AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - BEAUMONT DISTRICT

Last Update: Friday, April 1, 2016
ITEMS 100 2001 TO 193 6016
Items Items Bid Code Range
0100 - 0193
0216 - 0292
0310 - 0361
0400 - 0496
0500 - 0560
0610 - 0685
0713 - 0785
1002 - 1122
3010 - 3268
4002 - 4033
5000 - 5369
6001 - 6110
100 2001 - 193 6016
Item No Description Units March 31, 2016 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
100 2001 PREPARING ROW AC     17.430 4,100.00000 1
100 6001 PREPARING ROW AC     10.000 299,900.00000 1
100 6002 PREPARING ROW STA     39.340 7,374.22471 3
104 6001 REMOVING CONC (PAV) SY     20,545.000 5.89696 3
104 6002 REMOVING CONC (PAV) CY     14.000 130.68000 1
104 6009 REMOVING CONC (RIPRAP) SY     6,513.000 21.60018 9
104 6015 REMOVING CONC (SIDEWALKS) SY     1,797.000 13.07000 1
104 6017 REMOVING CONC (DRIVEWAYS) SY     2,744.000 18.02425 9
104 6021 REMOVING CONC (CURB) LF     3,210.000 5.66791 3
104 6022 REMOVING CONC (CURB AND GUTTER) LF     411.000 21.78000 1
104 6027 REMOVING CONC (APPR SLAB) SY     8.900 75.00000 1
104 6028 REMOVING CONC (MISC) SY     276.300 34.28664 2
104 6032 REMOVING CONC (WHEELCHAIR RAMP) SY     124.000 17.42000 1
104 6037 REMOVE CONC (RAIL) LF     800.000 5.00000 1
104 6045 REMOVE CONC (MISC) EA     1.000 300.00000 1
104 6054 REMOVING CONCRETE (MOW STRIP) LF     6,589.000 7.94294 7
104 6064 REMOVING CONC (MISC) CY     17.000 178.82353 2
105 6008 REMOVING STAB BASE AND ASPH PAV (6") SY     14,914.000 5.00000 1
105 6016 REMOVING STAB BASE & ASPH PAV (16") SY     10,846.000 11.32436 2
105 6018 REMOVING STAB BASE AND ASPH PAV (7") SY     3,449.000 6.00000 1
105 6020 REMOVING STAB BASE & ASPH PAV (12") SY     567.000 13.07000 1
105 6026 REMOVE STAB BASE & ASPH PAV (13" - 18") SY     2,577.000 4.25000 1
105 6041 REMOVING STAB BASE AND ASPH PAV (8") SY     23,645.000 6.06758 2
105 6096 REMOV STAB BASE AND ASPH PAV (0" - 12") SY     3,829.000 6.00000 1
110 2001 EXCAVATION (ROADWAY) CY     506.000 19.00000 1
110 6001 EXCAVATION (ROADWAY) CY     167,035.000 14.05999 11
110 6002 EXCAVATION (CHANNEL) CY     3,443.000 9.13244 2
110 6003 EXCAVATION (SPECIAL) CY     995.000 39.68241 2
112 2001 SUBGRADE WIDENING (ORD COMP) STA     307.200 500.00000 1
112 6001 SUBGRADE WIDENING (ORD COMP) STA     1,465.610 621.01505 8
112 6002 SUBGRADE WIDENING (DENS CONT) STA     366.140 590.00000 1
132 2006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     13,967.000 26.00000 1
132 6001 EMBANKMENT (FINAL) (ORD COMP) (TY A) CY     3,079.000 30.50000 1
132 6002 EMBANKMENT (FINAL) (DENS CONT) (TY A) CY     2,808.000 26.85043 4
132 6003 EMBANKMENT (FINAL) (ORD COMP) (TY B) CY     15,396.000 16.40452 3
132 6005 EMBANKMENT (FINAL) (ORD COMP) (TY C) CY     1,755.000 35.87179 2
132 6006 EMBANKMENT (FINAL) (DENS CONT) (TY C) CY     86,134.000 11.05354 3
132 6017 EMBANKMENT (VEHICLE) (ORD COMP) (TY A) CY     4,357.000 34.00000 1
132 6019 EMBANKMENT (VEHICLE) (ORD COMP) (TY B) CY     407.000 24.63145 2
132 6025 EMBANKMENT (FINAL) (DENS CONT) (TY C1) CY     29,972.000 13.00000 1
134 6001 BACKFILL (TY A) STA     26.000 539.00000 1
134 6002 BACKFILL (TY B) STA     2,111.730 228.69113 9
134 6004 BACKFILL (TY A OR B) STA     482.280 280.00000 1
134 6011 BACKFILLING PAVEMENT EDGES CY     1,179.000 25.00000 1
150 6002 BLADING HR     172.450 84.74920 5
160 6001 FURNISHING AND PLACING TOPSOIL (4") STA     373.040 149.79144 2
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY     100,351.000 .62776 2
162 6002 BLOCK SODDING SY     3,746.000 2.56304 2
164 2009 BROADCAST SEED (TEMP) (WARM) SY     45,164.000 .12000 1
164 2011 BROADCAST SEED (TEMP) (COOL) SY     45,164.000 .12000 1
164 2033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     90,330.000 .12000 1
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY     185,289.000 .22435 3
164 6008 BROADCAST SEED (PERM) (URBAN) (CLAY) AC     2.330 3,000.00000 1
164 6009 BROADCAST SEED (TEMP) (WARM) SY     299,291.000 .16410 12
164 6010 BROADCAST SEED (TEMP) (WARM) AC     3.840 2,026.75781 2
164 6011 BROADCAST SEED (TEMP) (COOL) SY     296,291.000 .16151 11
164 6012 BROADCAST SEED (TEMP) (COOL) AC     1.510 525.00000 1
164 6021 CELL FBR MLCH SEED (PERM) (RURAL) (SANDY) SY     96,824.000 .40715 3
164 6023 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) SY     87,539.000 .30240 7
164 6024 CELL FBR MLCH SEED (PERM) (RURAL) (CLAY) AC     38.440 1,122.93184 6
164 6029 CELL FBR MLCH SEED (TEMP) (WARM) SY     2,198.000 .84901 2
164 6030 CELL FBR MLCH SEED (TEMP) (WARM) AC     10.520 1,100.00000 1
164 6033 DRILL SEEDING (PERM) (RURAL) (SANDY) SY     171,841.000 .14746 3
164 6039 DRILL SEEDING (PERM) (URBAN) (CLAY) SY     295.000 1.00000 1
166 6001 FERTILIZER AC     .310 1,612.87097 1
168 2001 VEGETATIVE WATERING MG     127.000 17.50000 1
168 6001 VEGETATIVE WATERING MG     12,382.514 14.71149 25
169 6007 SOIL RETENTION BLANKETS (CL 2) (TY G) SY     99.000 5.00000 1
192 6003 PLANT MATERIAL (3 - GAL) EA     5,857.000 22.00000 1
192 6004 PLANT MATERIAL (5 - GAL) EA     4,127.000 25.00000 1
192 6006 PLANT MATERIAL (30 - GAL) EA     917.000 240.00000 1
192 6007 PLANT MATERIAL (45 - GAL) EA     162.000 360.00000 1
192 6012 MULCH CY     565.000 50.00000 1
192 6021 PLANT MATERIAL (5 GAL) (TREE) EA     12.000 33.78000 1
193 6001 PLANT MAINTENANCE MO     24.000 2,500.00000 1
193 6004 PLANT REPLACEMENT (3 - GAL) EA     117.000 8.00000 1
193 6005 PLANT REPLACEMENT (5 - GAL) EA     82.000 9.00000 1
193 6006 VEGETATIVE WATERING MG     7,320.000 .01000 1
193 6010 PLANT REPLACEMENT (30 GAL) EA     93.000 .01000 1
193 6016 PLANT REPLACEMENT (45 GAL) EA     17.000 .01000 1