-14 CSJ: 1077-02-014
Description: EMULSION Handling
Code:
 
Limits From: FM 1239 Fund Cat: 1
Limits To: US 77 Estimate: $113,865
Length: 7.6 Miles Actual: $106,008
 
District: Waco Let Date: DEC 2004
Highway: FM 936 Let Status: Actual
Project ID: CPM 1191-1-1 CSJ: 1191-01-001
Description: EMULSION Handling
Code:
 
Limits From: SH 31 Fund Cat: 1
Limits To: LIMESTONE CO LINE Estimate: $56,083
Length: 4.0 Miles Actual: $52,477
 
District: Waco Let Date: DEC 2004
Highway: FM 936 Let Status: Actual
Project ID: CPM 1191-2-1 CSJ: 1191-02-001
Description: EMULSION Handling
Code:
 
Limits From: HILL CO LINE Fund Cat: 1
Limits To: FM 73 Estimate: $109,646
Length: 7.7 Miles Actual: $102,315
 
District: Waco Let Date: DEC 2004
Highway: FM 1239 Let Status: Actual
Project ID: CPM 1372-1-9 CSJ: 1372-01-009
Description: EMULSION Handling
Code:
 
Limits From: IH 35 Fund Cat: 1
Limits To: FALLS CO LINE Estimate: $2,509
Length: 0.1 Miles Actual: $2,225
 
District: Waco Let Date: DEC 2004
Highway: FM 1239 Let Status: Actual
Project ID: CPM 1372-2-13 CSJ: 1372-02-013
Description: EMULSION Handling
Code:
 
Limits From: MCLENNAN CO LINE Fund Cat: 1
Limits To: 1.312 MI W OF FM 1950 Estimate: $106,336
Length: 7.3 Miles Actual: $99,029
 
District: Waco Let Date: DEC 2004
Highway: FM 1243 Let Status: Actual
Project ID: CPM 1374-1-12 CSJ: 1374-01-012
Description: EMULSION Handling
Code:
 
Limits From: US 77 Fund Cat: 1
Limits To: SH 22 Estimate: $60,967
Length: 4.4 Miles Actual: $57,022
 
District: Waco Let Date: DEC 2004
Highway: FM 1243 Let Status: Actual
Project ID: CPM 1374-2-8 CSJ: 1374-02-008
Description: EMULSION Handling
Code:
 
Limits From: SH 22 Fund Cat: 1
Limits To: SH 171 Estimate: $113,195
Length: 6.2 Miles Actual: $106,280
 
District: Waco Let Date: DEC 2004
Highway: FM 339 Let Status: Actual
Project ID: CPM 1662-1-13 CSJ: 1662-01-013
Description: EMULSION Handling
Code:
 
Limits From: FM 2114 Fund Cat: 1
Limits To: SH 31 Estimate: $144,206
Length: 9.4 Miles Actual: $134,982
 
District: Waco Let Date: DEC 2004
Highway: FM 339 Let Status: Actual
Project ID: CPM 1662-2-11 CSJ: 1662-02-011
Description: EMULSION Handling
Code:
 
Limits From: SH 31 Fund Cat: 1
Limits To: LIMESTONE CO LINE Estimate: $24,215
Length: 1.8 Miles Actual: $22,779
 
District: Waco Let Date: DEC 2004
Highway: FM 339 Let Status: Actual
Project ID: CPM 1662-3-10 CSJ: 1662-03-010
Description: EMULSION Handling
Code:
 
Limits From: HILL CO LINE Fund Cat: 1
Limits To: FM 73 Estimate: $117,881
Length: 8.4 Miles Actual: $109,912
 
District: Waco Let Date: DEC 2004
Highway: FM 339 Let Status: Actual
Project ID: CPM 1662-4-4 CSJ: 1662-04-004
Description: EMULSION Handling
Code:
 
Limits From: FM 73 Fund Cat: 1
Limits To: US 84 Estimate: $6,706
Length: 0.4 Miles Actual: $6,664
 
District: Waco Let Date: DEC 2004
Highway: FM 2086 Let Status: Actual
Project ID: CPM 1924-1-11 CSJ: 1924-01-011
Description: EMULSION Handling
Code:
 
Limits From: FM 438 Fund Cat: 1
Limits To: SH 53 Estimate: $121,869
Length: 8.0 Miles Actual: $113,779
 
District: Waco Let Date: DEC 2004
Highway: FM 2005 Let Status: Actual
Project ID: CPM 1927-2-12 CSJ: 1927-02-012
Description: EMULSION Handling
Code:
 
Limits From: MILLS CO LINE Fund Cat: 1
Limits To: FM 221 Estimate: $119,693
Length: 7.6 Miles Actual: $111,452
 
District: Waco Let Date: DEC 2004
Highway: FM 2005 Let Status: Actual
Project ID: CPM 1927-3-12 CSJ: 1927-03-012
Description: EMULSION Handling
Code:
 
Limits From: FM 221 Fund Cat: 1
Limits To: FM 218 Estimate: $150,779
Length: 9.8 Miles Actual: $140,586
 
District: Waco Let Date: DEC 2004
Highway: FM 2486 Let Status: Actual
Project ID: CPM 2391-2-6 CSJ: 2391-02-006
Description: EMULSION Handling
Code:
 
Limits From: COMANCHE CO LINE Fund Cat: 1
Limits To: FM 218 Estimate: $131,134
Length: 8.4 Miles Actual: $122,804
 
District: Waco Let Date: DEC 2004
Highway: FM 2488 Let Status: Actual
Project ID: CPM 2392-2-7 CSJ: 2392-02-007
Description: EMULSION Handling
Code:
 
Limits From: JOHNSON CO LINE Fund Cat: 1
Limits To: FM 67 Estimate: $60,827
Length: 4.3 Miles Actual: $56,792
 
District: Waco Let Date: DEC 2004
Highway: FM 964 Let Status: Actual
Project ID: CPM 2503-1-5 CSJ: 2503-01-005
Description: EMULSION Handling
Code:
 
Limits From: FM 485 Fund Cat: 1
Limits To: 1.14 MI S OF FM 485 Estimate: $16,219
Length: 1.1 Miles Actual: $15,203
 
District: Waco Let Date: DEC 2004
Highway: FM 940 Let Status: Actual
Project ID: CPM 2504-1-7 CSJ: 2504-01-007
Description: EMULSION Handling
Code:
 
Limits From: FM 437 Fund Cat: 1
Limits To: FM 485 Estimate: $74,288
Length: 5.1 Miles Actual: $69,635
 
District: Waco Let Date: DEC 2004
Highway: FM 2841 Let Status: Actual
Project ID: CPM 2869-1-6 CSJ: 2869-01-006
Description: EMULSION Handling
Code:
 
Limits From: FM 56 Fund Cat: 1
Limits To: 2.38 MI E OF FM 56 Estimate: $50,209
Length: 2.4 Miles Actual: $47,381
 
District: Waco Let Date: DEC 2004
Highway: FM 2957 Let Status: Actual
Project ID: CPM 3032-1-6 CSJ: 3032-01-006
Description: EMULSION Handling
Code:
 
Limits From: FM 2491 Fund Cat: 1
Limits To: FM 939 Estimate: $178,093
Length: 8.9 Miles Actual: $167,867
 
District: Waco Let Date: DEC 2004
Highway: FM 3117 Let Status: Actual
Project ID: CPM 3157-1-8 CSJ: 3157-01-008
Description: EMULSION Handling
Code:
 
Limits From: US 190 Fund Cat: 1
Limits To: SH 53 Estimate: $122,740
Length: 6.0 Miles Actual: $115,960
 
Back...

Totals for 0867-02-012
Length: 139.8 Miles
Estimate: $2,326,775
Actual: $2,087,103

CCSJ: 0909-39-108

District: Waco Let Date: MAY 2005
Highway: FM 930 Let Status: Actual
Project ID: BR 2005(100) CSJ: 0774-07-012
Description: REPLACE BRIDGE AND APPROACHES AND REALIGN ROADWAY Handling
Code:
 
Limits From: @ PLUM CREEK Fund Cat: 6
Limits To: (STR #001) Estimate: $617,377
Length: 0.3 Miles Actual: $626,634
 
District: Waco Let Date: MAY 2005
Highway: CR Let Status: Actual
Project ID: BR 2004(363) CSJ: 0909-39-108
Description: REPLACE BRIDGE AND APPROACHES Handling
Code:
 
Limits From: ON CR 363 @ N BEE HOUSE CREEK Fund Cat: 6
Limits To: (MAP #33) Estimate: $360,516
Length: 0.1 Miles Actual: $356,216
 
Back...

Totals for 0909-39-108
Length: 0.4 Miles
Estimate: $977,893
Actual: $982,850

CCSJ: 0909-39-111

District: Waco Let Date: JUN 2005
Highway: VA Let Status: Actual
Project ID: STP 2005(696) CSJ: 0909-39-111
Description: DISTRICTWIDE PAVEMENT MARKINGS Handling
Code:
 
Limits From: @ VARIOUS LOCATIONS Fund Cat: 1
Limits To: IN WACO DISTRICT Estimate: $176,024
Length: 0.0 Miles Actual: $171,433
 
Bid Tabulations
Back...

Totals for 0909-39-111
Length: 0.0 Miles
Estimate: $176,024
Actual: $171,433


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract