AVERAGE LOW BID UNIT PRICE - MAINTENANCE - ABILENE DISTRICT

Last Update: Monday, June 2, 2014
ITEMS 712 2005 TO 788 2001
Items Items Bid Code Range
0104 - 0110
0361 - 0361
0429 - 0495
0500 - 0545
0658 - 0678
0712 - 0788
4013 - 4429
5522 - 5522
6473 - 6473
7008 - 7224
712 2005 - 788 2001
Item No Description Units May 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,672.780 334.38890 3
730 2002 FULL - WIDTH MOWING AC     19,061.000 28.29016 3
730 2003 SPOT MOWING AC     50.000 10.00000 1
738 2094 CLEAN / SWEEP - CENTER MEDIAN - AREA (1) CYC     24.000 1,175.00000 1
738 2095 CLEAN / SWEEP - CENTER MEDIAN - AREA (2) CYC     8.000 3,345.00000 1
738 2097 CLEAN / SWEEP - CENTER MEDIAN - AREA (4) CYC     2.000 775.00000 1
738 2114 CLEAN / SWEEP - OUTSIDE MAIN LANE - AREA (1) CYC     24.000 1,175.00000 1
738 2115 CLEAN / SWEEP - OUTSIDE MAIN LANE - AREA (2) CYC     8.000 750.00000 1
738 2117 CLEAN / SWEEP - OUTSIDE MAIN LANE - AREA (4) CYC     2.000 975.00000 1
738 2118 CLEAN / SWEEP - OUTSIDE MAIN LANE - AREA (5) CYC     2.000 775.00000 1
738 2135 CLEAN / SWEEP - FRONTAGE ROAD - AREA (2) CYC     8.000 775.00000 1
738 2136 CLEAN / SWEEP - FRONTAGE ROAD - AREA (3) CYC     4.000 885.00000 1
745 2006 JANITORIAL MAINT (PICNIC AREAS) CYC     104.000 170.00000 1
745 2010 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (1) CYC     24.000 186.33333 3
745 2011 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (2) CYC     24.000 383.00000 3
745 2100 JANITORIAL MAINT - PICNIC AREA - SITE (1) CYC     208.000 74.00000 2
745 2101 JANITORIAL MAINT - PICNIC AREA - SITE (2) CYC     104.000 79.00000 1
751 2026 LITTER PICKUP AC     199.760 9.68652 3
751 2028 MOWING, TRIMMING, AND EDGING AC     199.760 38.20019 3
770 2001 REPAIR RAIL ELEMENT (W - BEAM) LF 7,050.000 12.00000 7,050.000 12.00000 2
770 2002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF 30.000 5.00000 30.000 5.00000 2
770 2003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM) LF 15.000 5.00000 15.000 5.00000 2
770 2004 REM / REPL TIMBER / STL POST W / O CONC FND EA 282.000 33.04965 282.000 33.04965 2
770 2005 REM / REPL TIMBER / STL POST W / CONC FND EA 223.000 34.01345 223.000 34.01345 2
770 2006 REALIGN POSTS EA 113.000 8.56637 113.000 8.56637 2
770 2007 REPAIR OF TERMINAL ANCHORS POSTS EA 10.000 2.60000 10.000 2.60000 2
770 2008 REPLACE TERMINAL ANCHOR POSTS EA 10.000 2.60000 10.000 2.60000 2
770 2009 REMOVE GDRAIL END TRT / REPL WITH SGT EA 38.000 2,269.73684 38.000 2,269.73684 2
770 2010 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 15.000 270.00000 15.000 270.00000 2
770 2011 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 450.000 13.92000 450.000 13.92000 2
770 2012 REPLACE SINGLE GDRAIL TERMINAL POST EA 56.000 30.75000 56.000 30.75000 2
770 2023 REPLACE SGT OBJECT MARKER EA 10.000 1.00000 10.000 1.00000 2
770 2024 REPLACE SGT CABLE ANCHOR EA 10.000 1.00000 10.000 1.00000 2
770 2025 REPLACE SGT CABLE ASSEMBLY EA 10.000 1.00000 10.000 1.00000 2
770 2026 REPLACE SGT STRUT EA 10.000 1.00000 10.000 1.00000 2
770 2033 INSTALL BLOCKOUT EA 263.000 13.66297 263.000 13.66297 2
770 2034 REMOVE AND RESET SGT IMPACT HEAD EA 10.000 41.80000 10.000 41.80000 2
770 2035 REPAIR RAIL ELEMENT (CURVED RAIL) LF 129.000 16.04651 129.000 16.04651 2
770 2040 RAISE RAIL ELEMENT LF 75.000 5.00000 75.000 5.00000 2
788 2001 CONCRETE BEAM REPAIR EA     1.000 12,000.00000 1