Detail Letting Schedule for Hidalgo County (FY 2019)
Bid Tabulations Dashboard
This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Hidalgo County (FY 2019) |
CCSJ: 0039-02-063 |
|||
District: | PHARR | Let Date: | Jun 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | NH 1902(056) | CSJ: | 0039-02-063 |
Description: | NEW ARTERIAL | Handling Code: | |
Limits From: | FM 2221(JARA CHINAS ROAD) | Fund Cat: | 1 |
Limits To: | 0.28 MI WEST OF SHOWERS ROAD | ESTIMATE: | 126,000,000 |
Length: | 0.0 | Actual | $0 |
District: | PHARR | Let Date: | Jun 2019 |
Highway: | US 83 | Let Status: | Approved |
Project ID: | CSJ: | 0039-17-202 | |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | FM 1427 | Fund Cat: | 8 |
Limits To: | BUSINESS 83 S | ESTIMATE: | $146,913 |
Length: | 0.5 | Actual | $0 |
Back... | Totals for 0039-02-063 | ||
---|---|---|---|
Length: | 0.5 | ||
Estimate: | $126,146,913 | ||
Actual: | |||
CCSJ: 0039-02-068 |
|||
District: | PHARR | Let Date: | Dec 2018 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-02-068 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | TOM GILL RD. | Fund Cat: | 8 |
Limits To: | FM 1427 | ESTIMATE: | $109,227 |
Length: | 0.3 | Actual | $110,994 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-03-104 |
Description: | IMPROVE TRAFFIC SIGNAL, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | IH-2 | Fund Cat: | 8 |
Limits To: | FM 494 | ESTIMATE: | $797,971 |
Length: | 4.0 | Actual | $752,537 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-03-105 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | FM 2061/FM 3362 | Fund Cat: | 8 |
Limits To: | SUGAR RD. | ESTIMATE: | $183,607 |
Length: | 0.5 | Actual | $173,671 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-04-126 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | FM 1423 (VAL VERDE RD) | Fund Cat: | 8 |
Limits To: | 1ST ST. | ESTIMATE: | $359,799 |
Length: | 1.3 | Actual | $346,318 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 83-S | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-04-127 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | MIDWAY RD. | Fund Cat: | 8 |
Limits To: | FM 1015 | ESTIMATE: | $595,773 |
Length: | 4.0 | Actual | $552,131 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | IH 69E | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-07-251 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ FM 2994 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $111,939 |
Length: | 0.2 | Actual | $75,397 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | IH 69E | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-07-255 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ STATE SPUR 206 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $145,880 |
Length: | 0.2 | Actual | $112,457 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0039-17-193 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | FM 1427 | Fund Cat: | 8 |
Limits To: | BUS 83 | ESTIMATE: | $74,867 |
Length: | 0.5 | Actual | $68,015 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 77-X | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0327-08-095 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ STATE SPUR 206 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $107,628 |
Length: | 0.2 | Actual | $111,101 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | BU 77-X | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0327-08-096 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ COMMERCE ST. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $55,936 |
Length: | 0.3 | Actual | $32,261 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | FM 493 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 0863-01-067 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ BUS 83 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $82,452 |
Length: | 0.2 | Actual | $78,310 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2019(276) | CSJ: | 0921-02-410 |
Description: | TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | VARIOUS LOCATIONS | Fund Cat: | 1 |
Limits To: | WITHIN HIDALGO COUNTY | ESTIMATE: | $2,857,638 |
Length: | 0.1 | Actual | $2,394,898 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | FM 106 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 1425-03-062 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ SL 499 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $58,066 |
Length: | 0.2 | Actual | $62,714 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | FM 1924 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 1802-01-042 |
Description: | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | Handling Code: | |
Limits From: | FM 492 | Fund Cat: | 8 |
Limits To: | FM 494 | ESTIMATE: | $1,224,580 |
Length: | 6.4 | Actual | $1,159,177 |
District: | PHARR | Let Date: | Dec 2018 |
Highway: | FM 2061 | Let Status: | Actual |
Project ID: | STP 2019(275)HES | CSJ: | 1939-02-038 |
Description: | IMPROVE TRAFFIC SIGNALS | Handling Code: | |
Limits From: | @ EL RANCHO RD./HALL ACRES RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $64,150 |
Length: | 0.2 | Actual | $66,146 |
Back... | Totals for 0039-02-068 | ||
Length: | 18.6 | ||
Estimate: | $6,829,510 | ||
Actual: | $6,096,123 | ||
CCSJ: 0039-02-070 |
|||
District: | PHARR | Let Date: | Apr 2019 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | NH 2019(954) | CSJ: | 0039-02-070 |
Description: | REHABILITATE ROADWAY | Handling Code: | |
Limits From: | 2.164 MILES WEST OF FM 2221 | Fund Cat: | 1 |
Limits To: | FM 2221 | ESTIMATE: | $7,709,934 |
Length: | 2.2 | Actual | $7,504,997 |
Back... | Totals for 0039-02-070 | ||
Length: | 2.2 | ||
Estimate: | $7,709,934 | ||
Actual: | $7,504,997 | ||
CCSJ: 0039-02-072 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | US 83 | Let Status: | Tentative |
Project ID: | STP ( )HES | CSJ: | 0039-02-072 |
Description: | HAZARD ELIMINATION & SAFETY | Handling Code: | |
Limits From: | TABASCO RD. | Fund Cat: | 8 |
Limits To: | FM 1427 | ESTIMATE: | $465,179 |
Length: | 1.5 | Actual | $0 |
District: | PHARR | Let Date: | Aug 2019 |
Highway: | IH 69C | Let Status: | Tentative |
Project ID: | CSJ: | 0255-07-143 | |
Description: | INSTALL MEDIAN CABLE BARRIER | Handling Code: | |
Limits From: | BUS 281 W | Fund Cat: | 8 |
Limits To: | FM 2812 | ESTIMATE: | $829,850 |
Length: | 2.8 | Actual | $0 |
District: | PHARR | Let Date: | Aug 2019 |
Highway: | SH 107 | Let Status: | Tentative |
Project ID: | CSJ: | 0342-01-094 | |
Description: | INSTALL MEDIAN CABLE BARRIER | Handling Code: | |
Limits From: | FM 493 | Fund Cat: | 8 |
Limits To: | MILE 6 W. RD. | ESTIMATE: | $520,850 |
Length: | 1.8 | Actual | $0 |
District: | PHARR | Let Date: | Aug 2019 |
Highway: | SH 107 | Let Status: | Tentative |
Project ID: | CSJ: | 0528-01-122 | |
Description: | INSTALL MEDIAN CABLE BARRIER | Handling Code: | |
Limits From: | 0.4 MI SOUTH OF FM 676 | Fund Cat: | 8 |
Limits To: | 0.28 MI NORHT OF FM 1924 | ESTIMATE: | $420,844 |
Length: | 1.3 | Actual | $0 |
Back... | Totals for 0039-02-072 | ||
Length: | 7.4 | ||
Estimate: | $2,236,723 | ||
Actual: | |||
CCSJ: 0039-14-011 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | FM 886 | Let Status: | Tentative |
Project ID: | CRX 39-14-11 | CSJ: | 0039-14-011 |
Description: | UPGRADE RAILROAD CROSSING PLANKING | Handling Code: | XX |
Limits From: | FM 886, DOT #: 447839C | Fund Cat: | 10 |
Limits To: | NORTH OF LOS EBANOS | ESTIMATE: | $81,000 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0039-14-011 | ||
Length: | 0.1 | ||
Estimate: | $81,000 | ||
Actual: | |||
CCSJ: 0039-17-175 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | IH 2 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 0039-17-175 |
Description: | INTERCHANGE IMPROVEMENTS | Handling Code: | DB |
Limits From: | FM 2557 (STEWART RD.) | Fund Cat: | 11 |
Limits To: | 2ND STREET | ESTIMATE: | 141,766,908 |
Length: | 5.5 | Actual | $0 |
District: | PHARR | Let Date: | Aug 2019 |
Highway: | IH 69C | Let Status: | Tentative |
Project ID: | STP 2019( ) | CSJ: | 0255-08-107 |
Description: | CONSTRUCT INTERCHANGE | Handling Code: | DB |
Limits From: | IH-2 | Fund Cat: | 1 |
Limits To: | 1.82 MILES NORTH OF IH-2 | ESTIMATE: | $8,233,093 |
Length: | 1.8 | Actual | $0 |
Back... | Totals for 0039-17-175 | ||
Length: | 7.3 | ||
Estimate: | $150,000,001 | ||
Actual: | |||
CCSJ: 0039-17-201 |
|||
District: | PHARR | Let Date: | Feb 2019 |
Highway: | IH 2 | Let Status: | Actual |
Project ID: | NH 2019(694) | CSJ: | 0039-17-201 |
Description: | PAVEMENT REHABILITATION_(FRONTAGE RDS.) | Handling Code: | |
Limits From: | 0.4 MI EAST OF SH 336 | Fund Cat: | 1 |
Limits To: | 0.2 MI EAST OF FM 2557 | ESTIMATE: | $1,478,385 |
Length: | 6.0 | Actual | $1,809,686 |
District: | PHARR | Let Date: | Feb 2019 |
Highway: | IH 69C | Let Status: | Actual |
Project ID: | NH 2019(694) | CSJ: | 0255-08-109 |
Description: | PAVEMENT REHABILITATION (FRONTAGE RDS.) | Handling Code: | |
Limits From: | IH-2 | Fund Cat: | 1 |
Limits To: | 0.5 MI SOUTH OF SH 107 | ESTIMATE: | $909,983 |
Length: | 6.4 | Actual | $1,157,092 |
Back... | Totals for 0039-17-201 | ||
Length: | 12.4 | ||
Estimate: | $2,388,368 | ||
Actual: | $2,966,778 | ||
CCSJ: 0255-09-094 |
|||
District: | PHARR | Let Date: | Sep 2018 |
Highway: | UP 281 | Let Status: | Actual |
Project ID: | NH 2019(045) | CSJ: | 0255-09-094 |
Description: | REHABILITATE ROADWAY | Handling Code: | |
Limits From: | SH 336 | Fund Cat: | 1 |
Limits To: | SP 600 | ESTIMATE: | $18,509,182 |
Length: | 3.6 | Actual | $22,771,151 |
District: | PHARR | Let Date: | Sep 2018 |
Highway: | SS 600 | Let Status: | Actual |
Project ID: | CC 255-12-6 | CSJ: | 0255-12-006 |
Description: | REHABILITATE ROADWAY | Handling Code: | |
Limits From: | US 281 | Fund Cat: | 3 |
Limits To: | END OF STATE MAINTENANCE | ESTIMATE: | $1,001,008 |
Length: | 0.2 | Actual | $1,211,280 |
Back... | Totals for 0255-09-094 | ||
Length: | 3.8 | ||
Estimate: | $19,510,190 | ||
Actual: | $23,982,430 | ||
CCSJ: 0342-01-074 |
|||
District: | PHARR | Let Date: | Mar 2019 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2019(085) | CSJ: | 0342-01-074 |
Description: | CONSTRUCT 6 LANE DIVIDED RURAL | Handling Code: | |
Limits From: | US 281 | Fund Cat: | 1 |
Limits To: | EAST OF FM 493 | ESTIMATE: | $20,062,672 |
Length: | 7.1 | Actual | $20,492,320 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2019(084)HES | CSJ: | 0342-01-088 |
Description: | SAFETY LIGHTING | Handling Code: | |
Limits From: | 0.7 MI W OF FM 2128 | Fund Cat: | 8 |
Limits To: | 0.4 MI W OF FM 2128 | ESTIMATE: | $296,903 |
Length: | 1.1 | Actual | $321,205 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2019(084)HES | CSJ: | 0342-01-089 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: | |
Limits From: | @ FM 1423 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $126,844 |
Length: | 0.2 | Actual | $121,039 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | SH 107 | Let Status: | Actual |
Project ID: | STP 2019(084)HES | CSJ: | 0342-01-090 |
Description: | IMPROVE TRAFFIC SIGNAL | Handling Code: | |
Limits From: | @ FM 907 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $183,723 |
Length: | 0.2 | Actual | $169,328 |
Back... | Totals for 0342-01-074 | ||
Length: | 8.6 | ||
Estimate: | $20,670,142 | ||
Actual: | $21,103,891 | ||
CCSJ: 0342-02-054 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | SH 107 | Let Status: | Approved |
Project ID: | CSJ: | 0342-02-054 | |
Description: | Rehabilitate Existing Roadway | Handling Code: | |
Limits From: | WEST LEVEE | Fund Cat: | 1 |
Limits To: | FM 1425 | ESTIMATE: | $12,000,000 |
Length: | 4.1 | Actual | $0 |
Back... | Totals for 0342-02-054 | ||
Length: | 4.1 | ||
Estimate: | $12,000,000 | ||
Actual: | |||
CCSJ: 0698-03-095 |
|||
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 88 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0698-03-095 |
Description: | SAFETY LIGHTING | Handling Code: | |
Limits From: | 0.5 MI N OF MILE 9 N RD. | Fund Cat: | 8 |
Limits To: | MILE 9 N RD. | ESTIMATE: | $190,265 |
Length: | 0.5 | Actual | $183,852 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | US 83 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0038-07-073 |
Description: | SAFETY LIGHTING | Handling Code: | |
Limits From: | 0.6 MI E OF SUNTEX RD. | Fund Cat: | 8 |
Limits To: | 0.6 MI W OF FM 3167 | ESTIMATE: | $201,023 |
Length: | 0.8 | Actual | $138,906 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0220-04-051 |
Description: | INSTALL CHEVRONS ON CURVE & SAFETY LIGHTING | Handling Code: | |
Limits From: | MAIN ST./PADILLA ST. | Fund Cat: | 8 |
Limits To: | E. CALLE RANCH GRANDE (W) | ESTIMATE: | $115,701 |
Length: | 0.8 | Actual | $95,788 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0220-04-053 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ J PADILLA ST./MAIN ST. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $33,148 |
Length: | 0.2 | Actual | $33,012 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0220-04-054 |
Description: | INSTALL CHEVRONS ON CURVE & SAFETY LIGHTING | Handling Code: | |
Limits From: | SANTOS GOMEZ RD. | Fund Cat: | 8 |
Limits To: | 0.15 MI S OF FM 1732 | ESTIMATE: | $85,161 |
Length: | 0.3 | Actual | $63,202 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 106 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0630-03-025 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ CENTERLINE RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $35,119 |
Length: | 0.2 | Actual | $39,227 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 681 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0669-01-061 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ NUEVO AMANECER DR. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $34,377 |
Length: | 0.2 | Actual | $38,393 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 2221 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0669-03-023 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ IOWA RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $37,731 |
Length: | 0.2 | Actual | $44,327 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 2221 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0669-03-024 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ QUEEN PALM DR. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $34,225 |
Length: | 0.2 | Actual | $36,369 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 88 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0698-02-055 |
Description: | SAFETY LIGHTING | Handling Code: | |
Limits From: | 0.4 MI N OF MILE 20 N RD. | Fund Cat: | 8 |
Limits To: | 0.4 MI S OF MILE 20 N RD. | ESTIMATE: | $189,405 |
Length: | 0.8 | Actual | $154,246 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 88 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0698-02-056 |
Description: | SAFETY LIGHTING | Handling Code: | |
Limits From: | 0.4 MILES N OF FM 1925 | Fund Cat: | 8 |
Limits To: | 0.4 MILES S OF FM 1925 | ESTIMATE: | $198,344 |
Length: | 0.8 | Actual | $143,047 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 430 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0818-01-018 |
Description: | INSTALL CHEVRONS ON CURVE & SAFETY LIGHTING | Handling Code: | |
Limits From: | 0.25 MI W OF CR 313 | Fund Cat: | 8 |
Limits To: | 0.25 MI S OF CR 313 | ESTIMATE: | $119,797 |
Length: | 0.5 | Actual | $86,979 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 491 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0861-01-063 |
Description: | INSTALL INTERSECTION FLASHINB BEACON | Handling Code: | |
Limits From: | @ MILE 8 N RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $33,390 |
Length: | 0.2 | Actual | $38,031 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 493 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0863-01-069 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ MILE 8 1/2 N RD./MILE 9 N RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $31,469 |
Length: | 0.2 | Actual | $32,247 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 494 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 0864-01-076 |
Description: | SAFETY LIGHTING | Handling Code: | |
Limits From: | 0.25 MI N OF EL CAMINO REAL ST. | Fund Cat: | 8 |
Limits To: | EL CAMINO REAL ST. | ESTIMATE: | $73,830 |
Length: | 0.3 | Actual | $59,709 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 510 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1057-03-048 |
Description: | INSTALL CHEVRONS ON CURVE & SAFETY LIGHTING | Handling Code: | |
Limits From: | FM 3462 | Fund Cat: | 8 |
Limits To: | 0.25 MI E OF FM 3462 | ESTIMATE: | $62,514 |
Length: | 0.3 | Actual | $52,766 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | SS 206 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1425-03-064 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ S 21ST ST. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $32,424 |
Length: | 0.2 | Actual | $34,993 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 1479 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1425-04-024 |
Description: | SAFETY LIGHTING | Handling Code: | |
Limits From: | 0.1 MI N OF WILLOW RD. | Fund Cat: | 8 |
Limits To: | 0.5 MI N OF JIMENEZ RD. | ESTIMATE: | $164,850 |
Length: | 0.8 | Actual | $128,482 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 1419 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1426-01-053 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ S. DAKOTA AVE. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $33,186 |
Length: | 0.2 | Actual | $37,392 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 1423 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1427-01-039 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ TEX-MEX RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $35,483 |
Length: | 0.2 | Actual | $40,668 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 490 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1430-01-027 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ FM 2845 | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $32,733 |
Length: | 0.2 | Actual | $32,619 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 1925 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 1803-01-096 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ HOEHN DR. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $32,555 |
Length: | 0.2 | Actual | $32,482 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 3248 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 2717-02-009 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ DANA AVE. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $32,922 |
Length: | 0.2 | Actual | $33,187 |
District: | PHARR | Let Date: | Mar 2019 |
Highway: | FM 2812 | Let Status: | Actual |
Project ID: | STP 2019(649)HES | CSJ: | 2831-01-013 |
Description: | INSTALL INTERSECTION FLASHING BEACON | Handling Code: | |
Limits From: | @ BENITO A. RAMIREZ RD. | Fund Cat: | 8 |
Limits To: | . | ESTIMATE: | $35,785 |
Length: | 0.2 | Actual | $40,664 |
Back... | Totals for 0698-03-095 | ||
Length: | 8.7 | ||
Estimate: | $1,875,432 | ||
Actual: | $1,620,585 | ||
CCSJ: 0864-01-078 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | FM 494 | Let Status: | Tentative |
Project ID: | CRX 864-178 | CSJ: | 0864-01-078 |
Description: | UPGRADE RAILROAD CROSSING PLANKING | Handling Code: | XX |
Limits From: | FM 494, DOT #: 448770M | Fund Cat: | 10 |
Limits To: | IN GRANJENO | ESTIMATE: | $113,400 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0864-01-078 | ||
Length: | 0.1 | ||
Estimate: | $113,400 | ||
Actual: | |||
CCSJ: 0921-02-155 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CSJ: | 0921-02-155 | |
Description: | TRAFFIC SIGNAL HARDWARE IMPROVEMENTS | Handling Code: | XX |
Limits From: | WITHIN HIDALGO COUNTY LIMITS | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $1,000,000 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0921-02-155 | ||
Length: | 0.1 | ||
Estimate: | $1,000,000 | ||
Actual: | |||
CCSJ: 0921-02-333 |
|||
District: | PHARR | Let Date: | Dec 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | CBI 1702(648) | CSJ: | 0921-02-333 |
Description: | IMPROVEMENTS AT SOUTHBOUND INSPECTION FACILITY AT THE | Handling Code: | LC |
Limits From: | @ DONNA INTERNATIONAL BRIDGE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $9,000,000 |
Length: | 0.1 | Actual | $4,437,506 |
Back... | Totals for 0921-02-333 | ||
Length: | 0.1 | ||
Estimate: | $9,000,000 | ||
Actual: | $4,437,506 | ||
CCSJ: 0921-02-352 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | STP ( )MM | CSJ: | 0921-02-352 |
Description: | Construct New Road | Handling Code: | LC |
Limits From: | ON BICENTENNIAL BLVD., FROM SH 107 | Fund Cat: | 3 |
Limits To: | TRENTON RD. | ESTIMATE: | $18,432,046 |
Length: | 2.9 | Actual | $0 |
Back... | Totals for 0921-02-352 | ||
Length: | 2.9 | ||
Estimate: | $18,432,046 | ||
Actual: | |||
CCSJ: 0921-02-385 |
|||
District: | PHARR | Let Date: | Jun 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | CBI 2019(320) | CSJ: | 0921-02-385 |
Description: | Transportation Non-Roadway | Handling Code: | LC |
Limits From: | @ PHARR/REYNOSA INT. BRIDGE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $2,051,534 |
Length: | 0.2 | Actual | $0 |
District: | PHARR | Let Date: | Jun 2019 |
Highway: | CS | Let Status: | Approved |
Project ID: | CBI 2019(277) | CSJ: | 0921-02-383 |
Description: | Transportation Non-Roadway | Handling Code: | LC |
Limits From: | @ PHARR/REYNOSA INT. BRIDGE | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $2,554,962 |
Length: | 0.2 | Actual | $0 |
Back... | Totals for 0921-02-385 | ||
Length: | 0.4 | ||
Estimate: | $4,606,496 | ||
Actual: | |||
CCSJ: 0921-02-390 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | VA | Let Status: | Tentative |
Project ID: | STP ( )TP | CSJ: | 0921-02-390 |
Description: | VISION ZERO PLANNING STUDY | Handling Code: | XX |
Limits From: | WITHIN MCALLEN CITY LIMITS | Fund Cat: | 3 |
Limits To: | . | ESTIMATE: | $150,000 |
Length: | 0.1 | Actual | $0 |
Back... | Totals for 0921-02-390 | ||
Length: | 0.1 | ||
Estimate: | $150,000 | ||
Actual: | |||
CCSJ: 0921-02-409 |
|||
District: | PHARR | Let Date: | Dec 2018 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2019(086)TP | CSJ: | 0921-02-409 |
Description: | CONSTRUCT HIKE & BIKE TRAIL(PHASE II) | Handling Code: | LC |
Limits From: | RIDGE RD. | Fund Cat: | 3 |
Limits To: | HALL ACRES RD. | ESTIMATE: | $3,851,122 |
Length: | 2.9 | Actual | $3,409,415 |
Back... | Totals for 0921-02-409 | ||
Length: | 2.9 | ||
Estimate: | $3,851,122 | ||
Actual: | $3,409,415 | ||
CCSJ: 1586-01-076 |
|||
District: | PHARR | Let Date: | May 2019 |
Highway: | FM 907 | Let Status: | Approved |
Project ID: | STP 2019(893) | CSJ: | 1586-01-076 |
Description: | Rehabilitate Existing Roadway | Handling Code: | |
Limits From: | BUS 83 | Fund Cat: | 1 |
Limits To: | RANCHO BLANCO RD | ESTIMATE: | $6,259,160 |
Length: | 2.3 | Actual | $0 |
Back... | Totals for 1586-01-076 | ||
Length: | 2.3 | ||
Estimate: | $6,259,160 | ||
Actual: | |||
CCSJ: 1804-01-079 |
|||
District: | PHARR | Let Date: | Aug 2019 |
Highway: | SS 115 | Let Status: | Approved |
Project ID: | BR ( ) | CSJ: | 1804-01-079 |
Description: | Bridge Maintenance | Handling Code: | |
Limits From: | ON SS 115NB @ HACKNEY LAKE FLOODWAY | Fund Cat: | 6 |
Limits To: | STR #:_1804-01-006 | ESTIMATE: | $650,000 |
Length: | 0.4 | Actual | $0 |
District: | PHARR | Let Date: | Aug 2019 |
Highway: | SS 115 | Let Status: | Approved |
Project ID: | CSJ: | 1804-01-080 | |
Description: | ABUTMENT CAP REPLACEMENT | Handling Code: | |
Limits From: | ON SS 115SB @ HACKNEY LAKE FLOODWAY | Fund Cat: | 6 |
Limits To: | STR #:_1804-01-007 | ESTIMATE: | $650,000 |
Length: | 0.4 | Actual | $0 |
Back... | Totals for 1804-01-079 | ||
Length: | 0.8 | ||
Estimate: | $1,300,000 | ||
Actual: |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |