Letting Schedule for Abilene District (FY 2021)

Last Update: Tuesday, April 13, 2021

The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only.

Abilene District (FY 2021)
Fisher | Haskell | Howard | Jones | Mitchell | Nolan | Scurry | Stonewall | Taylor |

Fisher County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0983-02-022FM 419ApprovedJun 2021$1,473,5406BRIDGE REPLACEMENT0.0

Haskell County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0157-09-005US 277ApprovedAug 2021$250,0008INSTALL FLASHING BEACON0.0
0157-09-006US 277ApprovedAug 2021$250,0008INSTALL FLASHING BEACON0.0
0982-07-013FM 1720ActualOct 2020$9,286,70911REHABILITATE EXISTING ROADWAY7.0

Howard County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0068-08-067US 87ApprovedAug 2021$6,835,54211REHABILITATE EXISTING ROADWAY0.0
0693-01-037SH 350ActualNov 2020$3,411,02411RESURFACE ROADWAY7.0
0068-07-052US 87ApprovedAug 2021$3,070,0008HIGHWAY IMPROVEMENT0.0
1155-03-011FM 1785ApprovedJul 2021$11,570,70111WIDEN ROAD - ADD SHOULDERS0.0
0908-12-031VAActualOct 2020$549,0018RAILROAD CROSSING IMPROVEMENTS0.0

Jones County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0033-05-095US 83ActualApr 2021$264,8881SURFACING/ROADWAY RESTORATION0.0
2032-03-013FM 600ApprovedAug 2021$4,662,6421PREVENTIVE MAINTENANCE0.0

Mitchell County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0005-07-058IH 20ActualDec 2020$15,223,7001PREVENTIVE MAINTENANCE8.5

Nolan County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0006-03-137IH 20ActualDec 2020$14,245,6781SEAL COAT0.0
0650-01-034SH 153ApprovedAug 2021$7,355,5588WIDEN ROAD - ADD SHOULDERS0.0

Scurry County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0053-09-073US 84ActualMar 2021$1,940,4781SEAL COAT0.0
1526-01-019FM 1606ActualJan 2021$2,904,2426BRIDGE REPLACEMENT0.0
0053-07-040US 84ApprovedJul 2021$2,882,9708INSTALL/UPGRADE ROADWAY LIGHTING0.0

Stonewall County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0032-07-036US 83ApprovedMay 2021$3,752,4898INTERSECTION IMPROVEMENT0.0
0033-01-040US 83ActualNov 2020$4,519,0276BRIDGE REPLACEMENT6.5

Taylor County

CCSJHighwayLet StatusLetting
Date
Contract
Cost
Fund
Cat
DescriptionDBE Goal
0908-00-102VAActualDec 2020$1,025,11511PREVENTIVE MAINTENANCE0.0
0699-01-052FM 89ApprovedAug 2021$21,650,0001WIDEN ROAD - ADD LANES0.0
0908-33-100VAApprovedMay 2021$197,80510DRAINAGE IMPROVEMENTS0.0
2270-01-023FM 3438ApprovedAug 2021$4,222,7401PREVENTIVE MAINTENANCE0.0
0908-00-103VAActualDec 2020$1,003,97911PREVENTIVE MAINTENANCE0.0
0908-00-104VAActualDec 2020$1,019,53111PREVENTIVE MAINTENANCE0.0
0181-01-061SH 36ActualOct 2020$4,089,1581PREVENTIVE MAINTENANCE3.0
0908-00-098VAActualDec 2020$2,393,9161PREVENTIVE MAINTENANCE0.0
0908-00-097VAActualDec 2020$1,694,7381PREVENTIVE MAINTENANCE0.0
0663-02-010FM 707ApprovedAug 2021$1,060,0008INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT TURN LANES0.0
0033-08-043BU 83-DApprovedJun 2021$164,1158INSTALL FLASHING BEACON0.0


Let StatusDefinition
TentativeEstimated letting date for this project
ApprovedProject has administrative approval to be let
ActualProject was let to contract