Letting Schedule for Paris District (FY 2021)
Bid Tabulations Dashboard
This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Paris District (FY 2021) |
Fannin | Grayson | Hopkins | Hunt | Lamar | Red River | | |||||||
Fannin County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
---|---|---|---|---|---|---|---|
0901-32-098 | VA | Tentative | Jun 2020 | $40,000,000 | 3 | MISCELLANEOUS CONSTRUCTION | 0.0 |
0202-03-042 | US 69 | Tentative | Nov 2019 | $236,914 | 8 | INSTALL LED FLASHING CHEVRONS (CURVE) | 0.0 |
1154-01-020 | FM 824 | Tentative | Apr 2020 | $4,840,000 | 1 | 2R REHABILITATION | 0.0 |
1482-01-014 | FM 1550 | Tentative | Jul 2020 | $2,860,000 | 1 | 2R REHAB | 0.0 |
Grayson County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0901-19-187 | VA | Tentative | Aug 2020 | $8,000,000 | 11 | CONSTRUCT 2-LANE NEW LOCATION FM HIGHWAY | 0.0 |
0047-02-150 | US 75 | Tentative | Sep 2019 | $162,333,342 | 1 | RECONSTRUCT AND WIDENING FROM 4-LN TO 6-LN | 0.0 |
0901-19-197 | VA | Tentative | Jan 2020 | $1,500,000 | 1 | FY 2020 CONCRETE PAVEMENT PROJECTS ON US 75 | 0.0 |
Hopkins County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0083-02-056 | SH 11 | Tentative | Dec 2019 | $1,700,000 | 1 | REHABILITATION OF EXISTING ROAD | 0.0 |
0108-09-050 | SH 19 | Tentative | May 2020 | $4,230,955 | 8 | SAFETY TREAT FIXED OBJECTS | 0.0 |
3370-01-008 | FM 3389 | Tentative | Apr 2020 | $3,849,450 | 1 | 2R REHABILITATION | 0.0 |
Hunt County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0901-22-121 | VA | Tentative | Oct 2019 | $311,950 | 3 | 5-FOOT SIDEWALK AND ADA RAMP CONSTRUCTION | 0.0 |
0203-01-060 | US 69 | Tentative | Feb 2020 | $392,619 | 8 | INSTALL CONTINUOUS TURN LANE | 0.0 |
1495-01-009 | FM 1566 | Tentative | Apr 2020 | $3,590,400 | 1 | 2R REHABILITATION | 0.0 |
1290-07-001 | SH 276 | Tentative | Aug 2020 | $9,000,000 | 2M | CONSTRUCT 4 LANE FACILITY ON NEW LOCATION (QUINLAN BYPASS) | 0.0 |
0009-15-028 | US 69 | Tentative | May 2020 | $1,191,003 | 8 | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS, INSTALL | 0.0 |
2247-03-008 | FM 2194 | Tentative | May 2020 | $1,371,277 | 8 | SAFETY TREAT FIXED OBJECTS, CONSTRUCT PAVED SHOULDERS | 0.0 |
Lamar County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0688-02-062 | FM 79 | Tentative | Dec 2019 | $12,244,893 | 1 | Preventive Maintenance | 0.0 |
0769-02-033 | FM 906 | Tentative | Jul 2020 | $2,475,000 | 1 | 2R REHABILITATION | 0.0 |
0045-09-105 | BU 82-H | Tentative | Jul 2020 | $1,057,836 | 8 | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | 0.0 |
0045-09-104 | US 82 | Tentative | May 2020 | $821,226 | 8 | IMPROVE TRAFFIC SIGNALS, INTERCONNECT SIGNALS | 0.0 |
0901-29-090 | VA | Tentative | Oct 2019 | $1,304,000 | 3 | 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR | 0.0 |
0688-02-057 | FM 79 | Tentative | Mar 2020 | $1,824,524 | 1 | MILL AND INLAY | 0.0 |
Red River County |
|||||||
CCSJ | Highway | Let Status | Letting Date | Contract Cost | Fund Cat | Description | DBE Goal |
0901-27-053 | VA | Tentative | Oct 2019 | $1,027,689 | 3 | 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR | 0.0 |
0772-03-022 | SH 37 | Tentative | Dec 2019 | $6,509,999 | 1 | REHABILITATION OF EXISTING ROAD | 0.0 |
0045-12-087 | US 82 | Tentative | Aug 2020 | $4,051,862 | 8 | IMPROVE GUARDRAIL TO DESIGN STANDARDS | 0.0 |
0045-12-084 | US 82 | Tentative | Sep 2019 | $251,012 | 8 | IMPROVE TRAFFIC SIGNALS | 0.0 |
0722-03-014 | FM 911 | Tentative | May 2020 | $4,398,101 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH | 0.0 |
0901-27-052 | VA | Tentative | Oct 2019 | $570,812 | 3 | 10-FOOT WIDE SHARED USE PATH ON RAILBANKED CORRIDOR | 0.0 |
0045-12-088 | US 82 | Tentative | Oct 2019 | $24,711 | 8 | SAFETY LIGHTING | 0.0 |
0901-27-046 | CS | Tentative | Aug 2020 | $487,084 | 6 | REPLACE BRIDGE AND APPROACHES | 0.0 |
|