AVERAGE LOW BID UNIT PRICE - MAINTENANCE - ABILENE DISTRICT

Last Update: Friday, August 12, 2016
ITEMS 712 2005 TO 786 6002
Items Items Bid Code Range
0100 - 0169
0247 - 0275
0310 - 0340
0400 - 0474
0500 - 0544
0658 - 0678
0712 - 0786
6038 - 6040
712 2005 - 786 6002
Item No Description Units July 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,805.900 370.52511 3
712 6008 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     1,571.980 618.81540 3
730 6001 STRIP MOWING AC     13,181.000 30.68556 13
730 6002 FULL - WIDTH MOWING AC     66,273.000 30.85497 14
730 6003 SPOT MOWING AC     150.000 31.81667 3
734 6001 LITTER REMOVAL AC     24,639.000 12.77803 10
745 2010 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (1) CYC     8.000 209.00000 1
745 2011 GROUNDS MAINT - PICNIC MOW / TRIM - SITE (2) CYC     8.000 209.00000 1
745 2100 JANITORIAL MAINT - PICNIC AREA - SITE (1) CYC     104.000 129.00000 1
745 2101 JANITORIAL MAINT - PICNIC AREA - SITE (2) CYC     104.000 129.00000 1
751 2026 LITTER PICKUP AC     1,102.640 46.88139 2
751 2028 MOWING, TRIMMING, AND EDGING AC     1,102.610 47.73583 2
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF     500.000 4.00000 1
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF     20,300.000 17.11153 2
770 6002 REPAIR RAIL ELEMENT (THRIE - BEAM) LF     70.000 6.40000 2
770 6003 REP RAIL ELMNT (THRIE - BM TRANS TO W - BM LF     50.000 6.92400 2
770 6004 REPAIR RAIL ELEMENT (CURVED RAIL) LF     275.000 30.67000 2
770 6006 RAISE RAIL ELEMENT LF     50.000 7.85000 2
770 6010 REM / REPL TIMBER / STL POST W / O CONC FN EA     1,225.000 33.67449 2
770 6011 REM / REPL TIMBER / STL POST W / CONC FN EA     700.000 49.45143 2
770 6017 REALIGN POSTS EA     430.000 20.18023 2
770 6018 INSTALL BLOCKOUT (TYPE SPECIFIED) EA     525.000 8.66000 2
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF     1,200.000 16.09167 2
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA     125.000 91.49920 2
770 6023 REPAIR OF TERMINAL ANCHORS POSTS EA     7.000 4.12714 2
770 6024 REPLACE TERMINAL ANCHOR POSTS EA     7.000 4.82143 2
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA     125.000 3,018.06000 2
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA     15.000 876.21667 2
770 6029 REM & RESET SGT IMPACT HEAD EA     45.000 63.35000 2
770 6030 REPLACE SGT CABLE ASSEMBLY EA     10.000 48.33000 2
770 6031 REPLACE SGT CABLE ANCHOR EA     10.000 48.72500 2
770 6032 REPLACE SGT STRUT EA     10.000 47.27000 2
770 6033 REPLACE SGT OBJECT MARKER EA     10.000 46.20500 2
771 6002 REPLACE POSTS (TL - 4) EA     2,325.000 116.21935 2
771 6004 CABLE SPLICE / TURNBUCKLE (TL - 4) EA     40.000 184.46875 2
771 6006 REPAIR CONCRETE FOUNDATION (TL - 4) EA     9.000 70.92444 2
771 6008 REPR OR REPLC CABLE BARR TERM SEC (TL - 4 EA     27.000 684.40111 2
771 6010 REPLACE CABLE (TL - 4) LF     1,250.000 2.83000 2
771 6011 CHECK / RE - TENSION CABLE EA     20.000 757.57500 2
776 6039 BOX BEAM MEDIAN BARRIER REPAIR LF     100.000 124.25000 1
776 6040 BOX BEAM MEDIAN BARRIER POST EA     20.000 150.11000 1
778 6002 CONCRETE RAIL REPAIR (MISC) LF     40.000 147.67000 2
778 6023 CONCRETE POST REPAIR EA     25.000 113.91400 2
778 6024 CONCRETE POST REPLACEMENT EA     15.000 268.75333 2
786 6002 CARBON FIBER REINF POLYMER STRENGTHNIN SF     290.000 75.00000 1