Detail Letting Schedule for Presidio County (FY 2009)

 
 
Last Update: Monday, November 9, 2009
Presidio County (FY 2009)

CCSJ: 0104-06-023

District: El Paso Let Date: DEC 2008
Highway: SH 17 Let Status: Actual
Project ID: STP 2009(160) CSJ: 0104-05-023
Description: 2009 SEAL COAT Handling
Code:
 
Limits From: NORTH CITY LIMIT OF MARFA Fund Cat: 1
Limits To: JCT OF US 67/90 Estimate: $76,393
Length: 0.7 Miles Actual: $65,101
 
District: El Paso Let Date: DEC 2008
Highway: US 67 Let Status: Actual
Project ID: STP 2009(160) CSJ: 0104-06-023
Description: 2009 SEAL COAT Handling
Code:
 
Limits From: JCT OF US 67/90 Fund Cat: 1
Limits To: 15.15 MILES SOUTH OF MARFA Estimate: $1,279,055
Length: 15.2 Miles Actual: $1,060,122
 
District: El Paso Let Date: DEC 2008
Highway: US 67 Let Status: Actual
Project ID: STP 2009(160) CSJ: 0104-07-020
Description: 2009 SEAL COAT Handling
Code:
 
Limits From: 15.15 MI SOUTH OF JCT US 67/90 Fund Cat: 1
Limits To: 32.28 MI SOUTH OF JCT US 67/90 Estimate: $1,101,081
Length: 17.0 Miles Actual: $945,734
 
District: El Paso Let Date: DEC 2008
Highway: SH 54 Let Status: Actual
Project ID: STP 2009(160) CSJ: 0233-03-015
Description: 2009 SEAL COAT Handling
Code:
 
Limits From: JCT OF US 62/180 & SH 54 Fund Cat: 1
Limits To: 6.065 MILES SOUTH Estimate: $322,976
Length: 6.1 Miles Actual: $276,802
 
District: El Paso Let Date: DEC 2008
Highway: RM 1703 Let Status: Actual
Project ID: C 2694-1-7 CSJ: 2694-01-007
Description: 2009 SEAL COAT Handling
Code:
 
Limits From: 3.93 MI. W. OF JCT OF US 67/90 Fund Cat: 1
Limits To: JCT OF US 67/90 Estimate: $207,080
Length: 3.9 Miles Actual: $176,983
 
Back...

Totals for 0104-06-023
Length: 42.9 Miles
Estimate: $2,986,585
Actual: $2,524,742


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract