Detail Letting Schedule for Callahan County (FY 2007)
Detail Letting Schedule for Callahan County (FY 2007) | ||||
Last Update: Monday, July 30, 2007 |
Callahan County (FY 2007) |
CCSJ: 0006-07-068 | |||
District: | Abilene | Let Date: | APR 2007 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | IM 0202(220) | CSJ: | 0006-07-068 |
Description: | PLANE ASPHALT CONRETE PAVEMENT, UNDERSEAL, ASPHALT CONCRETE | Handling Code: |
|
Limits From: | 0.478 MILES EAST OF FM 1707 | Fund Cat: | 1 |
Limits To: | BAIRD WEST CITY LIMIT | Estimate: | $3,474,520 |
Length: | 6.3 Miles | Actual: | $3,190,292 |
District: | Abilene | Let Date: | APR 2007 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | STP 2007(424)HES | CSJ: | 0006-07-069 |
Description: | INSTALL CABLE BARRIER | Handling Code: |
|
Limits From: | TAYLOR COUNTY LINE | Fund Cat: | 8 |
Limits To: | WEST BAIRD CITY LIMIT | Estimate: | $1,808,286 |
Length: | 12.9 Miles | Actual: | $1,183,734 |
District: | Abilene | Let Date: | APR 2007 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | IM 0202(220) | CSJ: | 0007-01-051 |
Description: | UNDERSEAL, ASPHALTIC CONCRETE PAVEMENT, METAL BEAM GUARD | Handling Code: |
|
Limits From: | 0.539 MILES EAST OF FM 2228 | Fund Cat: | 1 |
Limits To: | 0.3 MILES EAST OF MEXIA CREEK | Estimate: | $463,004 |
Length: | 1.5 Miles | Actual: | $418,744 |
District: | Abilene | Let Date: | APR 2007 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | STP 2007(424)HES | CSJ: | 0007-01-052 |
Description: | INSTALL CABLE BARRIER | Handling Code: |
|
Limits From: | WEST BAIRD CITY LIMITS | Fund Cat: | 8 |
Limits To: | .2 MI E OF MEXIA CREEK | Estimate: | $1,117,578 |
Length: | 8.7 Miles | Actual: | $727,674 |
Back... |
Totals for 0006-07-068 | ||
---|---|---|---|
Length: | 29.4 Miles | ||
Estimate: | $6,863,388 | ||
Actual: | $5,520,444 | ||
CCSJ: 0006-07-071 | |||
District: | Abilene | Let Date: | APR 2007 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | CPM 6-7-71 | CSJ: | 0006-07-071 |
Description: | MICROSURFACING | Handling Code: |
|
Limits From: | FM 1707 | Fund Cat: | 1 |
Limits To: | CHERRY LANE IN CLYDE(FRTG RDS ONLY) | Estimate: | $372,055 |
Length: | 2.2 Miles | Actual: | $315,704 |
District: | Abilene | Let Date: | APR 2007 |
Highway: | FM 89 | Let Status: | Actual |
Project ID: | CPM 699-1-45 | CSJ: | 0699-01-045 |
Description: | MICROSURFACING | Handling Code: |
|
Limits From: | FM 613 | Fund Cat: | 1 |
Limits To: | FM 1235 | Estimate: | $118,590 |
Length: | 1.6 Miles | Actual: | $91,883 |
District: | Abilene | Let Date: | APR 2007 |
Highway: | FM 1750 | Let Status: | Actual |
Project ID: | CPM 1655-1-23 | CSJ: | 1655-01-023 |
Description: | MICROSURFACING | Handling Code: |
|
Limits From: | SH 36(SE 11TH ST) IN ABILENE | Fund Cat: | 1 |
Limits To: | FM 204 | Estimate: | $739,322 |
Length: | 7.6 Miles | Actual: | $605,041 |
District: | Abilene | Let Date: | APR 2007 |
Highway: | LP 322 | Let Status: | Actual |
Project ID: | CPM 2398-1-40 | CSJ: | 2398-01-040 |
Description: | MICROSURFACING | Handling Code: |
|
Limits From: | IH 20 | Fund Cat: | 1 |
Limits To: | FM 1750 | Estimate: | $982,270 |
Length: | 4.1 Miles | Actual: | $803,445 |
District: | Abilene | Let Date: | APR 2007 |
Highway: | FM 1707 | Let Status: | Actual |
Project ID: | CPM 3603-1-4 | CSJ: | 3603-01-004 |
Description: | MICROSURFACING ML, SEAL COAT SHLDRS | Handling Code: |
|
Limits From: | IH 20 SFR | Fund Cat: | 1 |
Limits To: | FM 18 | Estimate: | $57,144 |
Length: | 0.6 Miles | Actual: | $48,232 |
Back... |
Totals for 0006-07-071 | ||
Length: | 16.1 Miles | ||
Estimate: | $2,269,381 | ||
Actual: | $1,864,305 | ||
CCSJ: 0007-01-053 | |||
District: | Abilene | Let Date: | NOV 2006 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | CPM 7-1-53 | CSJ: | 0007-01-053 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 2407 | Fund Cat: | 1 |
Limits To: | MEXIA CREEK_(FRONTAGE ROADS ONLY) | Estimate: | $431,298 |
Length: | 8.8 Miles | Actual: | $278,775 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | IH 20 | Let Status: | Actual |
Project ID: | CPM 7-2-46 | CSJ: | 0007-02-046 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | MEXIA CREEK_(FRONTAGE ROADS ONLY) | Fund Cat: | 1 |
Limits To: | EASTLAND COUNTY LINE | Estimate: | $200,534 |
Length: | 6.0 Miles | Actual: | $175,938 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | CPM 32-7-25 | CSJ: | 0032-07-025 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | KING COUNTY LINE | Fund Cat: | 1 |
Limits To: | 36 MILES SOUTH OF FM 1263 | Estimate: | $152,052 |
Length: | 3.7 Miles | Actual: | $133,640 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | SH 283 | Let Status: | Actual |
Project ID: | CPM 106-7-23 | CSJ: | 0106-07-023 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 6 | Fund Cat: | 1 |
Limits To: | STONEWALL CO. LINE | Estimate: | $222,180 |
Length: | 6.2 Miles | Actual: | $200,746 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 601 | Let Status: | Actual |
Project ID: | CPM 107-3-16 | CSJ: | 0107-03-016 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 6 | Fund Cat: | 1 |
Limits To: | FM 576 | Estimate: | $262,178 |
Length: | 12.7 Miles | Actual: | $256,501 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | US 180 | Let Status: | Actual |
Project ID: | CPM 296-4-18 | CSJ: | 0296-04-018 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FISHER CO. LINE | Fund Cat: | 1 |
Limits To: | ANSON WEST CITY LIMIT | Estimate: | $612,714 |
Length: | 14.4 Miles | Actual: | $567,410 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | US 180 | Let Status: | Actual |
Project ID: | CPM 296-5-29 | CSJ: | 0296-05-029 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | ANSON EAST CITY LIMIT | Fund Cat: | 1 |
Limits To: | FM 1226 | Estimate: | $191,645 |
Length: | 4.9 Miles | Actual: | $177,197 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | US 380 | Let Status: | Actual |
Project ID: | CPM 360-1-18 | CSJ: | 0360-01-018 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | .562 MILES EAST OF FM 1835 | Fund Cat: | 1 |
Limits To: | HASKELL COUNTY LINE | Estimate: | $178,649 |
Length: | 4.2 Miles | Actual: | $157,055 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | US 380 | Let Status: | Actual |
Project ID: | CPM 360-2-26 | CSJ: | 0360-02-026 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 6 | Fund Cat: | 1 |
Limits To: | STONEWALL CO. LINE | Estimate: | $267,129 |
Length: | 5.9 Miles | Actual: | $234,866 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | US 283 | Let Status: | Actual |
Project ID: | CPM 437-3-38 | CSJ: | 0437-03-038 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | T&P LAKE ENTERANCE | Fund Cat: | 1 |
Limits To: | 7.43 MILES SOUTH | Estimate: | $287,108 |
Length: | 7.3 Miles | Actual: | $252,034 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | SH 206 | Let Status: | Actual |
Project ID: | CPM 480-3-38 | CSJ: | 0480-03-038 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 880 | Fund Cat: | 1 |
Limits To: | SH 279 "Y" | Estimate: | $87,679 |
Length: | 1.7 Miles | Actual: | $81,278 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 126 | Let Status: | Actual |
Project ID: | CPM 733-1-14 | CSJ: | 0733-01-014 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 83 | Fund Cat: | 1 |
Limits To: | US 180 | Estimate: | $199,823 |
Length: | 8.3 Miles | Actual: | $188,602 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 126 | Let Status: | Actual |
Project ID: | CPM 733-2-20 | CSJ: | 0733-02-020 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 180 | Fund Cat: | 1 |
Limits To: | 3 MI. NORTH OF TAYLOR CO. LINE | Estimate: | $322,590 |
Length: | 15.5 Miles | Actual: | $305,808 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 600 | Let Status: | Actual |
Project ID: | CPM 972-6-10 | CSJ: | 0972-06-010 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 618 | Fund Cat: | 1 |
Limits To: | JONES CO. LINE | Estimate: | $182,906 |
Length: | 7.8 Miles | Actual: | $164,568 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 604 | Let Status: | Actual |
Project ID: | CPM 974-6-11 | CSJ: | 0974-06-011 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SHACKELFORD COUNTY LINE | Fund Cat: | 1 |
Limits To: | IH 20 | Estimate: | $209,721 |
Length: | 8.2 Miles | Actual: | $188,528 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 3522 | Let Status: | Actual |
Project ID: | CPM 974-8-5 | CSJ: | 0974-08-005 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1082 | Fund Cat: | 1 |
Limits To: | END OF MAINTENANCE | Estimate: | $72,915 |
Length: | 2.4 Miles | Actual: | $69,121 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 600 | Let Status: | Actual |
Project ID: | CPM 985-2-9 | CSJ: | 0985-02-009 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 380 | Fund Cat: | 1 |
Limits To: | FM 618 | Estimate: | $185,438 |
Length: | 9.0 Miles | Actual: | $167,430 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 576 | Let Status: | Actual |
Project ID: | CPM 1031-4-20 | CSJ: | 1031-04-020 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | SH 6 | Fund Cat: | 1 |
Limits To: | STEPHENS COUNTY LINE | Estimate: | $199,197 |
Length: | 10.6 Miles | Actual: | $195,120 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 382 | Let Status: | Actual |
Project ID: | CPM 1070-2-8 | CSJ: | 1070-02-008 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 604 | Fund Cat: | 1 |
Limits To: | RUNNELS COUNTY LINE | Estimate: | $70,183 |
Length: | 3.4 Miles | Actual: | $60,140 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 1226 | Let Status: | Actual |
Project ID: | CPM 1360-1-24 | CSJ: | 1360-01-024 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1636 | Fund Cat: | 1 |
Limits To: | US 180 | Estimate: | $183,043 |
Length: | 8.1 Miles | Actual: | $173,851 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 1226 | Let Status: | Actual |
Project ID: | CPM 1360-2-7 | CSJ: | 1360-02-007 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 180 | Fund Cat: | 1 |
Limits To: | FM 1082 | Estimate: | $257,523 |
Length: | 12.3 Miles | Actual: | $244,460 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 1636 | Let Status: | Actual |
Project ID: | CPM 2187-2-10 | CSJ: | 2187-02-010 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 1226 | Fund Cat: | 1 |
Limits To: | SH 6 | Estimate: | $104,175 |
Length: | 4.9 Miles | Actual: | $102,070 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 2976 | Let Status: | Actual |
Project ID: | CPM 2536-1-9 | CSJ: | 2536-01-009 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 600 | Fund Cat: | 1 |
Limits To: | 2.954 MILES NORTH | Estimate: | $64,928 |
Length: | 3.0 Miles | Actual: | $58,317 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | SH 206 | Let Status: | Actual |
Project ID: | CPM 2638-2-7 | CSJ: | 2638-02-007 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | EASTLAND CO. LINE | Fund Cat: | 1 |
Limits To: | FM 880 | Estimate: | $189,437 |
Length: | 4.8 Miles | Actual: | $175,280 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 3217 | Let Status: | Actual |
Project ID: | CPM 3349-2-5 | CSJ: | 3349-02-005 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 604 | Fund Cat: | 1 |
Limits To: | 3.687 MILES EAST | Estimate: | $75,863 |
Length: | 3.7 Miles | Actual: | $66,909 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 3326 | Let Status: | Actual |
Project ID: | CPM 3455-1-7 | CSJ: | 3455-01-007 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | US 83 | Fund Cat: | 1 |
Limits To: | FM 1226 | Estimate: | $216,456 |
Length: | 8.9 Miles | Actual: | $204,318 |
District: | Abilene | Let Date: | NOV 2006 |
Highway: | FM 3368 | Let Status: | Actual |
Project ID: | CPM 3456-1-6 | CSJ: | 3456-01-006 |
Description: | SEAL COAT | Handling Code: |
|
Limits From: | FM 3326 | Fund Cat: | 1 |
Limits To: | FM 1226 | Estimate: | $41,337 |
Length: | 2.0 Miles | Actual: | $39,108 |
Back... |
Totals for 0007-01-053 | ||
Length: | 188.7 Miles | ||
Estimate: | $5,468,701 | ||
Actual: | $4,919,070 | ||
CCSJ: 0007-12-005 | |||
District: | Abilene | Let Date: | FEB 2007 |
Highway: | BI 20-T | Let Status: | Actual |
Project ID: | CL 7-12-5 | CSJ: | 0007-12-005 |
Description: | LANDSCAPE IMPROVEMENTS | Handling Code: |
|
Limits From: | IH S FTG RD | Fund Cat: | 10 |
Limits To: | APPROX 0.5 MI EAST | Estimate: | $65,000 |
Length: | 0.5 Miles | Actual: | $55,001 |
Back... |
Totals for 0007-12-005 | ||
Length: | 0.5 Miles | ||
Estimate: | $65,000 | ||
Actual: | $55,001 | ||
CCSJ: 0908-34-020 | |||
District: | Abilene | Let Date: | SEP 2006 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2002(100)TE | CSJ: | 0908-34-020 |
Description: | REHABILITATION OF HISTORICAL TRANSPORTATION BUILDING | Handling Code: |
LN |
Limits From: | 1911 T&P RAILROAD DEPOT VISITOR | Fund Cat: | 9 |
Limits To: | CENTER | Estimate: | $1,480,630 |
Length: | 0.0 Miles | Actual: | $1,069,897 |
Back... |
Totals for 0908-34-020 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,480,630 | ||
Actual: | $1,069,897 | ||
CCSJ: 1778-01-008 | |||
District: | Abilene | Let Date: | OCT 2006 |
Highway: | FM 1864 | Let Status: | Actual |
Project ID: | BR 2006(758) | CSJ: | 1778-01-008 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
NC |
Limits From: | AT BATTLE CREEK | Fund Cat: | 1 |
Limits To: | ON FM 1864 | Estimate: | $587,028 |
Length: | 0.9 Miles | Actual: | $605,099 |
District: | Abilene | Let Date: | OCT 2006 |
Highway: | FM 2228 | Let Status: | Actual |
Project ID: | BR 2006(758) | CSJ: | 2108-01-015 |
Description: | REPLACE BRIDGE AND APPROACHES | Handling Code: |
|
Limits From: | ON FM 2228 (PSN 3) | Fund Cat: | 1 |
Limits To: | AT DRAW | Estimate: | $325,091 |
Length: | 1.1 Miles | Actual: | $320,532 |
Back... |
Totals for 1778-01-008 | ||
Length: | 2.0 Miles | ||
Estimate: | $912,119 | ||
Actual: | $925,631 |
|
|