Detail Letting Schedule for Dimmit County (FY 2006)
Detail Letting Schedule for Dimmit County (FY 2006) | ||||
Last Update: Monday, August 28, 2006 |
Dimmit County (FY 2006) |
CCSJ: 0037-06-073 | |||
District: | Laredo | Let Date: | APR 2006 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | NH 2006(453) | CSJ: | 0037-06-073 |
Description: | REHABILITATION OF AN EXISTING ROADWAY | Handling Code: |
|
Limits From: | 0.1 MI SOUTH OF US 277 IN CARRIZO | Fund Cat: | 1 |
Limits To: | NORTH CITY LIMIT OF ASHERTON | Estimate: | $6,006,072 |
Length: | 7.7 Miles | Actual: | $5,359,123 |
Back... |
Totals for 0037-06-073 | ||
---|---|---|---|
Length: | 7.7 Miles | ||
Estimate: | $6,006,072 | ||
Actual: | $5,359,123 | ||
CCSJ: 0301-01-065 | |||
District: | Laredo | Let Date: | JUN 2006 |
Highway: | SH 85 | Let Status: | Actual |
Project ID: | STP 2006(614) | CSJ: | 0301-01-065 |
Description: | RECONSTRUCT EXISTING ROADWAY | Handling Code: |
|
Limits From: | FM 1556 | Fund Cat: | 1 |
Limits To: | FM 190 | Estimate: | $8,446,414 |
Length: | 10.7 Miles | Actual: | $7,680,776 |
Bid Tabulations Back... |
Totals for 0301-01-065 | ||
Length: | 10.7 Miles | ||
Estimate: | $8,446,414 | ||
Actual: | $7,680,776 | ||
CCSJ: 0922-49-003 | |||
District: | Laredo | Let Date: | APR 2006 |
Highway: | CR | Let Status: | Actual |
Project ID: | BR 2005(347) | CSJ: | 0922-49-003 |
Description: | FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING | Handling Code: |
|
Limits From: | ON CR 1936 AT DRAW | Fund Cat: | 6 |
Limits To: | 0.10 MI N OF US 277 | Estimate: | $265,639 |
Length: | 0.5 Miles | Actual: | $220,969 |
Back... |
Totals for 0922-49-003 | ||
Length: | 0.5 Miles | ||
Estimate: | $265,639 | ||
Actual: | $220,969 |
|
|