Letting Schedule for Paris District (FY 2021)

Last Update: Tuesday, August 13, 2024

Bid Tabulations Dashboard

This report will no longer be updated, please access links on the Contract Letting page.

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Paris District (FY 2021)
Fannin | Grayson | Hopkins | Hunt | Lamar | Red River |

Fannin County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0901-32-098VATentativeJun 2020$40,000,0003MISCELLANEOUS CONSTRUCTION0.0
0202-03-042US 69TentativeNov 2019$236,9148INSTALL LED FLASHING CHEVRONS (CURVE)0.0
1154-01-020FM 824TentativeApr 2020$4,840,00012R REHABILITATION0.0
1482-01-014FM 1550TentativeJul 2020$2,860,00012R REHAB0.0

Grayson County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0901-19-187VATentativeAug 2020$8,000,00011CONSTRUCT 2-LANE NEW LOCATION FM HIGHWAY0.0
0047-02-150US 75TentativeSep 2019$162,333,3421RECONSTRUCT AND WIDENING FROM 4-LN TO 6-LN0.0
0901-19-197VATentativeJan 2020$1,500,0001FY 2020 CONCRETE PAVEMENT PROJECTS ON US 750.0

Hopkins County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0083-02-056SH 11TentativeDec 2019$1,700,0001REHABILITATION OF EXISTING ROAD0.0
0108-09-050SH 19TentativeMay 2020$4,230,9558SAFETY TREAT FIXED OBJECTS0.0
3370-01-008FM 3389TentativeApr 2020$3,849,45012R REHABILITATION0.0

Hunt County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0901-22-121VATentativeOct 2019$311,95035-FOOT SIDEWALK AND ADA RAMP CONSTRUCTION0.0
0203-01-060US 69TentativeFeb 2020$392,6198INSTALL CONTINUOUS TURN LANE0.0
1495-01-009FM 1566TentativeApr 2020$3,590,40012R REHABILITATION0.0
1290-07-001SH 276TentativeAug 2020$9,000,0002MCONSTRUCT 4 LANE FACILITY ON NEW LOCATION (QUINLAN BYPASS)0.0
0009-15-028US 69TentativeMay 2020$1,191,0038IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS, INSTALL0.0
2247-03-008FM 2194TentativeMay 2020$1,371,2778SAFETY TREAT FIXED OBJECTS, CONSTRUCT PAVED SHOULDERS0.0

Lamar County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0688-02-062FM 79TentativeDec 2019$12,244,8931Preventive Maintenance0.0
0769-02-033FM 906TentativeJul 2020$2,475,00012R REHABILITATION0.0
0045-09-105BU 82-HTentativeJul 2020$1,057,8368IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS0.0
0045-09-104US 82TentativeMay 2020$821,2268IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS0.0
0901-29-090VATentativeOct 2019$1,304,000310-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR0.0
0688-02-057FM 79TentativeMar 2020$1,824,5241MILL AND INLAY0.0

Red River County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0901-27-053VATentativeOct 2019$1,027,689310-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR0.0
0772-03-022SH 37TentativeDec 2019$6,509,9991REHABILITATION OF EXISTING ROAD0.0
0045-12-087US 82TentativeAug 2020$4,051,8628IMPROVE GUARDRAIL TO DESIGN STANDARDS0.0
0045-12-084US 82TentativeSep 2019$251,0128IMPROVE TRAFFIC SIGNALS0.0
0722-03-014FM 911TentativeMay 2020$4,398,1018PROVIDE ADDITIONAL PAVED SURFACE WIDTH0.0
0901-27-052VATentativeOct 2019$570,812310-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR0.0
0045-12-088US 82TentativeOct 2019$24,7118SAFETY LIGHTING0.0
0901-27-046CSTentativeAug 2020$487,0846REPLACE BRIDGE AND APPROACHES0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract