Letting Schedule for Lufkin District (FY 2021)

Last Update: Tuesday, October 05, 2021

Bid Tabulations Dashboard

Use this interactive Tableau dashboard to display bidding information on projects let through statewide and local district letting for the past 24 months.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Lufkin District (FY 2021)
Angelina | Houston | Nacogdoches | Polk | Sabine | San Augustine | Shelby | Trinity |

Angelina County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0911-00-108VAActualMay 2021$361,2088INTERSECTION IMPROVEMENT0.0
0911-00-109VAActualJul 2021$4,952,5098HIGHWAY IMPROVEMENT0.0
2589-01-023FM 2497ActualMay 2021$5,973,7306BRIDGE REPLACEMENT6.0
2553-01-115US 59ActualOct 2020$15,921,0091CONVERT NON-FREEWAY6.0
0911-00-080VAActualSep 2020$1,943,8121HIGHWAY IMPROVEMENT0.0
0911-00-110VAActualMar 2021$629,5751BRIDGE MAINTENANCE0.0
1157-01-018FM 841ActualFeb 2021$5,172,3508REPLACE GUARDRAIL6.0
0911-00-112VAActualAug 2021$1,201,6348INSTALL ADVANCED TRAFFIC MANAGEMENT SYSTEM3.5
0911-00-106VAActualAug 2021$3,924,9458CONSTRUCT PEDESTRIAN INFRASTRUCTURE0.0
0176-02-124BU 59-GActualAug 2021$979,5648CONSTRUCT PEDESTRIAN INFRASTRUCTURE3.5

Houston County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0109-03-036US 287ActualJun 2021$1,884,6518REPLACE GUARDRAIL5.5
0911-28-043CRActualSep 2020$891,2276BRIDGE REPLACEMENT0.0
0911-28-051CRActualJul 2021$1,087,0936BRIDGE REPLACEMENT4.0
0336-02-029SH 7ActualMar 2021$1,540,1811SURFACING/ROADWAY RESTORATION0.0
0911-28-049CRActualJun 2021$1,758,9526BRIDGE REPLACEMENT3.5
1875-02-027FM 2022ActualAug 2021$4,806,5588WIDEN ROAD - ADD SHOULDERS5.0

Nacogdoches County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0118-08-076SH 21ActualMay 2021$5,795,1996BRIDGE REPLACEMENT6.0
0911-08-047CRActualDec 2020$300,0008RAILROAD CROSSING IMPROVEMENTS0.0

Polk County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0213-04-050US 190ActualAug 2021$28,372,2208INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES3.5
0176-05-197US 59ActualNov 2020$2,626,3971RESURFACE ROADWAY0.0
0176-04-087US 59ActualJun 2021$6,447,9828HIGHWAY IMPROVEMENT3.0
0911-04-087CRActualJul 2021$1,639,1246BRIDGE REPLACEMENT5.0
1408-01-027FM 1276ActualAug 2021$195,5898INSTALL FLASHING BEACON0.0

Sabine County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0694-01-031FM 83ActualMay 2021$931,9266BRIDGE MAINTENANCE4.5

San Augustine County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0597-02-022FM 1277ActualOct 2020$5,813,2611ROADWAY REHABILITATION/RECONSTRUCTION WITH NO ADDED CAPACITY5.0
0390-05-006FM 2558ActualSep 2020$1,491,1736BRIDGE REPLACEMENT4.0

Shelby County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
1409-03-020FM 2261ActualJun 2021$1,222,6036BRIDGE REPLACEMENT4.0

Trinity County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0109-07-053SH 19ActualNov 2020$13,815,1621RESURFACE ROADWAY0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract