Detail Letting Schedule for Potter County (FY 2021)
Bid Tabulations Dashboard
This report will no longer be updated, please access links on the Contract Letting page. The Electronic State Business Daily (ESBD), the Electronic Bidding System, and the project proposal are the official sources of advertisement and bidding information for the State and Local Lettings. Bidders should bid the project using the information found therein, including any addenda. These sources take precedence over information from other sources, including TxDOT webpages, which are unofficial and intended for informational purposes only. |
Potter County (FY 2021) |
CCSJ: 0041-08-004 |
|||
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | SL 434 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0041-08-004 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | US 87 | Fund Cat: | 1 |
Limits To: | WILLOW CREEK ROAD | ESTIMATE: | $117,665 |
Length: | 2.6 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | US 287 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0042-03-043 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | CARSON COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 3330 | ESTIMATE: | $1,058,420 |
Length: | 10.7 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | US 87 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 0067-01-080 |
Description: | SEALCOAT SBL | Handling Code: | |
Limits From: | SOUTH OF CANYON (DIVIDED SECTION) | Fund Cat: | 1 |
Limits To: | HUNGATE ROAD | ESTIMATE: | $787,950 |
Length: | 5.9 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | US 87 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 0067-01-081 |
Description: | SEALCOAT NBL | Handling Code: | |
Limits From: | SOUTH OF CANYON (DIVIDED SECTION) | Fund Cat: | 1 |
Limits To: | HUNGATE ROAD | ESTIMATE: | $818,986 |
Length: | 5.9 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | US 54 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0238-05-045 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | DALLAM COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 287 | ESTIMATE: | $361,860 |
Length: | 7.3 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | IH 40 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0275-11-082 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | FM 291_(N FRT RD) | Fund Cat: | 1 |
Limits To: | COUNTY ROAD 26_(N FRT RD) | ESTIMATE: | $311,600 |
Length: | 5.5 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | SH 15 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0355-03-032 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | US 83 | Fund Cat: | 1 |
Limits To: | LIPSCOMB COUNTY LINE | ESTIMATE: | $826,925 |
Length: | 15.3 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | SH 305 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0582-02-020 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | SS 188 IN LIPSCOMB | Fund Cat: | 1 |
Limits To: | HEMPHILL COUNTY LINE | ESTIMATE: | $560,533 |
Length: | 12.3 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | SH 305 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0582-03-015 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | HEMPHILL COUNTY LINE | Fund Cat: | 1 |
Limits To: | US 60 | ESTIMATE: | $144,567 |
Length: | 3.2 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | FM 293 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0753-03-017 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | US 60 | Fund Cat: | 1 |
Limits To: | FM 295 | ESTIMATE: | $591,180 |
Length: | 15.7 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | FM 285 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0789-02-019 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | RANDALL COUNTY LINE | Fund Cat: | 1 |
Limits To: | FM 2301 | ESTIMATE: | $250,000 |
Length: | 7.6 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | SH 136 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0791-01-020 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | OKLAHOMA STATE LINE | Fund Cat: | 1 |
Limits To: | SH 15 | ESTIMATE: | $944,460 |
Length: | 18.4 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | RM 687 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0791-04-010 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | SH 136 IN FRITCH | Fund Cat: | 1 |
Limits To: | RM 1319 IN SANFORD | ESTIMATE: | $276,405 |
Length: | 5.4 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | SH 136 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0791-05-021 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | SH 15 | Fund Cat: | 1 |
Limits To: | HUTCHINSON COUNTY LINE | ESTIMATE: | $830,540 |
Length: | 16.1 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | RM 687 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0791-06-010 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | SH 152 IN STINNETT | Fund Cat: | 1 |
Limits To: | RM 1319 NORTH OF LAKE MEREDITH | ESTIMATE: | $530,575 |
Length: | 10.4 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | FM 376 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0799-02-014 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | SH 15 | Fund Cat: | 1 |
Limits To: | FM 759 | ESTIMATE: | $398,800 |
Length: | 9.2 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | FM 1060 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 1244-01-019 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | SHERMAN COUNTY LINE | Fund Cat: | 1 |
Limits To: | SH 152 | ESTIMATE: | $564,065 |
Length: | 14.2 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | FM 1290 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 1338-01-012 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | OKLAHOMA STATE LINE | Fund Cat: | 1 |
Limits To: | SH 15 | ESTIMATE: | $443,710 |
Length: | 11.9 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | RM 2375 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 1861-01-013 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | FM 749 | Fund Cat: | 1 |
Limits To: | SH 273 | ESTIMATE: | $227,220 |
Length: | 6.9 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | FM 3395 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 2129-02-006 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | FM 1913 | Fund Cat: | 1 |
Limits To: | HUTCHINSON COUNTY LINE | ESTIMATE: | $49,095 |
Length: | 1.3 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | FM 3395 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 2129-03-006 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | HUTCHINSON COUNTY LINE | Fund Cat: | 1 |
Limits To: | RM 687 NORTH OF LAKE MEREDITH | ESTIMATE: | $150,720 |
Length: | 4.1 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | FM 285 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 2401-01-010 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | FM 2301 | Fund Cat: | 1 |
Limits To: | SH 207 | ESTIMATE: | $198,310 |
Length: | 6.0 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | RM 1319 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 2437-01-025 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | MOORE COUNTY LINE | Fund Cat: | 1 |
Limits To: | RM687 NORTH OF LAKE MEREDITH | ESTIMATE: | $280,580 |
Length: | 6.5 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | RM 687 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 2437-01-026 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | RM 1319 NORTH OF LAKE MEREDITH | Fund Cat: | 1 |
Limits To: | RM 1319/RM 687 IN SANFORD | ESTIMATE: | $126,570 |
Length: | 2.7 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | RM 1319 | Let Status: | Tentative |
Project ID: | CSJ: | 2437-02-012 | |
Description: | SEALCOAT | Handling Code: | |
Limits From: | FM 1913 | Fund Cat: | 1 |
Limits To: | HUTCHINSON COUNTY LINE | ESTIMATE: | $52,376 |
Length: | 1.0 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | FM 2590 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 2614-01-022 |
Description: | SEALCOAT | Handling Code: | |
Limits From: | SL 335 | Fund Cat: | 1 |
Limits To: | US 60 | ESTIMATE: | $705,000 |
Length: | 9.4 | Actual | $0 |
Bid List Back... | Totals for 0041-08-004 | ||
---|---|---|---|
Length: | 215.5 | ||
Estimate: | $11,608,112 | ||
Actual: | |||
CCSJ: 0090-05-100 |
|||
District: | AMARILLO | Let Date: | Oct 2019 |
Highway: | SL 279 | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0090-05-100 |
Description: | CONSTRUCT CURB RAMPS | Handling Code: | |
Limits From: | AVONDALE STREET | Fund Cat: | 10 |
Limits To: | WESTERN STREET | ESTIMATE: | $620,198 |
Length: | 0.6 | Actual | $0 |
Back... | Totals for 0090-05-100 | ||
Length: | 0.6 | ||
Estimate: | $620,198 | ||
Actual: | |||
CCSJ: 0275-01-199 |
|||
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | IH 40 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 0275-01-199 |
Description: | B-2 PHASE II: RECONSTRUCT IH 40 2ND LEVEL MAINLANE BRIDGE AT | Handling Code: | |
Limits From: | BI 40-D | Fund Cat: | 1 |
Limits To: | FM 2590 (SONCY ROAD) | ESTIMATE: | $24,150,000 |
Length: | 1.5 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | SL 335 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 2635-04-037 |
Description: | B-2 PHASE II: CONSTRUCT FRT RDS FOR FUTURE FREEWAY | Handling Code: | |
Limits From: | FM 2590 NORTH | Fund Cat: | 1 |
Limits To: | SW 9TH | ESTIMATE: | $10,100,000 |
Length: | 1.0 | Actual | $0 |
District: | AMARILLO | Let Date: | Nov 2019 |
Highway: | SL 335 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 2635-06-002 |
Description: | B-2 PHASE II: CONSTRUCT FRT RDS FOR FUTURE FREEWAY | Handling Code: | |
Limits From: | IH 40 | Fund Cat: | 1 |
Limits To: | FM 2590 NORTH | ESTIMATE: | $13,900,000 |
Length: | 1.4 | Actual | $0 |
Back... | Totals for 0275-01-199 | ||
Length: | 3.9 | ||
Estimate: | $48,150,000 | ||
Actual: | |||
CCSJ: 0275-01-205 |
|||
District: | AMARILLO | Let Date: | May 2020 |
Highway: | IH 40 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0275-01-205 |
Description: | 2018 BMIP REPAIR WB BRIDGE | Handling Code: | |
Limits From: | AT PARAMOUNT BLVD-JULIAN/WOLFLIN ST | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $2,160,000 |
Length: | 0.1 | Actual | $0 |
District: | AMARILLO | Let Date: | May 2020 |
Highway: | IH 40 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0275-01-206 |
Description: | 2018 BMIP REPAIR EB BRIDGE | Handling Code: | |
Limits From: | AT PARAMOUNT BLVD-JULIAN/WOLFLIN ST | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $2,050,000 |
Length: | 0.1 | Actual | $0 |
District: | AMARILLO | Let Date: | May 2020 |
Highway: | IH 40 | Let Status: | Tentative |
Project ID: | CSJ: | 0275-01-207 | |
Description: | 2018 BMIP REPAIR WB BRIDGE | Handling Code: | |
Limits From: | AT GEORGIA ST | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $1,470,000 |
Length: | 0.0 | Actual | $0 |
District: | AMARILLO | Let Date: | May 2020 |
Highway: | IH 40 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0275-01-208 |
Description: | 2018 BMIP REPAIR EB BRIDGE | Handling Code: | |
Limits From: | AT GEORGIA ST | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $1,500,000 |
Length: | 0.0 | Actual | $0 |
District: | AMARILLO | Let Date: | May 2020 |
Highway: | IH 40 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0275-01-209 |
Description: | 2018 BMIP REPAIR WB BRIDGE | Handling Code: | |
Limits From: | AT WESTERN ST | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $1,400,000 |
Length: | 0.0 | Actual | $0 |
District: | AMARILLO | Let Date: | May 2020 |
Highway: | IH 40 | Let Status: | Tentative |
Project ID: | CSJ: | 0275-01-210 | |
Description: | 2018 BMIP REPAIR EB BRIDGE | Handling Code: | |
Limits From: | AT WESTERN ST | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $1,400,000 |
Length: | 0.0 | Actual | $0 |
District: | AMARILLO | Let Date: | May 2020 |
Highway: | IH 40 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0275-01-211 |
Description: | 2018 BMIP REPAIR WB BRIDGE | Handling Code: | |
Limits From: | AT COULTER ST | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $1,680,000 |
Length: | 0.0 | Actual | $0 |
District: | AMARILLO | Let Date: | May 2020 |
Highway: | IH 40 | Let Status: | Tentative |
Project ID: | BR ( ) | CSJ: | 0275-01-212 |
Description: | 2018 BMIP REPAIR EB BRIDGE | Handling Code: | |
Limits From: | AT COULTER ST | Fund Cat: | 6 |
Limits To: | . | ESTIMATE: | $1,680,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0275-01-205 | ||
Length: | 0.2 | ||
Estimate: | $13,340,000 | ||
Actual: | |||
CCSJ: 0904-00-173 |
|||
District: | AMARILLO | Let Date: | Sep 2019 |
Highway: | VA | Let Status: | Tentative |
Project ID: | STP ( ) | CSJ: | 0904-00-173 |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $600,000 |
Length: | 1.0 | Actual | $0 |
District: | AMARILLO | Let Date: | Sep 2019 |
Highway: | VA | Let Status: | Tentative |
Project ID: | CSJ: | 0904-00-189 | |
Description: | PREVENTIVE MAINTENANCE | Handling Code: | |
Limits From: | VARIOUS LOCATIONS DISTRICTWIDE | Fund Cat: | 1 |
Limits To: | . | ESTIMATE: | $150,000 |
Length: | 0.0 | Actual | $0 |
Back... | Totals for 0904-00-173 | ||
Length: | 1 | ||
Estimate: | $750,000 | ||
Actual: | |||
CCSJ: 2635-01-038 |
|||
District: | AMARILLO | Let Date: | Oct 2019 |
Highway: | SL 335 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 2635-01-038 |
Description: | OVERLAY | Handling Code: | |
Limits From: | IH 40 | Fund Cat: | 1 |
Limits To: | SOUTH OF SH 136 (DIVIDED SECTION) | ESTIMATE: | $6,000,000 |
Length: | 4.1 | Actual | $0 |
District: | AMARILLO | Let Date: | Oct 2019 |
Highway: | FM 1541 | Let Status: | Tentative |
Project ID: | NH ( ) | CSJ: | 1480-02-033 |
Description: | OVERLAY | Handling Code: | |
Limits From: | IH 27 | Fund Cat: | 1 |
Limits To: | SL 335 | ESTIMATE: | $2,300,000 |
Length: | 3.9 | Actual | $0 |
Back... | Totals for 2635-01-038 | ||
Length: | 8 | ||
Estimate: | $8,300,000 | ||
Actual: |
Handling Code | Definition |
---|---|
XX | Project not processed through statewide letting |
TR | Transfer of funds |
LC | Project let through local entity |
LC | Project not charged against district apportionment |
Let Status | Definition |
---|---|
Tentative | Estimated letting date for this project |
Approved | Project has administrative approval to be let |
Actual | Project was let to contract |